You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
HIGH-TEMPERATURE FINISH FOR AMB-21 MATRIX COMPOSITES
SBC: Adherent Technologies, Inc. Topic: N/AN/A
SBIR Phase I 1996 National Aeronautics and Space Administration -
Novel Adhesives For Space Applications
SBC: Adherent Technologies, Inc. Topic: N/AN/A
SBIR Phase I 1997 National Aeronautics and Space Administration -
UNIVERSAL BOOK MANAGEMENT SYSTEM
SBC: Advanced Applications Topic: N/ANASA SPACE SCIENTISTS TEND TO USE INTEGRATED DATA OF MULTIPLE TYPES. FOR EXAMPLE, THE OBSERVATIONS COLLECTED BY THE EXOSAT SATELLITE ARE MADE UP OF DATABASE ROWS, IMAGES, SPREADSHEETS (SPECTRA, LIGHTCURVES), TEXT INDEXES, ETC. ALSO, THE DIFFERENT DATA TYPES COME FROM HETEROGENEOUS MANAGEMENT SYSTEMS. FOR EXAMPLE, DATABASES MAY BE STORED ININGRES, SYBASE, OR ORACLE; TEXT IN TROFF, TEK, OR ASCII. TH ...
SBIR Phase II 1994 National Aeronautics and Space Administration -
VIEWCACHE: AN INCREMENTAL DATABASE ACCESS METHOD FOR DISTRIBUTED LIBRARY SYSTEMS
SBC: Advanced Communications Tech Topic: N/AN/A
SBIR Phase I 1988 National Aeronautics and Space Administration -
AMTEC CONDENSER DESIGN FOR ZERO-G OPERATION
SBC: ADVANCED MODULAR POWER SYSTEMS Topic: N/AADEQUATE ELECTRICAL POWER FOR SPACECRAFT OPERATIONS IS A CRUCIAL MISSION TASK. THE ISOTOPE HEAT SOURCES USED IN RADIO-ISOTOPE-THERMOELECTRIC-GENERATORS FOR MANY NASA MISSIONS ARE EXPENSIVE. FOR A GIVEN ELECTRICAL POWER, THERMAL-TO-ELECTRIC CONVERSION WITH AMTEC RATHER THAN CONVENTIONAL THERMOELECTRIC CONVERTERS SHOULD PERMIT REDUCTION OF THE GPHS COMPLEMENT BY A FACTOR OF 3. THE ESTIMATED COST SAV ...
SBIR Phase II 1992 National Aeronautics and Space Administration -
Sodium-Modulated, AMTEC Electrode Deposition
SBC: ADVANCED MODULAR POWER SYSTEMS Topic: N/AA key component in the Alkali Metal Thermal to Electric Converter (AMTEC) is the electrode that is generally sputter deposited on the beta"-alumina solid electrolyte (BASE). Electrode deposition, as it is now practiced however, is a random process that covers active sites on the BASE and places many electrode pore openings at inactive sites. This proposal describes a novel fabrication process for ...
SBIR Phase I 1994 National Aeronautics and Space Administration -
A PROPULSION SYSTEM FOR AN UPPER STAGE OF A LAUNCH VEHICLE
SBC: Advent Engineering Services, Inc. Topic: N/AN/A
SBIR Phase I 1996 National Aeronautics and Space Administration -
Multipurpose Upper Stage Propulsion Using High Energy Density Fuel
SBC: Advent Engineering Services, Inc. Topic: N/AN/A
SBIR Phase I 1997 National Aeronautics and Space Administration -
A FREQUENCY-TUNABLE 3 OCTAVE RADAR FOR VEHICLE EXHAUST PLUMEAND TOXIC SUBSTANCES MONITOR
SBC: Aeromet, Inc. Topic: N/AN/A
SBIR Phase I 1992 National Aeronautics and Space Administration -
The Origin And Significance Of Electrical Stratospheric Phenomena
SBC: Aerospace Engineering Group Topic: N/AN/A
SBIR Phase I 1997 National Aeronautics and Space Administration