You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. DEVELOPMENT OF A DYNAMIC OPERATIONAL RISK MODEL TO SUPPORT RISK MANAGEMENT OF NUCLEAR POWER PLANTS

    SBC: Accident Prevention Group            Topic: N/A

    CURRENT ACTIVITY WITHIN THE NRC AND THE NUCLEAR INDUSTRY SEEKS TO EXPLOIT THE BENEFITS OF PRA IN RISK-BASED APPROACHES TO RELIEVE REGULATORY BURDEN ON THE ECONOMICALLY THREATENED NUCLEAR POWER PLANTS. THE ACCIDENT PREVENTION GROUP HAS BEEN DEVELOPING THE CONCEPT OF AN INTEGRATED RISK MANAGEMENT PROGRAM (IRMP) TOWARD SUCH GOALS. A KEY ELEMENT OF AN IRMP IS AN "OPERATIONAL RISK MODEL" OF THE NPP THA ...

    SBIR Phase I 1994 Nuclear Regulatory Commission
  2. COMPUTERIZED EMERGENCY OPERATION PROCEDURES RESEARCH

    SBC: Accident Prevention Group            Topic: N/A

    N/A

    SBIR Phase I 1992 Nuclear Regulatory Commission
  3. AN ADAPTING FINITE ELEMENT MODEL FOR UNSATURATED POROUS MEDIA

    SBC: Advanced Projects Research, Incorporated            Topic: N/A

    N/A

    SBIR Phase I 1992 Nuclear Regulatory Commission
  4. DEVELOPMENT OF TOOLS FOR SAFETY ANALYSIS OF CONTROL SOFTWARE IN ADVANCED REACTORS

    SBC: Advanced Systems Concepts            Topic: N/A

    N/A

    SBIR Phase I 1992 Nuclear Regulatory Commission
  5. Helmsman's Recording Accelerometer

    SBC: Conrad Technologies, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of DefenseSpecial Operations Command
  6. Slowdown, goddammit

    SBC: CONTINENTAL CONTROLS AND DESIGN, INC.            Topic: N/A

    Early in Phase I of this project we begin testing and can deliver a n extremely flexible prototype helmsman's vertical acceleration display and recording system. This low cost marinized PC based device can present acceleration historiesof any position of the boat in multiple formats on a high resolution sunlight readable display. Like an aircraft "black box", but with more memory, it can archive ...

    SBIR Phase I 1997 Department of DefenseSpecial Operations Command
  7. THE WORK PROPOSED IN THIS EFFORT IS DIRECTED TOWARDS DETERMINING THE CORRELATION BETWEEN OBSERVED AIRBORNE RADIOIODINE CONCENTRATIONS IN THE AUXILIARY AND FUEL HANDLING BUILDINGS AT TMI-2 FOLLOWING THE ACCIDENT IN 1979 WITH DIURNAL TEMPERATURE VARIATIONS.

    SBC: Daniel & Associates Inc.            Topic: N/A

    THE WORK PROPOSED IN THIS EFFORT IS DIRECTED TOWARDS DETERMINING THE CORRELATION BETWEEN OBSERVED AIRBORNE RADIOIODINE CONCENTRATIONS IN THE AUXILIARY AND FUEL HANDLING BUILDINGS AT TMI-2 FOLLOWING THE ACCIDENT IN 1979 WITH DIURNAL TEMPERATURE VARIATIONS. APPROXIMATELY 5000 MEASUREMENTS WERE MADE DURING THE PERIOD APRIL-JULY, 1979 INDESIGNATED AREAS OF THE AUXILIARY/FUEL HANDLING BUILDING AND THE ...

    SBIR Phase I 1985 Nuclear Regulatory Commission
  8. Small Virtual Receiving Antenna

    SBC: Delfin Systems            Topic: N/A

    The Phase I technical objective is to design a small "virtual" receiving antenna which will operate in the HF, VHF, and UHF frequency ranges (approximately 1 MHz to 1500 MHz) and then to build and test a laboratory prototype. The virtual antenna will be capable of duplicating electrically, but not physically, the wide variety of antennas necessary to receive HF, VHF, and UHF signals. The virtual a ...

    SBIR Phase I 1994 Department of DefenseSpecial Operations Command
  9. Miniature RF Receiving Antennas

    SBC: Delfin Systems            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of DefenseSpecial Operations Command
  10. Application of EFP Warheads with Enhanced Effects Material for Mine Neutralization

    SBC: Dyna East Corp.            Topic: N/A

    We propose to develop an improved Explosively-Formed Penetrator (EFP) warhead that in its basic application projects a slug that pentrates the mine's case and detonates the iner explosive. In an advanced, alternate mode, the warhead will project a penetrator capable of neutralization through deflagration. The alternative mode employs reative intermetallic materials in the warhead's main component, ...

    SBIR Phase I 1994 Department of DefenseSpecial Operations Command
US Flag An Official Website of the United States Government