You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
DEVELOPMENT OF A DYNAMIC OPERATIONAL RISK MODEL TO SUPPORT RISK MANAGEMENT OF NUCLEAR POWER PLANTS
SBC: Accident Prevention Group Topic: N/ACURRENT ACTIVITY WITHIN THE NRC AND THE NUCLEAR INDUSTRY SEEKS TO EXPLOIT THE BENEFITS OF PRA IN RISK-BASED APPROACHES TO RELIEVE REGULATORY BURDEN ON THE ECONOMICALLY THREATENED NUCLEAR POWER PLANTS. THE ACCIDENT PREVENTION GROUP HAS BEEN DEVELOPING THE CONCEPT OF AN INTEGRATED RISK MANAGEMENT PROGRAM (IRMP) TOWARD SUCH GOALS. A KEY ELEMENT OF AN IRMP IS AN "OPERATIONAL RISK MODEL" OF THE NPP THA ...
SBIR Phase I 1994 Nuclear Regulatory Commission -
COMPUTERIZED EMERGENCY OPERATION PROCEDURES RESEARCH
SBC: Accident Prevention Group Topic: N/AN/A
SBIR Phase I 1992 Nuclear Regulatory Commission -
AN ADAPTING FINITE ELEMENT MODEL FOR UNSATURATED POROUS MEDIA
SBC: Advanced Projects Research, Incorporated Topic: N/AN/A
SBIR Phase I 1992 Nuclear Regulatory Commission -
DEVELOPMENT OF TOOLS FOR SAFETY ANALYSIS OF CONTROL SOFTWARE IN ADVANCED REACTORS
SBC: Advanced Systems Concepts Topic: N/AN/A
SBIR Phase I 1992 Nuclear Regulatory Commission -
Extending the Dynamic Flowgraph Methodology (DFM) to Model Human Performance and Team Effects
SBC: ASCA, INC. Topic: N/AN/A
SBIR Phase II 1996 Nuclear Regulatory Commission -
Slowdown, goddammit
SBC: CONTINENTAL CONTROLS AND DESIGN, INC. Topic: N/AEarly in Phase I of this project we begin testing and can deliver a n extremely flexible prototype helmsman's vertical acceleration display and recording system. This low cost marinized PC based device can present acceleration historiesof any position of the boat in multiple formats on a high resolution sunlight readable display. Like an aircraft "black box", but with more memory, it can archive ...
SBIR Phase I 1997 Department of DefenseSpecial Operations Command -
Miniature RF Receiving Antennas
SBC: Delfin Systems Topic: N/AThe Phase I technical objective is to design a series of small receiving antennas which operate in the HF, VHF, and UHF frequency ranges (approximately 1 MHz to 1500 MHz) and then to build and test prototypes of the designs. The antennas are physically small in size and man-packable. Conventional antenna design approaches have constraints which can result in physically large structures, especially ...
SBIR Phase II 1996 Department of DefenseSpecial Operations Command -
Small Virtual Receiving Antenna
SBC: Delfin Systems Topic: N/AThe Phase I technical objective is to design a small "virtual" receiving antenna which will operate in the HF, VHF, and UHF frequency ranges (approximately 1 MHz to 1500 MHz) and then to build and test a laboratory prototype. The virtual antenna will be capable of duplicating electrically, but not physically, the wide variety of antennas necessary to receive HF, VHF, and UHF signals. The virtual a ...
SBIR Phase I 1994 Department of DefenseSpecial Operations Command -
Miniature RF Receiving Antennas
SBC: Delfin Systems Topic: N/AN/A
SBIR Phase I 1994 Department of DefenseSpecial Operations Command -
Development of Self-Repairing Concrete Containers of Radioactive Waste Using Superelastic Reinforcement
SBC: DPD, Inc. Topic: N/AN/A
SBIR Phase II 1996 Nuclear Regulatory Commission