A HIGH RESOLUTION CDTE ARRAY MONITORING SYSTEM FOR MONITORING CONTAMINATION IN SOILS
SBC: Radiation Safety Engineering, Inc. Topic: N/AN/A
SBIR Phase I 1994 Nuclear Regulatory Commission -
A PORTABLE IMAGING SYSTEM FOR NONDESTRUCTIVE EXAMINATION OF NUCLEAR POWER PLANT COMPONENTS
SBC: TPL, INC Topic: N/ATHE DIFFICULTY IN PREDICTING STRUCTURAL DEGRADATION RATES FOR NUCLEAR POWER PLANT COMPONENTS DUE TO CORROSION AND OTHER FACTORS HAS LED TO THE NEED FOR COSTLY, TIME CONSUMING INSPECTIONS AND INCREASED COST FROM INTENTIONALLY OVERDESIGNED COMPONENTS. THE SITUATION INDICATES A SERIOUS, UNMET NEED FOR A SIMPLE BUT ACCURATE SYSTEM FOR REAL- TIME, IN SITU, NONDESTRUCTIVE ANALYSIS OF NUCLEAR POWER PLANT ...
SBIR Phase II 1994 Nuclear Regulatory Commission -
A PORTABLE IMAGING SYSTEM FOR NONDESTRUCTIVE EXAMINATION OF NUCLEAR POWER PLANT COMPONENTS
SBC: TPL, INC Topic: N/AN/A
SBIR Phase I 1992 Nuclear Regulatory Commission -
A SIMPLE METHOD FOR SOLUBILITY TESTING OF RADIONUCLIDES ON AIR FILTER
SBC: Radiation Safety Engineering, Inc. Topic: N/ATHE SOLUBILITY OF AIRBORNE RADIONUCLIDES IS AN IMPORTANT PARAMETER IN THE ASSESSMENT OF INHALATION HAZARDS IN THE WORKPLACE AND IN THE INTERPRETATION OF ROUTINE BIOASSAY DATA. SOLUBILITY IS A MAJOR FACTOR IN DETERMINING THE METABOLISM OF THE INHALED ISOTOPES AND DISSOLUTION RATES OF ALPHA-EMITTING COMPOUNDS WHICH ARE PARTICULARLY IMPORTANT DUE TO THEIR HIGH RADIOTOXICITY. CURRENT SOLUBILITY TESTIN ...
SBIR Phase II 1994 Nuclear Regulatory Commission -
CONTINUOUS SPECTROGRAPHIC ANALYSIS OF VANADOUS AND VANADIC IONS
SBC: Omni Tech International Ltd Topic: N/AN/A
SBIR Phase I 1992 Nuclear Regulatory Commission -
Development of Self-Repairing Concrete Containers of Radioactive Waste Using Superelastic Reinforcement
SBC: DPD, Inc. Topic: N/AN/A
SBIR Phase II 1996 Nuclear Regulatory Commission -
EVALUATION OF GENERAL FAILURE TYPES IN SAFETY ANALYSIS
SBC: John Wreathall & Company Topic: N/ATHIS WORK IS TO DEVELOP A METHOD TO IMPROVE THE ABILITY OF THE USNRC TO EVALUATE THE OPERATIONAL SAFETY SIGNIFICANCE OF OCCURANCES AT NUCLEAR POWER PLANTS. PERHAPS THE AREA OF GREATEST SAFETY SIGNIFICANCE IS HUMAN PERFORMANCE, BUT THE TECHNIQUES USED BY NRC DO NOT EVALUATE HUMAN PERFORMANCE IN ANY SYSTEMIC WAY. THE WORK IS PROPOSED TO BE PERFORMED IN THREE STAGES, AND BUILDS ON METHODS THAT HAVE B ...
SBIR Phase I 1992 Nuclear Regulatory Commission -
MICRO COMPUTER BASED PARALLEL PROCESSING SYSTEM FOR CODE COMPUTATIONS
SBC: Risk Management Systems Topic: N/AN/A
SBIR Phase I 1988 Nuclear Regulatory Commission -
WORK UNDERLOAD IN MODERN NPP CIBTRIK ROOMS
SBC: UES INC Topic: N/ATHE PROBLEM ADDRESSED IS THAT FUTURE NUCLEAR POWER PLANT CONTROL ROOM OPERATOR WORKLOAD WILL CONSIST PRIMARILY OF PASSIVE MONITORING FOR EXTENDED PERIODS OF TIME. THIS WILL RESULT IN DIFFICULTY MAINTAINING OPERATOR ALERTNESS AND PERFORMANCE CAPABILITY. THE TWO OBJECTIVES OF THIS PROJECT ARE TO PROVIDE THE CAPABILITY TO PREDICT AND EVALUATE THE EFFECT OF WORK UNDERLOADON HUMAN PERFORMANCE IN NPP CO ...
SBIR Phase II 1994 Nuclear Regulatory Commission