You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Ultrafast Polysilylene Scintillators

    SBC: Adherent Technologies, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Energy
  2. A FIBER OPTIC ARRAY DETECTOR

    SBC: Amparo Corp.on            Topic: N/A

    WIRE CHAMBERS ARE A CLASS OF PARTICLE TRACK DETECTORS THAT HAVE FOUND WIDE APPLICATIONS IN HIGH ENERGY PARTICLE PHYSICS EXPERIMENTS. LARGE WIRE CHAMBER DETECTORS HAVE BECOME RATHER COMPLEX, REQUIRING MANY FAST ELECTRONIC CIRCUITS. THIS INVESTIGATION OFFERS THE POTENTIAL OF SIMPLIFICATION AND COST REDUCTION FOR LARGE WIRE CHAMBER DETECTORS. THE PHASE I EFFORT IS INVESTIGATING THE FEASIBILITY OF USI ...

    SBIR Phase I 1992 Department of Energy
  3. A HIGH POWER THICK TARGET DESIGN FOR IRRADIATION BY HIGH INTENSITY CHARGED PARTICLE BEAMS

    SBC: Amparo Corp.on            Topic: N/A

    PHASE I ADDRESSES A NEW APPROACH FOR THE DESIGN OF HIGH POWER NUCLEAR TARGETS USED FOR PRODUCTION OF RADIOISOTOPES BY HIGH ENERGY CHARGED PARTICLE BEAMS, NOTABLY HIGH ENERGY PROTONS. SUCH TARGETS WILL YIELD LARGER QUANTITIES OF RADIOACTIVE SPECIES THAN PRESENTLY AVAILABLE, EITHER FOR BASIC RESEARCH (E.G., STUDIES USING RADIOACTIVE BEAMS) OR FOR APPLIED PURPOSES (E.G., PRODUCTION OF MEDICAL RADIOI ...

    SBIR Phase I 1994 Department of Energy
  4. High Power Target Design for a Next Generation Radioactive Beam ISOL-Type Facility

    SBC: Amparo Corp.on            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Energy
  5. A HIGH POWER SOLID-STATE AMPLIFIER

    SBC: Amparo Corp.on            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of Energy
  6. OPTICALLY SWITCHED, HIGH-GRADIENT ELECTRON-BEAM ACCELE- RATOR-

    SBC: Beam Energetics, Inc.            Topic: N/A

    ADVANCES IN TECHNOLOGY INDICATE THAT IT MAY BE POSSIBLE TO DEVISE A RELATIVELY SIMPLE HIGH ACCELERATION GRADIENT ELECTRON BEAM ACCELERATOR BY COMBINING A LOW-EMITTANCE, LASER-DRIVEN PHOTOCATHODE WITH A RADIAL LINE LINAC WITH ULTRA-SHORT PULSES CONTROLLED BY A PICOSECOND PULSE LASER (SUGGESTED BY W. WILLIS). GRADIENTS OF 1 GEV/METER MAY BE POSSIBLE. THE FEASIBILITY OF THIS CONCEPT WILL BE ASSESSED ...

    SBIR Phase I 1985 Department of Energy
  7. THE PERIPHERAL COMPONENT INTERCONNECTION/SCALABLE COHERENT INTERFACE BRIDGE FOR DATA ACQUISITION AND COMPUTATION APPLICATIONS

    SBC: BI RA SYSTEMS, INC            Topic: N/A

    COALESCING THE FRAGMENTED INFORMATION ASSOCIATED WITH EACH EVENT OF A HIGH-ENERGY PHYSICS DETECTOR AND THEN PROCESSING IT AT THE RATES DEMANDED BY ACCELERATOR SYSTEMS ARE AMONG THE LARGEST CHALLENGES IN THE PHYSICS COMMUNITY. NEW DETECTOR SYSTEMS CONTINUE TO INCREASE THE NUMBER OF MEASURED PARAMETERS AND SIMULTANEOUSLY INCREASE THE RESOLUTION OF DETECTOR COMPONENTS SO THAT THE VOLUME OF GENRATED ...

    SBIR Phase I 1994 Department of Energy
  8. A RUGGED ON-LINE MULTIPLE INPUT FIBER OPTIC-BASED RAMAN SENSOR FOR INDUSTRIAL PROCESS MONITORING AND CONTROL

    SBC: Chromex Inc.            Topic: N/A

    RESEARCH IN THIS PROJECT IS BEING CONDUCTED TO DEVELOP A COMPACT, RUGGED, ON-LINE, MULTIPLE INPUT, FIBER OPTIC-BASED RAMAN PROCESS MONITORING AND CONTROL SENSOR CAPABLE OF OPERATING IN HARSH INDUSTRIAL ENVIRONMENTS. CHARGE-COUPLED DEVICE ARRAY DETECTOR-BASED RAMAN SPECTROSCOPY, EMPLOYING LASER DIODES AND OPTICAL FIBER PROBES, CAPABLE OF SENSITIVITIES COMPARABLE TO OR BETTER THAN THE FOURIER TRANSF ...

    SBIR Phase I 1992 Department of Energy
  9. THE DEVELOPMENT OF A MULTIPLE INPUT SPECTROMETER FOR PROCESSMONITORING APPLICATIONS

    SBC: Chromex Inc.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of Energy
  10. A Low Cost Acoustic Property Sensor for Measuring Natural Gas Composition in Liquid Natural Gas (LNG) Powered Vehicles

    SBC: Commercial Electronics, Inc.            Topic: N/A

    86 A Low Cost Acoustic Property Sensor for Measuring Natural Gas Composition in Liquid Natural Gas (LNG) Powered Vehicles--Commercial Electronics, Inc., 801 North 15th Street, Broken Arrow, OK 74012-2838; (918) 251-0925 Mr. Scott Phillips, Principal Investigator Mr. Michael A. Phillips, Business Official DOE Grant No. DE-FG03-97ER82353 Amount: $75,000 Among the various alternative fuels propos ...

    SBIR Phase I 1997 Department of Energy
US Flag An Official Website of the United States Government