You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Crosswind and Range Measurement Lidar for Sniper's Sights

    SBC: BRIMROSE CORPORATION OF AMERICA            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of DefenseSpecial Operations Command
  2. Low Power and Real-Time Oxygen Optrode

    SBC: Nanomaterials Research LLC            Topic: N/A

    Molecular oxygen is the most critical participant in respiratory pr ocess. Adequate oxygen supply is essential for the survivals of all living species. Fast, reliable and real-time measurement of oxygen concentration (partial pressure) is of great importance in assessing the health status of a person/soldier and the timely caring of critically ill patients. Presently available oxygen sensors suf ...

    SBIR Phase I 1997 Department of DefenseSpecial Operations Command
  3. EB Curing of VARTM Fabricated Maritime Composite Structures

    SBC: DAMILIC Corporation            Topic: N/A

    DAMILIC and others have already demonstrated that EB cured composite structures have mechanical properties comparable to those of a standard thermally cured part. The objective of this Phase I program has is to demonstrate that standard, commercially available, resin transfer molding techniques can be combined with the high speed electron beam process to produce maritime structures and higher spe ...

    SBIR Phase I 1996 Department of DefenseSpecial Operations Command
  4. ENHANCED SIMULATOR TRAINING PROGRAM FOR OPERATORS AT MULTI-UNIT PLANTS.

    SBC: Corpe Corp.            Topic: N/A

    AT MULTI-UNIT NUCLEAR GENRATING STATIONS, CONTROL ROOM OPERATORS ARE GENERALLY LICENSED TO OPERATE ALL SIMILAR UNITS. SIMULATOR TRAINING CONDUCTED AT THE LICENSEE TRAINING FACILITY OCCURS ON ONE SIMULATOR WHICH MAY NOT EXACTLY MIMIC ANY UNIT. INADEQUATE TRAINING ON UNIT-TO-UNIT AND UNIT-TO-SIMULATOR DIFFERENCES, IN CONJUNCTION WITH LIMITED PER-PERSON SIMULATOR TRAINING HOURS, CAN RESULT IN INCREAS ...

    SBIR Phase I 1994 Nuclear Regulatory Commission
  5. Photovoltaic Case for Electrical Equipment

    SBC: ENERGY CONVERSION DEVICES, INC.            Topic: N/A

    The objective of this project is to design, fabricate, and test a prototype photovoltaic (PV) case for electrical equipment used in field operations. The PV case could charge the equipment's batteries and/or directly operate low power equipment such as receivers and computers without a battery. The case would incorporate ECD's unique lightweight, flexible, and very rugged amorphous silicon PV modu ...

    SBIR Phase I 1994 Department of DefenseSpecial Operations Command
  6. Investigation of Molded Photovoltaic Case

    SBC: ENERGY CONVERSION DEVICES, INC.            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of DefenseSpecial Operations Command
  7. ROBUST, ACCURATE, NON-CONTACTING VIBRATION MEASUREMENT SYSTEM

    SBC: EPOCH ENGINEERING, INC.            Topic: N/A

    WHEN ROTATING MACHINERY DETERIORATES, VIBRTION PATTERSN CHANGE. WHEN BEARING FREQUENCIES APPEAR, THEN INCREASE IN AMPLITUDE, BEARING FAILURE LOOMS. THE SAME WITH VALVES; WHEN THEY LEAK, THEY VIBRATE. AS LEAKAGE INCREASES, THE VIBRATION PATTERN CHANGES. THERE ARE MANY OTHERS. THE KEY IS KNOWING WHERE AND HOW DEEPLY TO LOOK. THE KEY IN OLDER REACTOR PLANTS IS TO UNOBTRUSIVELY, ECONOMICALLY BACKFIT S ...

    SBIR Phase I 1994 Nuclear Regulatory Commission
  8. DEVELOPMENT OF IMPROVED TECHNIQUES FOR DYNAMIC PRA

    SBC: Frh, Inc.            Topic: N/A

    CHANGES IN PLANT STATUS, EITHER BEFORE OR DURING AN ACCIDENT SEQUENC CAN CONSIDERABLY AFFECT ITS OUTCOME; BOTH THE ACTURAL OUTCOME AND THAT PREDICTED BY PROBABILISTIC RISK ASSESSMENT. IN ORDER TO ACCURATELY REPRESENT THE POSSIBLE ACCIDENTS AND THEIR PROBABILITIES, THE PRA MODEL MUST CONSIDER THE DYNAMIC CHARACTER OF THE PLANT, IT'S SYSTEMS AND OPERATORS. A LIVING, DYNAMIC PRA IS ONE IN WHICH ALL T ...

    SBIR Phase I 1994 Nuclear Regulatory Commission
  9. A HIGH RESOLUTION CDTE ARRAY MONITORING SYSTEM FOR MONITORING CONTAMINATION IN SOILS

    SBC: Radiation Safety Engineering, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Nuclear Regulatory Commission
  10. Photovoltaic Electronics Case

    SBC: Simm Associates, Inc.            Topic: N/A

    The purpose of this proposed Phase I work is to develop a prototype Photovoltaic Electronics Case for equipment which has, molded into its structure, a photovoltaic power system capable of providing electrical power to the equipment contained within the case. The system would be able to provide at least enough power to trickle charge the battery powering the equipment, or if possible, sufficient p ...

    SBIR Phase I 1994 Department of DefenseSpecial Operations Command
US Flag An Official Website of the United States Government