You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. MWM Array Bending Stress and Crack Detection In-Line Inspection Module

    SBC: JENTEK SENSORS, INC.            Topic: 20PH1

    In-line inspection (ILI) is a cornerstone for pipeline integrity. Advances to ILI tools are essential to maintaining pipeline safety. Gaps exist for the detection of circumferential cracking (at and away from welds and dents) and bending stresses. Few technologies exist that can make reputable claims for stress measurement that are non-destructive, reliable, and appropriate for integration onto an ...

    SBIR Phase I 2020 Department of Transportation
  2. Artificial Intelligence for Monitoring Crossing Infrastructure and to Improve Grade Crossing Safety

    SBC: WI-TRONIX, LLC            Topic: 20FR2

    Founded in 2004, the mission of Wi-Tronix is to improve railway safety, operational efficiency, and service reliability, in real-time. We are the preferred connected solutions provider to over one-third of all locomotives in North America. Wi-Tronix is proposing to leverage our expertise in developing and making commercially available AI based technologies for autonomous highway-rail grade crossin ...

    SBIR Phase I 2020 Department of Transportation
  3. Improved Condition Monitoring of Traction Motors

    SBC: Sharma & Associates, Inc.            Topic: 190FR5

    Identification of defects and incipient failures before the breakdown of the equipment is recognized as an important maintenance activity in the railroad industry to improve efficiency and safety of the operation. It is well known that a proper implementation of condition monitoring improves the overall equipment reliability and reduces unexpected field failures. Traction motor faults can result i ...

    SBIR Phase I 2020 Department of Transportation
  4. WEIGHING TRUCK COMBINATIONS IN MOTION, SOLELY ON THE TRACTOR

    SBC: Airsport Corp.            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of Transportation
  5. "Rolling Deflectometer"

    SBC: Applied Research Associates, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of Transportation
  6. HYBRID METHOD FOR ASSESSMENT OF COGNITIVE REHEARSAL PROFICIENCY MAINTENANCE.

    SBC: CHARLES RIVER ANALYTICS, INC.            Topic: N/A

    WE PROPOSE TO IDENTIFY THE EFFECT OF COGNITIVE REHEARSAL ON REGAINING AND MAINTAINING FLYING SKILLS. BY COGNITIVE REHEARSAL (CR) WE MEAN ACTIVITIES PERFORMED BY THE FAA INSPECTOR DURING FLIGHT PROFICIENCY CHECKS SUCH AS CHECKLIST VERIFICATION, VERIFICATION OF ABNORMAL PROCEDURE EXECUTION, AND THE LIKE. PRECISE DATA ABOUT THE TYPES OF SKILLS MAINTAINED VIA CR, THE RATE OF DECAY OF THE SKILLS NOT MA ...

    SBIR Phase I 1994 Department of Transportation
  7. Self-Monitoring Surveillance System for Prestressing Tendons

    SBC: Construction Technology            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  8. RESTRICTED VISIBILITY WARNING SYSTEM

    SBC: Ecotek International            Topic: N/A

    ECOTEK INTERNATIONAL PROPOSES AN ALL SOLID-STATE VISIBILITY MONITORING SYSETM THAT WILL BE USED TO MONITOR VISIBILITY CONDITIONS ALONG ROADWAYS AND WARN TRAVELERS OF LOW VISIBILITY CONDITIONS. THE PURPOSE OF THE SYSTEM IS TO REDUCE THE NUMBER OF MULTIPLE-VEHICLE COLLISIONS AND CONSEQUENT FATALITIES, INJURIES, AND PROPERTY DAMAGES. THE SYSTEM IS BASED ON AN INNOVATIVE APPROACH TO A WELL-ESTABLISHED ...

    SBIR Phase I 1994 Department of Transportation
  9. Chemical-Free Deicing- A Systems Approach

    SBC: FOSTER-MILLER, INC.            Topic: N/A

    This proposal describes an innovative approach to non-chemical deicing of aircraft which focuses on new technology which could provide revolutionary improvement in the performance of a relatively mature deicing technique. This combined systems approach could be readily incorporated into existing aircraft and ground support equipment. We propose to develop a permanent anti-icing surface treatment ...

    SBIR Phase I 1996 Department of Transportation
  10. "An Object Oriented Network Data Model for Transportation GIS"

    SBC: Gis/trans, Ltd            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of Transportation
US Flag An Official Website of the United States Government