You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. DEVELOPMENT OF A MINIATURIZED ELECTRONIC COMPASS FOR USE IN PROVIDING DIRECTIONAL GUIDANCE TO VISUALLY IMPAIRED INDIVIDUALS

    SBC: Arctos Research            Topic: N/A

    DESIGN AND FABRICATION OF SOLID-STATE DIRECTION-INDICATING APPARATUS, WITH TILT-IMMUNITY, THAT PROVIDES AN AUDIBLE OR TACTILE INTERFACE WITH THE USER. REDUCED SIZE TO ALLOW ENCAPSULATION IN A TYPICAL WALKING CANE. A DEVICE WILL BE DESIGNED THAT WILL PROVIDE A VISUALLY IMPAIRED PERSON WITH AN INDICATION OF HORIZONTAL DIRECTION, WITH RESPECT TO THE EARTH'S MAGNETIC FIELD. THE DEVICE WILLALSO SIGNAL ...

    SBIR Phase I 1990 Department of Education
  2. ALTERNATE INPUT DEVICE MOUSE EMULATOR

    SBC: Computability Corp            Topic: N/A

    N/A

    SBIR Phase I 1988 Department of Education
  3. RESTORATION OF THE COMPETITIVE CAPABILITY AND PROFITABILITY OF RANDOLPH SHEPPARD VENDOR BUSINESSES BY INTRODUCING INNO-VATIVE EQUIPMENT TECHNOLOGIES AND NEW FOODSERVICE MARKETING PROGRAMS AND PRODUCT CONCEPTS.

    SBC: General Research And Analysis            Topic: N/A

    FOR 50 YEARS THE RANDOLPH-SHEPPARD VENDING PROGRAM HAS MEANTEMPLOYMENT AND INDEPENDENCE TO THE BLIND. TODAY, HOWEVER, THE PROGRAMS AND ITS VENDOR MEMBERS FACE SEVERE CHANGES IN THE BUSINESS ENVIRONMENT THAT THREATEN THE LONG TERM ECO-NOMIC STABILITY OF MANY INDIVIDUAL OPERATORS AND PERHAPS THEENTIRE PROGRAM. THIS NEW BUSINESS ENVIRONMENT FEATURES IN- TENSIFIED COMPETITION FROM THE PRIVATE SECTOR, ...

    SBIR Phase I 1988 Department of Education
  4. ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    MRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  5. CONTINUOUS SPECTROGRAPHIC ANALYSIS OF VANADOUS AND VANADIC IONS

    SBC: Omni Tech International Ltd            Topic: N/A

    N/A

    SBIR Phase I 1992 Nuclear Regulatory Commission
  6. MICRO COMPUTER BASED PARALLEL PROCESSING SYSTEM FOR CODE COMPUTATIONS

    SBC: Risk Management Systems            Topic: N/A

    N/A

    SBIR Phase I 1988 Nuclear Regulatory Commission
  7. A PORTABLE IMAGING SYSTEM FOR NONDESTRUCTIVE EXAMINATION OF NUCLEAR POWER PLANT COMPONENTS

    SBC: TPL, INC            Topic: N/A

    N/A

    SBIR Phase I 1992 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government