You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. GAMMA RAY SPECTROMETER/DOSIMETER

    SBC: Applied Inventions Corp.            Topic: N/A

    N/A

    SBIR Phase I 1990 Nuclear Regulatory Commission
  2. Self-Monitoring Surveillance System for Prestressing Tendons

    SBC: Construction Technology            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  3. Multiple-ping High Resolution Minehunting Sonar for High Speed, Wide Area Searches

    SBC: Datasonics, Inc.            Topic: N/A

    There is a requirement for a seafloor mapping system that will provide high resolution imagery in very shallow water when rigidly mounted to a 24 foot boat that is advancing at up to 10 knots. In this Phase I effort we propose to determine the feasibility of meeting this requirement with a prototype multiple-ping chirp side-scan sonar to operate at high frequencies and high ping rates, where multi ...

    SBIR Phase I 1994 Department of DefenseSpecial Operations Command
  4. Acoustic and Magnetic Signature Reduction for Outboard Engines Using Metal Matrix Composites

    SBC: METAL MATRIX CAST COMPOSITES, LLC (DBA M            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of DefenseSpecial Operations Command
  5. Development of a Performance Assessment Process Controller

    SBC: Innovative Tech. Solutions            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  6. ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    MRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  7. Low Signature Electric Propulsion System

    SBC: FOSTER-MILLER, INC.            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of DefenseSpecial Operations Command
  8. Inservice Diagnostics of Motor Operated Valves

    SBC: ACENTECH INCORPORATED            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  9. MICRO COMPUTER BASED PARALLEL PROCESSING SYSTEM FOR CODE COMPUTATIONS

    SBC: Risk Management Systems            Topic: N/A

    N/A

    SBIR Phase I 1988 Nuclear Regulatory Commission
  10. Low Signature, Multiple-Pole Motor

    SBC: Rct Systems, Inc.            Topic: N/A

    SatCon Technology Corporation proposes to design, fabricate, and demonstrate a quiet, compact, variable speed, electric propulsion system with four magnetic signatures to be used in small mobile underwater vehicles. The goal of this program is to develop a propulsion system concept having minimal electromagnetic and acoustic noise characteristics for use in any special operations maritime environ ...

    SBIR Phase I 1995 Department of DefenseSpecial Operations Command
US Flag An Official Website of the United States Government