You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
GAMMA RAY SPECTROMETER/DOSIMETER
SBC: Applied Inventions Corp. Topic: N/AN/A
SBIR Phase I 1990 Nuclear Regulatory Commission -
INNOVATIVE RESEARCH TESTBED
SBC: Applied Resonance Technology Topic: N/AN/A
SBIR Phase I 1990 Department of DefenseMissile Defense Agency -
NEGATIVE LENS LASER
SBC: CANDELA CORPORATION Topic: N/AN/A
SBIR Phase I 1990 Department of DefenseMissile Defense Agency -
INTEGRATED AUDIO-VISUAL HEADSET DISPLAY TERMINAL FOR MAINTENANCE PERSONNEL
SBC: IBIS TECHNOLOGY CORP. Topic: N/AN/A
SBIR Phase I 1990 Department of DefenseMissile Defense Agency -
NON-DESTRUCTIVE TESTING OF SIMOX STRUCTURES USING SPECTROSCOPIC ELLIPSOMETRY
SBC: IBIS TECHNOLOGY CORP. Topic: N/AN/A
SBIR Phase I 1990 Department of DefenseMissile Defense Agency -
SILICON-ON-SAPPHIRE REPLACEMENT TECHNOLOGY FOR RADIATION HARDENED CIRCUITS
SBC: Kopin Corporation Topic: N/AN/A
SBIR Phase I 1990 Department of DefenseMissile Defense Agency -
INTEGRATED CIRCUIT SUBSTRATE
SBC: Merix Corp Topic: N/AN/A
SBIR Phase I 1990 Department of DefenseMissile Defense Agency -
ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT
SBC: MISSION RESEARCH CORP. Topic: N/AMRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...
SBIR Phase I 1990 Nuclear Regulatory Commission -
CROSSED-FIELD WIGGLER
SBC: MISSION RESEARCH CORP. Topic: N/AN/A
SBIR Phase I 1990 Department of DefenseMissile Defense Agency -
PERFORMANCE ANALYSIS AND PRELIMINARY DESIGN OF A PRECISION TRACKER
SBC: Optical Instruments Corp Topic: N/AN/A
SBIR Phase I 1990 Department of DefenseMissile Defense Agency