You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Crosswind and Range Measurement Lidar for Sniper's Sights
SBC: BRIMROSE CORPORATION OF AMERICA Topic: N/AN/A
SBIR Phase I 1997 Department of DefenseSpecial Operations Command -
Self-Monitoring Surveillance System for Prestressing Tendons
SBC: Construction Technology Topic: N/AN/A
SBIR Phase I 1995 Nuclear Regulatory Commission -
ENHANCED SIMULATOR TRAINING PROGRAM FOR OPERATORS AT MULTI-UNIT PLANTS.
SBC: Corpe Corp. Topic: N/AAT MULTI-UNIT NUCLEAR GENRATING STATIONS, CONTROL ROOM OPERATORS ARE GENERALLY LICENSED TO OPERATE ALL SIMILAR UNITS. SIMULATOR TRAINING CONDUCTED AT THE LICENSEE TRAINING FACILITY OCCURS ON ONE SIMULATOR WHICH MAY NOT EXACTLY MIMIC ANY UNIT. INADEQUATE TRAINING ON UNIT-TO-UNIT AND UNIT-TO-SIMULATOR DIFFERENCES, IN CONJUNCTION WITH LIMITED PER-PERSON SIMULATOR TRAINING HOURS, CAN RESULT IN INCREAS ...
SBIR Phase I 1994 Nuclear Regulatory Commission -
EB Curing of VARTM Fabricated Maritime Composite Structures
SBC: DAMILIC Corporation Topic: N/ADAMILIC and others have already demonstrated that EB cured composite structures have mechanical properties comparable to those of a standard thermally cured part. The objective of this Phase I program has is to demonstrate that standard, commercially available, resin transfer molding techniques can be combined with the high speed electron beam process to produce maritime structures and higher spe ...
SBIR Phase I 1996 Department of DefenseSpecial Operations Command -
Multiple-ping High Resolution Minehunting Sonar for High Speed, Wide Area Searches
SBC: Datasonics, Inc. Topic: N/AThere is a requirement for a seafloor mapping system that will provide high resolution imagery in very shallow water when rigidly mounted to a 24 foot boat that is advancing at up to 10 knots. In this Phase I effort we propose to determine the feasibility of meeting this requirement with a prototype multiple-ping chirp side-scan sonar to operate at high frequencies and high ping rates, where multi ...
SBIR Phase I 1994 Department of DefenseSpecial Operations Command -
ROBUST, ACCURATE, NON-CONTACTING VIBRATION MEASUREMENT SYSTEM
SBC: EPOCH ENGINEERING, INC. Topic: N/AWHEN ROTATING MACHINERY DETERIORATES, VIBRTION PATTERSN CHANGE. WHEN BEARING FREQUENCIES APPEAR, THEN INCREASE IN AMPLITUDE, BEARING FAILURE LOOMS. THE SAME WITH VALVES; WHEN THEY LEAK, THEY VIBRATE. AS LEAKAGE INCREASES, THE VIBRATION PATTERN CHANGES. THERE ARE MANY OTHERS. THE KEY IS KNOWING WHERE AND HOW DEEPLY TO LOOK. THE KEY IN OLDER REACTOR PLANTS IS TO UNOBTRUSIVELY, ECONOMICALLY BACKFIT S ...
SBIR Phase I 1994 Nuclear Regulatory Commission -
DEVELOPMENT OF IMPROVED TECHNIQUES FOR DYNAMIC PRA
SBC: Frh, Inc. Topic: N/ACHANGES IN PLANT STATUS, EITHER BEFORE OR DURING AN ACCIDENT SEQUENC CAN CONSIDERABLY AFFECT ITS OUTCOME; BOTH THE ACTURAL OUTCOME AND THAT PREDICTED BY PROBABILISTIC RISK ASSESSMENT. IN ORDER TO ACCURATELY REPRESENT THE POSSIBLE ACCIDENTS AND THEIR PROBABILITIES, THE PRA MODEL MUST CONSIDER THE DYNAMIC CHARACTER OF THE PLANT, IT'S SYSTEMS AND OPERATORS. A LIVING, DYNAMIC PRA IS ONE IN WHICH ALL T ...
SBIR Phase I 1994 Nuclear Regulatory Commission -
Acoustic and Magnetic Signature Reduction for Outboard Engines Using Metal Matrix Composites
SBC: METAL MATRIX CAST COMPOSITES, LLC (DBA M Topic: N/AN/A
SBIR Phase I 1995 Department of DefenseSpecial Operations Command -
Development of a Performance Assessment Process Controller
SBC: Innovative Tech. Solutions Topic: N/AN/A
SBIR Phase I 1995 Nuclear Regulatory Commission -
Low Signature Electric Propulsion System
SBC: FOSTER-MILLER, INC. Topic: N/AN/A
SBIR Phase I 1995 Department of DefenseSpecial Operations Command