You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Multi-Source Meteorological System for Data, Maps, Analyses, and Graphics

    SBC: Accu-weather, Inc.            Topic: N/A

    This SBIR project will bring about a major advance and improvement to existing meteorological data systems by utilizing new technological opportunities to develop a meteorological workstation merging data and graphics products from multiple independent systems to yield a single display system that permits efficient assimilation of the information by a user. This system would greatly enhance the ab ...

    SBIR Phase I 1994 National Aeronautics and Space Administration
  2. HIGH-TEMPERATURE FINISH FOR AMB-21 MATRIX COMPOSITES

    SBC: Adherent Technologies, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1996 National Aeronautics and Space Administration
  3. Novel Adhesives For Space Applications

    SBC: Adherent Technologies, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1997 National Aeronautics and Space Administration
  4. Sodium-Modulated, AMTEC Electrode Deposition

    SBC: ADVANCED MODULAR POWER SYSTEMS            Topic: N/A

    A key component in the Alkali Metal Thermal to Electric Converter (AMTEC) is the electrode that is generally sputter deposited on the beta"-alumina solid electrolyte (BASE). Electrode deposition, as it is now practiced however, is a random process that covers active sites on the BASE and places many electrode pore openings at inactive sites. This proposal describes a novel fabrication process for ...

    SBIR Phase I 1994 National Aeronautics and Space Administration
  5. A PROPULSION SYSTEM FOR AN UPPER STAGE OF A LAUNCH VEHICLE

    SBC: Advent Engineering Services, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1996 National Aeronautics and Space Administration
  6. Multipurpose Upper Stage Propulsion Using High Energy Density Fuel

    SBC: Advent Engineering Services, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1997 National Aeronautics and Space Administration
  7. A FREQUENCY-TUNABLE 3 OCTAVE RADAR FOR VEHICLE EXHAUST PLUMEAND TOXIC SUBSTANCES MONITOR

    SBC: Aeromet, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1992 National Aeronautics and Space Administration
  8. MAGNETOENCEPHALOGRAPHY FOR REAL-TIME COMPUTER CONTROL

    SBC: AMERIGENICS, INC.            Topic: N/A

    N/A

    SBIR Phase I 1985 National Aeronautics and Space Administration
  9. RECORDING PILOT EYE MOVEMENT INFORMATION ON A DIGITAL FLIGHT DATA RECORDER

    SBC: AMERIGENICS, INC.            Topic: N/A

    N/A

    SBIR Phase I 1985 National Aeronautics and Space Administration
  10. HIGH-RESOLUTION AUTOMATED METHOD FOR LOCATING, IDENTIFYING, AND MEASURING SURFACE

    SBC: Apd Cryogenics Inc.            Topic: N/A

    N/A

    SBIR Phase I 1992 National Aeronautics and Space Administration
US Flag An Official Website of the United States Government