You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY20 is not expected to be complete until September, 2021.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

  1. Effective Math Instruction for Adult Learners on CD-ROM

    SBC: CompuTaught, Inc.            Topic: N/A

    The goal of this project is to improve remedial math instruction for adults by combining (a) an effective adult education model; (b) an effective instructional design method, with; (c) the multimedia capabilities of the computer. The innovative combination of these components will produce an effective math program designed specifically for adult learners that can be used at home, at school, or ...

    SBIR Phase I 1997 Department of Education
  2. A PROGRAMMABLE ELECTRONIC CUEING AID FOR INDIVIDUALS WITH COGNITIVE IMPAIRMENTS

    SBC: Deaton Ashcraft Group Inc.            Topic: N/A

    INDIVIDUALS WHO ARE BORN WITH MENTAL RETARDATION OR WHO SUSTAIN TRAUMATIC BRAIN INJURIES OFTEN ARE LEFT WITH COGNITIVE IMPAIRMENTS. THESE IMPAIRMENTS AFFECT THE INDIVIDUAL'S ATTENTION, ORIENTATION, MEMORY, VERBAL OR PERCEPTUAL ABILITIES, AND SOCIAL REASONING. PARTICULARLY, MANY INDIVIDUALS WITH COGNITIVE IMPAIRMENTS HAVE A POOR SENSE OF JUDGEMENT, DECISION MAKING, AND INITIATION. THUS, THEIR AB ...

    SBIR Phase I 1994 Department of Education
  3. RESTORATION OF THE COMPETITIVE CAPABILITY AND PROFITABILITY OF RANDOLPH SHEPPARD VENDOR BUSINESSES BY INTRODUCING INNO-VATIVE EQUIPMENT TECHNOLOGIES AND NEW FOODSERVICE MARKETING PROGRAMS AND PRODUCT CONCEPTS.

    SBC: General Research And Analysis            Topic: N/A

    FOR 50 YEARS THE RANDOLPH-SHEPPARD VENDING PROGRAM HAS MEANTEMPLOYMENT AND INDEPENDENCE TO THE BLIND. TODAY, HOWEVER, THE PROGRAMS AND ITS VENDOR MEMBERS FACE SEVERE CHANGES IN THE BUSINESS ENVIRONMENT THAT THREATEN THE LONG TERM ECO-NOMIC STABILITY OF MANY INDIVIDUAL OPERATORS AND PERHAPS THEENTIRE PROGRAM. THIS NEW BUSINESS ENVIRONMENT FEATURES IN- TENSIFIED COMPETITION FROM THE PRIVATE SECTOR, ...

    SBIR Phase I 1988 Department of Education
  4. EVALUATION OF GENERAL FAILURE TYPES IN SAFETY ANALYSIS

    SBC: John Wreathall & Company            Topic: N/A

    THIS WORK IS TO DEVELOP A METHOD TO IMPROVE THE ABILITY OF THE USNRC TO EVALUATE THE OPERATIONAL SAFETY SIGNIFICANCE OF OCCURANCES AT NUCLEAR POWER PLANTS. PERHAPS THE AREA OF GREATEST SAFETY SIGNIFICANCE IS HUMAN PERFORMANCE, BUT THE TECHNIQUES USED BY NRC DO NOT EVALUATE HUMAN PERFORMANCE IN ANY SYSTEMIC WAY. THE WORK IS PROPOSED TO BE PERFORMED IN THREE STAGES, AND BUILDS ON METHODS THAT HAVE B ...

    SBIR Phase I 1992 Nuclear Regulatory Commission
  5. ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    MRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  6. A NOVEL MICROACTUATOR FOR THE REFRESHABLE BRAILLE DISPLAY SYSTEM

    SBC: ORBITAL RESEARCH INC            Topic: N/A

    THIS WORK WILL DEVELOP A NOVEL MICROACTUATOR MECHANISM FOR USE WITH A COMPUTER INTERFACED REFRESHABLE BRAILLE DISPLAY SYSTEM (RBDS). THE MICROACTUATOR WILL BE DESIGNED TO OPERATE WITHIN THE POWER LIMITATIONS OF THE RBDS. IT WILL ALSO BE DESIGNED TO MEET THE REFRESH AND RESPONSE RATES TOLERANCES WHICH HAVE BEEN ESTABLISHED DURING PHASE I. THE MICROACTUATOR WILL BE DESIGNED, AND A FABRICATION PLA ...

    SBIR Phase I 1994 Department of Education
  7. MICRO COMPUTER BASED PARALLEL PROCESSING SYSTEM FOR CODE COMPUTATIONS

    SBC: Risk Management Systems            Topic: N/A

    N/A

    SBIR Phase I 1988 Nuclear Regulatory Commission
  8. IMPROVED NEUTRON SPECTROMETER AND EXPOSURE METER

    SBC: Shonka Research Associates            Topic: N/A

    THE UNCERTAINTY IN MEASURING NEUTRON DOSE EQUIVALENT RATES RESULTS IN UNCERTAINTY IN ASSIGNMENT OF THE PROPER DOSE TO OCCUPATIONAL RECORDS AND CAN RESULT IN IMPROPER IMPLEMENTATION OF CONTROLS TO LIMIT THE EXPOSURE. A NOVEL PORTABLE NEUTRON SPECTROMETER IS PROPOSED WHICH WILL REDUCE THE UNCERTAINTY OF SUCH MEASUREMENTS TO LESS THAN 20%. MANYCOMPONENTS OF THIS DEVICE ARE COMMERCIALLY AVAILABLE. SYS ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  9. DEVELOPMENT OF A CONTAMINATION MONITOR USING VISUAL IDENTIFICATION

    SBC: Shonka Research Associates            Topic: N/A

    N/A

    SBIR Phase I 1992 Nuclear Regulatory Commission
  10. A COMPACT SIMULATOR FOR TRAINING OF OPERATORS AND MAINTENANCE PERSONNEL

    SBC: TECHNOLOGY INTERNATIONAL INCORPORATED OF VIRGINIA            Topic: N/A

    TII SHALL PROCURE, DESIGN, CONSTRUCT, AND TEST A COMPACT PORTABLE SIMULATOR CAPABLE OF EMULATING NUCLEAR POWER STATION-OPERATOR (NPS-OP) INTERFACES, AND EVALUATE AND TEST VARIOUS INTERFACE DESIGNS. THE SUMULATOR WILL BE DESIGNED FOR OPERATOR TRAINING ON ADVANCED REACTORS AND WILL BE USED IN SIMULATING OPERATORS SCENARIOS AND RECORDING AND DOCUMENTING REAL-TIME INPUT FROM THE OPERATOR. THE SIMULATO ...

    SBIR Phase I 1992 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government