You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. WEIGHING TRUCK COMBINATIONS IN MOTION, SOLELY ON THE TRACTOR

    SBC: Airsport Corp.            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of Transportation
  2. ON-BOARD BAR CODE DATA COLLECTION AND ANALYSIS SYSTEM

    SBC: B R Blackmarr & Assoc            Topic: N/A

    THE PROPOSED PROJECT WILL DETERMINE THE FEASIBILITY OF DEVELOPING A LOW-COST, INTEGRATED, BAR CODE TECHNOLOGY BASED INFORMATION SYSTEM WHICH CAN BE INSTALLED ON TRANSIT VEHICLES. THE PROJECT WILL RESULT IN A SURVEY BASED APPLICATION FEATURE REQUIREMENTS DEFINITION, A PHYSICALLY INTEGRATED HARDWARE AND OPERATING SYSTEM PLATFORM SPECIFICATION TO SUPPORT THE APPLICATIONS, A DETAILED APPLICATIONS SOFT ...

    SBIR Phase I 1994 Department of Transportation
  3. COMMERCIAL SPACE LAUNCH FREQUENCY REQUIRMENTS

    SBC: Berner, Lanphier & Assoc Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of Transportation
  4. ENHANCED SIMULATOR TRAINING PROGRAM FOR OPERATORS AT MULTI-UNIT PLANTS.

    SBC: Corpe Corp.            Topic: N/A

    AT MULTI-UNIT NUCLEAR GENRATING STATIONS, CONTROL ROOM OPERATORS ARE GENERALLY LICENSED TO OPERATE ALL SIMILAR UNITS. SIMULATOR TRAINING CONDUCTED AT THE LICENSEE TRAINING FACILITY OCCURS ON ONE SIMULATOR WHICH MAY NOT EXACTLY MIMIC ANY UNIT. INADEQUATE TRAINING ON UNIT-TO-UNIT AND UNIT-TO-SIMULATOR DIFFERENCES, IN CONJUNCTION WITH LIMITED PER-PERSON SIMULATOR TRAINING HOURS, CAN RESULT IN INCREAS ...

    SBIR Phase I 1994 Nuclear Regulatory Commission
  5. Improved Source Location Using Sensor-Arrays

    SBC: Cyltek, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of Transportation
  6. TRANSIT SYSTEM COMPUTER SIMULATION MODELS

    SBC: Decision Dynamics, Inc.            Topic: N/A

    THIS PROPOSAL DESCRIBES A MICRO-LEVEL STRATEGIC TRANSIT SIMULATION MODEL THAT QUANTIFIES THE DIFFICULT TRADEOFFS BETWEEN COST, PERFORMANCE AND TIME. THE MODEL UTILIZES SYSTEM DYNAMICS TO CAPTURE THE COMPLEX, NON-LINEAR FEEDBACK STRUCTURE THAT GOVERNS SYSTEM BEHAVIOR, INCORPORATING SUCH TRANSIT OPERATIONS AS VEHICLE MANAGEMENT, SERVICE LEVELS, FARES, RIDERSHIP, MARKETING, REVENUES, CONGESTION, POLL ...

    SBIR Phase I 1994 Department of Transportation
  7. Digital Waveform-based System for AE Measurement for NDT

    SBC: Dvp, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Transportation
  8. RESTRICTED VISIBILITY WARNING SYSTEM

    SBC: Ecotek International            Topic: N/A

    ECOTEK INTERNATIONAL PROPOSES AN ALL SOLID-STATE VISIBILITY MONITORING SYSETM THAT WILL BE USED TO MONITOR VISIBILITY CONDITIONS ALONG ROADWAYS AND WARN TRAVELERS OF LOW VISIBILITY CONDITIONS. THE PURPOSE OF THE SYSTEM IS TO REDUCE THE NUMBER OF MULTIPLE-VEHICLE COLLISIONS AND CONSEQUENT FATALITIES, INJURIES, AND PROPERTY DAMAGES. THE SYSTEM IS BASED ON AN INNOVATIVE APPROACH TO A WELL-ESTABLISHED ...

    SBIR Phase I 1994 Department of Transportation
  9. ROBUST, ACCURATE, NON-CONTACTING VIBRATION MEASUREMENT SYSTEM

    SBC: EPOCH ENGINEERING, INC.            Topic: N/A

    WHEN ROTATING MACHINERY DETERIORATES, VIBRTION PATTERSN CHANGE. WHEN BEARING FREQUENCIES APPEAR, THEN INCREASE IN AMPLITUDE, BEARING FAILURE LOOMS. THE SAME WITH VALVES; WHEN THEY LEAK, THEY VIBRATE. AS LEAKAGE INCREASES, THE VIBRATION PATTERN CHANGES. THERE ARE MANY OTHERS. THE KEY IS KNOWING WHERE AND HOW DEEPLY TO LOOK. THE KEY IN OLDER REACTOR PLANTS IS TO UNOBTRUSIVELY, ECONOMICALLY BACKFIT S ...

    SBIR Phase I 1994 Nuclear Regulatory Commission
  10. DEVELOPMENT OF IMPROVED TECHNIQUES FOR DYNAMIC PRA

    SBC: Frh, Inc.            Topic: N/A

    CHANGES IN PLANT STATUS, EITHER BEFORE OR DURING AN ACCIDENT SEQUENC CAN CONSIDERABLY AFFECT ITS OUTCOME; BOTH THE ACTURAL OUTCOME AND THAT PREDICTED BY PROBABILISTIC RISK ASSESSMENT. IN ORDER TO ACCURATELY REPRESENT THE POSSIBLE ACCIDENTS AND THEIR PROBABILITIES, THE PRA MODEL MUST CONSIDER THE DYNAMIC CHARACTER OF THE PLANT, IT'S SYSTEMS AND OPERATORS. A LIVING, DYNAMIC PRA IS ONE IN WHICH ALL T ...

    SBIR Phase I 1994 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government