You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
MICRO COMPUTER BASED PARALLEL PROCESSING SYSTEM FOR CODE COMPUTATIONS
SBC: Risk Management Systems Topic: N/AN/A
SBIR Phase I 1988 Nuclear Regulatory Commission -
AUTOMATIC PRIME SOUNDING SELECTION RESEARCH
SBC: Zycor Inc. Topic: N/AN/A
SBIR Phase I 1988 Department of Commerce -
NEURAL NETWORK APPLICATIONS FOR CLOUD-TRACK WIND DETERMINATION
SBC: ATMOSPHERIC & ENVIRONMENTAL RESEARCH, INC. Topic: N/AWE PROPOSE TO APPLY ARTIFICIAL NEURAL NETWORKS TO THE DERIVATION OF CLOUD MOTION VECTORS FROM SATELLITE IMAGERY. IN PHASE I, WE WILL CONCENTRATE ON USING A NEURAL NETWORK IN THE FIRST STEP IN THE DERIVATIO OF CLOUD MOTION VECTORS, THE HEIGHT ASSIGNMENT AND TARGET SELECTION. THE NEURAL NETWORK COMBINES, AT EACH IMAGE PIXEL, BRIGHTNESS IN DIFFERENT CHANNELS TO DETERMINE CLOUD TYPE AND LEVEL (I.E., L ...
SBIR Phase I 1994 Department of Commerce -
ADVANCED SYSTEM FOR MINEHUNTING AND OCEANOGRAPHIC REMOTE SENSING
SBC: Atlantic Applied Research Corp Topic: N/AN/A
SBIR Phase I 1994 Department of Commerce -
PARALLEL METHODS FOR THE SCHROEDINGER EQUATION
SBC: Aware, Inc. Topic: N/AWE WILL DEVELOP WAVELET-BASED DOMAIN DECOMPOSITION PROCEDURES FOR THE SOLUTION OF THE INITIAL VALUE PROBLEM FOR THE SCHROEDINGER EQUATION ON MULTIDIMENSIONAL SPATIAL DOMAINS. ACCURATE AND PRACTICAL NUMERICAL CALCULATIONS WOULD BE OF GREAT USE IN THE IMPLEMENTATION AND EXTENSION OF THE BORN-OPPENHEIMER PROCEDURE. BEING BOTH COMPACTLY SUPPORTED AND ORTHOGONAL, WAVELETS COMBINE THE ADVANTAGES OF FINI ...
SBIR Phase I 1994 Department of Commerce -
RESISITVE HEAT CURED RESIN TRANSFER MOLDING OF ADVANCED COMPOSITES
SBC: Conductive Composites Tech,inc Topic: N/AN/A
SBIR Phase I 1994 Department of Commerce -
NO MOVING PARTS RAIN GAUGE
SBC: THE CORE GROUP, INC. Topic: N/ATHE U.S. WEATHER SERVICE PRESENTLY USES A "TIPPING BUCKET" RAIN GAUGE FOR MEASURING RAIN ACCUMULATION. THIS DEVICE IS SENSITIVE TO WIND AND MOTION (AS ON BUOYS), CANNOT MEASURE RAIN RATE, AND REQUIRES FREQUENT MAINTENANCE, BECAUSE OF MOVING PARTS. AN ALTERNATIVE DEVICE IS BEING PROPOSED, WHICH INCORPORATES A RIGID, RESONANT TUBE, CLOSED AT THE TOP BY AN ELECTRO-ACOUSTIC TRANSDUCER, AND AT THE BOTT ...
SBIR Phase I 1994 Department of Commerce -
THE DEVELOPMENT OF A LOW COST MANUFACTURING PROCESS FOR PRODUCTION OF HIGH QUALITY TITANIUM SURGICAL IMPLANT COMPONENTS
SBC: DYNAMET TECHNOLOGY, INC. Topic: N/AADVANCES IN TITANIUM ALLOY POWDER METALLURGY (P/M), UTILIZING HIGH PURITY STARTING POWDERS, HAVE RESULTED IN STATIC AND DYNAMIC MECHANICAL PROPERTIES COMPARABLE TO WROUGHT TITANIUM ALLOYS. THE DEVELOPMENTS OVERCOME EARLIER LIMITATIONS IN FATIGUE RESISTANCE WHICH RESTRICTED P/M TITANIUM USAGE FROM THE DEMANDING REQUIREMENTS OF SURGICAL IMPLANTS. DUE TO THE INHERENT ECONOMIES OF P/M PROCESSES, P/M T ...
SBIR Phase I 1994 Department of Commerce -
DEVELOPMENT OF A BUOY-MOUNTED CO2 ANALYZER
SBC: Endeco/ysi, Inc. Topic: N/APRECISE MEASUREMENTS ON CO2 UPTAKE BY THE OCEANS ARE NEEDED IN ORDER TO INCREASE OUR CURRENT UNDERSTANDING OF THE GLOBAL CO2 CYCLE, AND DORMULATE INTELLIGENT CO2 MANAGEMENT STRATEGIES. WE PROPOSE TO MONITOR THE CO2 PARTIAL PRESSURE DIFFERENTIAL AT THE AIR-SEA INTERFACE BY DEVELOPING A BUOY-MOUNTED CO2 ANALYZER. OCEAN BUOYS ARE USED FOR PHYSICAL OCEANOGRAPHIC AND METEOROLOGICAL MEASUREMENTS, AND TO ...
SBIR Phase I 1994 Department of Commerce -
A NEW METHODOLOGY FOR FAULT DETECTION OBSERVRS IN VAV SYSTEMS
SBC: GENSYM CORP. Topic: N/AEQUIPMENT INSTALLED IN BUILDINGS FOR HEATING, VENTILATION, AND AIR CONDITIONING IS BECOMING INCREASINGLY COMPLEX. OPERATION WITH CONFLICTING GOALS IS GETTING MORE DIFFICULT. METHODS ARE NEEDED TO SIGNIFICANTLY IMPROVE THE REAL-TIME DETECTION AND DIAGNOSIS OF FAULTS IN BUILDING EQUIPMENT. CURRENT APPROACHED TO SOLVING THIS PROBLEM DO NOT WORK WELL IN NONLINEAR SYSTEMS SUCH AS VAV, AND CAN GIVE INCO ...
SBIR Phase I 1994 Department of Commerce