You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Neural Networks Tools and Techniques for Arithmetic Training of Children with Learning Disabilities

    SBC: Adaptive Network Solutions            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of Education
  2. GAMMA RAY SPECTROMETER/DOSIMETER

    SBC: Applied Inventions Corp.            Topic: N/A

    N/A

    SBIR Phase I 1990 Nuclear Regulatory Commission
  3. Development of Spatial Skills: Linking Software and Physical

    SBC: ChainWave Systems, Inc            Topic: N/A

    This research will explore the use of a virtual polyhedron modeling environment which creates nets, or patterns, for a polyhedron created on the screen, in the teaching of geometry and spatial skills. When the net is printed, cut, folded, and glued together, a 3-dimensional model of the original polyhedron is created. We propose to examine the use of this tool in an instructional setting, to dete ...

    SBIR Phase I 1997 Department of Education
  4. Effective Math Instruction for Adult Learners on CD-ROM

    SBC: CompuTaught, Inc.            Topic: N/A

    The goal of this project is to improve remedial math instruction for adults by combining (a) an effective adult education model; (b) an effective instructional design method, with; (c) the multimedia capabilities of the computer. The innovative combination of these components will produce an effective math program designed specifically for adult learners that can be used at home, at school, or ...

    SBIR Phase I 1997 Department of Education
  5. TALKING WITH CHILDREN

    SBC: Early Childhood Assoc Inc.            Topic: N/A

    TALKING WITH CHILDREN ADDRESSES A SUBSTANTIAL NEED FOR INNOVATIVE TRAINING STRATEGIES THAT IMPROVE THE COMPETENCE OF TEACHER AIDES (TA'S) IN STRATEGIES KNOWN TO PROMOTE LANGUAGE PRODUCTION AND ACQUISITION IN STUDENTS (K-3) WITH LIMITED ENGLISH PROFICIENCY (LEP). PHASE I. OBJECTIVES FOR TALKING WITH CHILDREN ARE TO PRODUCE: AN ANNOTATED CURRICU ...

    SBIR Phase I 1994 Department of Education
  6. DEVELOPING "JUMP START": FAMILY LITERACY KITS IN SCHOOL PROGRAMS K-3

    SBC: Early Childhood Assoc Inc.            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of Education
  7. A MULTI-PLATFORM COMPUTER-ASSISTED INDIVIDUAL FAMILY SERVICEPLAN FOR EARLY INTERVENTION PROGRAMS

    SBC: Educom Inc            Topic: N/A

    THIS PROJECT IS DESIGNED TO DEVELOP A COMPUTER-ASSISTED METHOD OF DEVELOPING THE INDIVIDUAL FAMILY SERVICE PLAN (IFSP) REQUIRED OF EARLY INTERVENTION PROGRAMS AS PART OF THE 1986 EDUCATION OF THE HANDICAPPED ACT. BECAUSE OF THE CONSTANTLY CHANGING DEVELOPMENTAL PHASES OF THE BIRTH TO FIVE YEAR OLD POPULATION, SPECIFIC LONG TERM ACHIEVEMENTS ARE VERY DIFFICULT FOR PROFESSIONALS TO PREDICT. AS A RES ...

    SBIR Phase I 1990 Department of Education
  8. ENHANCED REMOVAL OF RADIOACTIVE PARTICLES BY FLUOROCARBON SURFACTANT SOLUTIONS

    SBC: Entropic Systems, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1992 Nuclear Regulatory Commission
  9. ENHANCEMENT TO STEAM GENERATOR TUBING EDDY CURRENT INSPECTION BY APPLICATION OF THERMALLY INDUCED STRESSES

    SBC: FOSTER-MILLER, INC.            Topic: N/A

    STEAM GENERATOR TUBES REPRESENT A UNIQUE PART OF THE REACTOR COOLANT SYSTEM (RCS). LEAKAGE FROM ANY OTHER PART OF THE RCS IS CAPTURED BY THE CONTAINMENT BUILDING, BUT STEAM GENERATOR TUBE LEAKAGE IS TRANSPORTED OUT OF THE CONTAINMENT BUILDING ALONG WITH THE STEAM, WHICH IS NORMALLY UNCONTAMINATED. STEAM GENERATOR TUBES, CONSEQUENTLY, DESERVE, AND RECEIVE SPECIAL CONSIDERATION. THE ASSURANCE OF STE ...

    SBIR Phase I 1992 Nuclear Regulatory Commission
  10. NONDESTRUCTIVE EXAMINATION TO DIRECTLY MEASURE STEAM GENERATOR TUBE U-BEND VIBRATORY RESPONSE

    SBC: FOSTER-MILLER, INC.            Topic: N/A

    ON FEBRUARY 9, 1991, AT THE MIHAMA UNIT 2 NUCLEAR POWER STATION, OPEARTED BY KANSAI ELECTRIC CORPORATION, A STEAM GENERATOR TUBE RUPTURED AND RELEASED APPROXIMATELY 9,000 GALLONS OF REACTOR COOLANT INTO THE SECONDARY SYSTEM. THE LEAKAGE CAUSED A RAPID DEPRESSURIZATION OF THE REACTOR COOLANT SYSTEM, WHICH RESULTED IN AN AUTOMATIC REACTOR TRIP AND ACTUATION OF THE HIGH PRESSURE SAFETY INJECTION SYST ...

    SBIR Phase I 1992 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government