You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
COST REDUCTION DESIGNS OF A LARGE RANGE OF HIGH PERFORMANCE PM ALTERNATORS AND CONTROLS WITH A PARALLEL EMPHASIS ON...
SBC: Active Technologies Inc. Topic: N/AN/A
SBIR Phase I 1990 Department of DefenseDefense Advanced Research Projects Agency -
SBIR Phase I: Tertiary Recycling Process for Polymer-Based Automotive Components
SBC: Adherent Technologies, Inc. Topic: N/AN/A
SBIR Phase I 1997 National Science Foundation -
SBIR Phase I: Liquid Crystalline Thermoset (LCT) Adhesives for High-Temperature Applications
SBC: Adherent Technologies, Inc. Topic: N/AN/A
SBIR Phase I 1997 National Science Foundation -
SBIR Phase I: Moisture-Resistant Composite Finishes
SBC: Adherent Technologies, Inc. Topic: N/AN/A
SBIR Phase I 1997 National Science Foundation -
Develop Exercise Software to Run on ARPA JANUS-3D Warqame in UNIX Environment
SBC: Advanced Systems Technology, Inc. Topic: N/AN/A
SBIR Phase I 1994 Department of DefenseDefense Advanced Research Projects Agency -
BROADBAND PLASMA BARRIERS FOR HARDENING OPTICAL SENSORS IN THE 8-12 MICRON REGION
SBC: Antropix Corpon Topic: N/AANTROPIX CORPORATION PROPOSES TO OBTAIN TIME - RESOLVE OPTICAL PROPERTIES MEASUREMENTS (PLASMA OPACITY IN THE 8 - 12 MICRON SPECTRAL REGION, AS WELL AS STARK BROADENING AND RELATIVE INTENSITY PARAMETERS) ON BROADBAND PLASMA BARRIERS (BPBS) GENERATED BY LASER ACTIVATION OF ALKALI METAL (E.G., NA AND CS) VAPORS. SIMILAR MEASUREMENTS WILL BE COMPLETED ON KNOWN PHASE TRANSITION MATERIALS (PTMS) SUCH A ...
SBIR Phase I 1988 Department of DefenseDefense Advanced Research Projects Agency -
TOOLS FOR FIFTH-GENERATION EDUCATIONAL ENVIRONMENTS
SBC: APPLIED HUMAN FACTORS INC Topic: N/AEMERGING FIFTH-GENERATION EDUCATIONAL ENVIRONMENTS ARE INCREASING THE FLOW OF INFORMATION BETWEEN THE STUDENT AND THE INSTRUCTIONAL DELIVERY SYSTEM TO LEVELS NEVER BEFORE POSSIBLE. ONE GROUP OF FIFTH-GENERATION SYSTEMS, CONCEPTUALLY DESCENDED FROM GRAPHICS-BASED SIMULATORS, USES VIRTUAL REALITY (VR) TECHNOLOGY TO CAPTURE MOTOR RESPONSES AND ALTER A SIMULATED WORLD ACCORDINGLY. A SECOND GROUP, CO ...
SBIR Phase I 1994 National Science Foundation -
EXPERIMENTAL EVALUATION OF THE INFLUENCE OF GEOLOGY ON EXPLOSIVE SOURCE YIELD DETERMINATION
SBC: Applied Research Associates, Inc. Topic: N/AN/A
SBIR Phase I 1990 Department of DefenseDefense Advanced Research Projects Agency -
SBIR Phase I: The Use of Doppler Radar for Estimating the Areal Extent of Strong Winds in Thunderstorms
SBC: Applied Research Associates, Inc. Topic: N/AN/A
SBIR Phase I 1997 National Science Foundation -
EXPERIMENTAL EVALUATION OF THE INFLUENCE OF SITE LAYERING AND BURST DEPTH ON RADIATED SEISMIC ENERGY
SBC: Applied Research Associates, Inc. Topic: N/AN/A
SBIR Phase I 1990 Department of DefenseDefense Advanced Research Projects Agency