You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Ultrafast Polysilylene Scintillators

    SBC: Adherent Technologies, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Energy
  2. A HIGH POWER THICK TARGET DESIGN FOR IRRADIATION BY HIGH INTENSITY CHARGED PARTICLE BEAMS

    SBC: Amparo Corp.on            Topic: N/A

    PHASE I ADDRESSES A NEW APPROACH FOR THE DESIGN OF HIGH POWER NUCLEAR TARGETS USED FOR PRODUCTION OF RADIOISOTOPES BY HIGH ENERGY CHARGED PARTICLE BEAMS, NOTABLY HIGH ENERGY PROTONS. SUCH TARGETS WILL YIELD LARGER QUANTITIES OF RADIOACTIVE SPECIES THAN PRESENTLY AVAILABLE, EITHER FOR BASIC RESEARCH (E.G., STUDIES USING RADIOACTIVE BEAMS) OR FOR APPLIED PURPOSES (E.G., PRODUCTION OF MEDICAL RADIOI ...

    SBIR Phase I 1994 Department of Energy
  3. High Power Target Design for a Next Generation Radioactive Beam ISOL-Type Facility

    SBC: Amparo Corp.on            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Energy
  4. A HIGH POWER SOLID-STATE AMPLIFIER

    SBC: Amparo Corp.on            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of Energy
  5. Selective Separation of Multiple Radioactive Contaminants from Liquid Waste Streams

    SBC: Bader Engineering & Research,i            Topic: N/A

    Not Available The Department of Defense has expressed a need for an inexpensive inertial navigation system (INS), based on small-size, low-cost inertial sensors. Earlier designs could not be employed in many practical applications due to their restrictive specifications (high cost and low accuracy). Since 1995, the technical staff of VeNIS Technologies has been actively developing a design method ...

    SBIR Phase I 1999 Department of Energy
  6. THE PERIPHERAL COMPONENT INTERCONNECTION/SCALABLE COHERENT INTERFACE BRIDGE FOR DATA ACQUISITION AND COMPUTATION APPLICATIONS

    SBC: BI RA SYSTEMS, INC            Topic: N/A

    COALESCING THE FRAGMENTED INFORMATION ASSOCIATED WITH EACH EVENT OF A HIGH-ENERGY PHYSICS DETECTOR AND THEN PROCESSING IT AT THE RATES DEMANDED BY ACCELERATOR SYSTEMS ARE AMONG THE LARGEST CHALLENGES IN THE PHYSICS COMMUNITY. NEW DETECTOR SYSTEMS CONTINUE TO INCREASE THE NUMBER OF MEASURED PARAMETERS AND SIMULTANEOUSLY INCREASE THE RESOLUTION OF DETECTOR COMPONENTS SO THAT THE VOLUME OF GENRATED ...

    SBIR Phase I 1994 Department of Energy
  7. A Low Cost Acoustic Property Sensor for Measuring Natural Gas Composition in Liquid Natural Gas (LNG) Powered Vehicles

    SBC: Commercial Electronics, Inc.            Topic: N/A

    86 A Low Cost Acoustic Property Sensor for Measuring Natural Gas Composition in Liquid Natural Gas (LNG) Powered Vehicles--Commercial Electronics, Inc., 801 North 15th Street, Broken Arrow, OK 74012-2838; (918) 251-0925 Mr. Scott Phillips, Principal Investigator Mr. Michael A. Phillips, Business Official DOE Grant No. DE-FG03-97ER82353 Amount: $75,000 Among the various alternative fuels propos ...

    SBIR Phase I 1997 Department of Energy
  8. ENHANCED SIMULATOR TRAINING PROGRAM FOR OPERATORS AT MULTI-UNIT PLANTS.

    SBC: Corpe Corp.            Topic: N/A

    AT MULTI-UNIT NUCLEAR GENRATING STATIONS, CONTROL ROOM OPERATORS ARE GENERALLY LICENSED TO OPERATE ALL SIMILAR UNITS. SIMULATOR TRAINING CONDUCTED AT THE LICENSEE TRAINING FACILITY OCCURS ON ONE SIMULATOR WHICH MAY NOT EXACTLY MIMIC ANY UNIT. INADEQUATE TRAINING ON UNIT-TO-UNIT AND UNIT-TO-SIMULATOR DIFFERENCES, IN CONJUNCTION WITH LIMITED PER-PERSON SIMULATOR TRAINING HOURS, CAN RESULT IN INCREAS ...

    SBIR Phase I 1994 Nuclear Regulatory Commission
  9. Imaging the Distribution of Reservoir Properties with Time

    SBC: Correlations Company            Topic: N/A

    Not Available The proposed solution to ultra-fast concrete and steel cutting is to simultaneously increase hardness and toughness of a cutting tool. Novel cellular cermet cutting tool inserts offer an order of magnitude increase in cutting rates compared to traditional carbide or ceramic cutting tool inserts. The actual form of a cellular insert will be in form of a coating (between 0.5mm and 1mm ...

    SBIR Phase I 1999 Department of Energy
  10. LAMINAR FLOW ELECTROSTATIC PRECIPITATION

    SBC: ENVIRONMENTAL ELEMENTS CORP.            Topic: N/A

    REGULATIONS GOVERNING THE CONTROL OF PARTICULATE EMISSIONS ARE BECOMING INCREASINGLY STRICT IN TERMS OF THE CONTROL EFFICIENCIES THEY REQUIRE. SEVERAL DRIVING FORCES ARE RESPONSIBLE FOR THIS TREND, FOREMOST OF WHICH IS THE NEED TO CONTROL TOXIC AIR EMISSIONS, SUCH AS TRACE METALS AND HEAVY ORGANIC COMPOUNDS. OTHER DRIVING FORCES INCLUDE THE AMBIENT AIR QUALITY REGULATIONS AND STATE AND LOCAL REG ...

    SBIR Phase I 1994 Department of Energy
US Flag An Official Website of the United States Government