You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY21 is not expected to be complete until September, 2022.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

  1. Emerging Outboard Engine Technology

    SBC: Advanced Engines Development Corporation            Topic: N/A

    SOCOM needs a new generation of high power density, multi-fuel, lig htweight, compact outboard engines of 30, 55, and 70 HP. Tactical use by special operations forces (SOF) requires they incorporate increased stealth capabilities, be submersible, be simple to set up and operate by one person of limited technical skills, and reliable with minimum maintenance. A weight/size reduction of 50% is des ...

    SBIR Phase I 1997 Department of DefenseSpecial Operations Command
  2. Photovoltaic Case for Electrical Equipment

    SBC: ENERGY CONVERSION DEVICES, INC.            Topic: N/A

    The objective of this project is to design, fabricate, and test a prototype photovoltaic (PV) case for electrical equipment used in field operations. The PV case could charge the equipment's batteries and/or directly operate low power equipment such as receivers and computers without a battery. The case would incorporate ECD's unique lightweight, flexible, and very rugged amorphous silicon PV modu ...

    SBIR Phase I 1994 Department of DefenseSpecial Operations Command
  3. Investigation of Molded Photovoltaic Case

    SBC: ENERGY CONVERSION DEVICES, INC.            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of DefenseSpecial Operations Command
  4. ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    MRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  5. CONTINUOUS SPECTROGRAPHIC ANALYSIS OF VANADOUS AND VANADIC IONS

    SBC: Omni Tech International Ltd            Topic: N/A

    N/A

    SBIR Phase I 1992 Nuclear Regulatory Commission
  6. A PORTABLE IMAGING SYSTEM FOR NONDESTRUCTIVE EXAMINATION OF NUCLEAR POWER PLANT COMPONENTS

    SBC: TPL, Inc            Topic: N/A

    N/A

    SBIR Phase I 1992 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government