You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. MICRO COMPUTER BASED PARALLEL PROCESSING SYSTEM FOR CODE COMPUTATIONS

    SBC: Risk Management Systems            Topic: N/A

    N/A

    SBIR Phase I 1988 Nuclear Regulatory Commission
  2. A HIGH RESOLUTION CDTE ARRAY MONITORING SYSTEM FOR MONITORING CONTAMINATION IN SOILS

    SBC: Radiation Safety Engineering, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Nuclear Regulatory Commission
  3. Self-Monitoring Surveillance System for Prestressing Tendons

    SBC: Construction Technology            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  4. Development of a Performance Assessment Process Controller

    SBC: Innovative Tech. Solutions            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  5. Inservice Diagnostics of Motor Operated Valves

    SBC: ACENTECH INCORPORATED            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  6. Intelligent Flexible Fixturing System

    SBC: ACT Research Corporation            Topic: N/A

    Two approaches are proposed to attack the problems of fixturing process. First, a novel hardware holding system, Dexterous Vise, is proposed. Functionally, a single Dexterous Vise is capable of revealing four faces of the clamped workpiece to the cutting tool without re-fixturing, which actually increases one degree of freedom to the machine tool. A pair of Dexterous Vises, the "Dual-Vise", ena ...

    SBIR Phase I 1996 Department of DefenseOffice of the Secretary of Defense
  7. Liquid Rocket Engine Combustion Components Fabricated from ZrB2/BN Composite Using Electroconsolidation (TM) Rapid Densification Technique

    SBC: Sensintel Inc.            Topic: N/A

    The goal of this program is to design and fabricate selected liquid rocket engine combustion components. This goal will be accomplished by developing a low-cost, near net-shape technology for fabrication and rapid densification of ablation and oxidation-resistant LRE components for a wide variety of Air Force missions. The material which will be used for this purpose is zirconium diboride/boron ...

    SBIR Phase I 1996 Department of DefenseOffice of the Secretary of Defense
  8. Demonstration of Capacitors, Inductors, and Switches for Cryogenic Power Converters

    SBC: Cryo Energy Systems, Inc.            Topic: N/A

    In order to realize the full potential of cryogenic power converters, it is vital to develop the technology for cryogenic capacitors and inductors, in order to be combined with the switching semiconductors. Capacitors with high dielectric constant and high voltage withstand at cryogenic temperatures with low weight and volume lie on the critical path. The proposed work focuses on innovative tech ...

    SBIR Phase I 1996 Department of DefenseOffice of the Secretary of Defense
  9. Hydrogen Supply System for Small PEM Fuel Cell Stacks

    SBC: ANALYTIC POWER LLC            Topic: N/A

    To Operate effectively, PEM small fuel cells stacks need a chemical hydride hydrogen generator. The chemical hydride digital reactor suggested in the proposed program will provide about 2.5 kWH of energy in a5 pound package.--almost three times the energy density of a BA5590 battery. Studies and experiments will be conducted with spe ...

    SBIR Phase I 1996 Department of DefenseOffice of the Secretary of Defense
  10. High Efficiency Cryogenic Power Conversion

    SBC: AMERICAN SUPERCONDUCTOR CORPORATION            Topic: N/A

    Proposed is the technical development and design of the electronics and cooling systems for a 1 megawatt cryogenically cooled inverter suitable for use in a wide range of applications, including Uninterruptable Power Suplies (UPS) and motors in the +1000 HP range. The proposed work will provide a logical progression to the development that has already been done by American Superconductor Corp. I ...

    SBIR Phase I 1996 Department of DefenseOffice of the Secretary of Defense
US Flag An Official Website of the United States Government