You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. High Throughput Multiple Access Digital Wireless Communications

    SBC: AIMS, INC.            Topic: N/A

    We propose a radically innovative approach to the problem of multiple access communication which promises to revolutionize the modern communication industry by dramatically increasing network throughput. Our approach is based upon two major novel components: (i) hybrid time-frequency allication of communication channel resources, and(ii) non-orthogonal, i.e., overlaping, multiplexed signals. Toge ...

    SBIR Phase I 1996 Department of DefenseOffice of the Secretary of Defense
  2. Advanced Six-Degree-of-Freedom (6-D) Laser Measurement System

    SBC: AUTOMATED PRECISION, INC.            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of DefenseOffice of the Secretary of Defense
  3. Small Lot Repair/Manufacture of Microcircuit Boards by Laser Deposition

    SBC: Cm Consulting            Topic: N/A

    The final prototype of the Microcircuit Board Repair apparatus will be capable of laying down or lifting metal strips with micrometer dimensions. Under real time computer control, the translation stages will be fully automated or manually controlled. The end user will monitor the process in real time using a camera attached with the source. Laying down the metal lines will be done using Laser C ...

    SBIR Phase I 1996 Department of DefenseOffice of the Secretary of Defense
  4. ENHANCED SIMULATOR TRAINING PROGRAM FOR OPERATORS AT MULTI-UNIT PLANTS.

    SBC: Corpe Corp.            Topic: N/A

    AT MULTI-UNIT NUCLEAR GENRATING STATIONS, CONTROL ROOM OPERATORS ARE GENERALLY LICENSED TO OPERATE ALL SIMILAR UNITS. SIMULATOR TRAINING CONDUCTED AT THE LICENSEE TRAINING FACILITY OCCURS ON ONE SIMULATOR WHICH MAY NOT EXACTLY MIMIC ANY UNIT. INADEQUATE TRAINING ON UNIT-TO-UNIT AND UNIT-TO-SIMULATOR DIFFERENCES, IN CONJUNCTION WITH LIMITED PER-PERSON SIMULATOR TRAINING HOURS, CAN RESULT IN INCREAS ...

    SBIR Phase I 1994 Nuclear Regulatory Commission
  5. A FUZZY SET APPROACH FOR SEISMIC SAFETY MARGINS ASSESSMENT.

    SBC: Eda Consultants            Topic: N/A

    THE CONTRACTOR SHALL DEVELOP A FUZZY SET METHODOLOGY FOR UNCERTAINTY ANALYSIS IN PROBABILISTIC SEISMIC SAFETY ASSESSMENT OF NUCLEAR POWER PLANTS. FUZZY SET LOGIC WILL BEUSED FOR COLLECTING, QUANTIFYING AND PROPAGATING SUBJECTIVE,ENGINEERING JUDGEMENT USED IN THE UNCERTAINTY ANALYSIS. IN PHASE I, FEASIBILITY OF THE PROPOSED APPROACH WILL BE DEMONSTRATED BY APPLYING IT TO SELECTED PARTS OF A PROBABI ...

    SBIR Phase I 1987 Nuclear Regulatory Commission
  6. ROBUST, ACCURATE, NON-CONTACTING VIBRATION MEASUREMENT SYSTEM

    SBC: EPOCH ENGINEERING, INC.            Topic: N/A

    WHEN ROTATING MACHINERY DETERIORATES, VIBRTION PATTERSN CHANGE. WHEN BEARING FREQUENCIES APPEAR, THEN INCREASE IN AMPLITUDE, BEARING FAILURE LOOMS. THE SAME WITH VALVES; WHEN THEY LEAK, THEY VIBRATE. AS LEAKAGE INCREASES, THE VIBRATION PATTERN CHANGES. THERE ARE MANY OTHERS. THE KEY IS KNOWING WHERE AND HOW DEEPLY TO LOOK. THE KEY IN OLDER REACTOR PLANTS IS TO UNOBTRUSIVELY, ECONOMICALLY BACKFIT S ...

    SBIR Phase I 1994 Nuclear Regulatory Commission
  7. Data Compression Techniques for Portable Computing Environments

    SBC: Fastman, Inc.            Topic: N/A

    The capability to transmit digitized reports to rear echelon forces during an ongoing battle is a critical command and control component. However, projections of the amount of digital traffic over transmissions links raise the distinct possibility that the demand for digital information tranmitted across the battlefield will outstrip channel capacity. Being able to reduce the quantity of traffic ...

    SBIR Phase I 1996 Department of DefenseOffice of the Secretary of Defense
  8. DEVELOPMENT OF IMPROVED TECHNIQUES FOR DYNAMIC PRA

    SBC: Frh, Inc.            Topic: N/A

    CHANGES IN PLANT STATUS, EITHER BEFORE OR DURING AN ACCIDENT SEQUENC CAN CONSIDERABLY AFFECT ITS OUTCOME; BOTH THE ACTURAL OUTCOME AND THAT PREDICTED BY PROBABILISTIC RISK ASSESSMENT. IN ORDER TO ACCURATELY REPRESENT THE POSSIBLE ACCIDENTS AND THEIR PROBABILITIES, THE PRA MODEL MUST CONSIDER THE DYNAMIC CHARACTER OF THE PLANT, IT'S SYSTEMS AND OPERATORS. A LIVING, DYNAMIC PRA IS ONE IN WHICH ALL T ...

    SBIR Phase I 1994 Nuclear Regulatory Commission
  9. An Angular Multiplexed Holographic Memory System Based on a Compact High-Speed Electro-Optic Beam Deflector

    SBC: RADIANT RESEARCH, INC.            Topic: N/A

    Current angular multiplexed holographic memory systems are facing obstacles in the area of dynamic control of two dimensional page oriented data. In order to massively store high density two-dimensional images and access all these stored images in a very short time without any moving parts, an innovative page-addressing delfector is required. Existing page-addressing deflectors requires a moving ...

    SBIR Phase I 1997 Department of DefenseOffice of the Secretary of Defense
  10. Porous Sol-Gel Derived Ceramic Release Agent

    SBC: TPL, INC            Topic: N/A

    Breathable release coatings that can withstand processing conditions up to 750F are needed for use on ceramic tooling. In situ removal of volatiles in solvent-based composite processing is a critical issue that will enable production of high quality parts at lower cost per part. Current release coatings meet neither the temperature nor the solvent transport requirements of solvent-based composit ...

    SBIR Phase I 1997 Department of DefenseOffice of the Secretary of Defense
US Flag An Official Website of the United States Government