You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. LOW-COST COMPOSITE MANUFACTURING PROCESS

    SBC: Adherent Technologies, Inc.            Topic: N/A

    THE ADVANTAGES OF THERMOPLASTIC MATRIX COMPOSITES FOR MANUFACTURING LOW-COST CMPONENTS HAVE YET TO BE REALIZED. AN IMPORTANT FACTOR LIMITING THERMOPLASTIC COMPOSITES IS THE LACK OF LOW-COST METHOD FOR PRODUCING HIGH-QUALITY PREPREGS AND PREFORMS. A METHOD OF PRODUCING THESE MATERIALS THAT IS COMPATIBLE WITH COMMONLY USED COMPOSITE FABRICATION TECHNIQUES SUCH AS FILAMENT WINDING, PULTRUSION, AND PR ...

    SBIR Phase II 1996 National Science Foundation
  2. SBIR Phase I: Tertiary Recycling Process for Polymer-Based Automotive Components

    SBC: Adherent Technologies, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1997 National Science Foundation
  3. SBIR Phase I: Liquid Crystalline Thermoset (LCT) Adhesives for High-Temperature Applications

    SBC: Adherent Technologies, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1997 National Science Foundation
  4. SBIR Phase I: Moisture-Resistant Composite Finishes

    SBC: Adherent Technologies, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1997 National Science Foundation
  5. SBIR Phase I: Advanced Foamed Abrasives Honing Application

    SBC: Sensintel Inc.            Topic: N/A

    N/A

    SBIR Phase I 1996 National Science Foundation
  6. SBIR Phase I: Development of Multilayer Ceramic Capacitors Through Microfabrication by Coextrusion Melt Spinning

    SBC: Sensintel Inc.            Topic: N/A

    N/A

    SBIR Phase I 1997 National Science Foundation
  7. SBIR Phase I: Advanced Foamed Abrasive Polishing Application

    SBC: Sensintel Inc.            Topic: N/A

    N/A

    SBIR Phase I 1997 National Science Foundation
  8. SBIR Phase I: Extrusion Freeforming of Superfinishing Polymer Composite Platens

    SBC: Sensintel Inc.            Topic: N/A

    N/A

    SBIR Phase I 1997 National Science Foundation
  9. LASER CRYSTALLIZATION OF SPIN-ON FERROELECTRIC THIN FILMS FOR NON-VOLATILE RANDOM ACCESS MEMORIES

    SBC: American Research Corporation of Virginia            Topic: N/A

    PRESENT MANUFACTURING TECHNOLOGIES FOR NON-VOLATILE FERROELECTRIC RANDOM ACCESS MEMORIES (FRAM) ARE NOT SUFFICIENTLY DEVELOPED TO ENSURE REPRODUCIBLE DEPOSITION OF LARGE-AREA, HIGHLY-ORIENTED POLYCRYSTALLINE PZT (LEAD-ZIRCONATE-TITANATE) THIN FILMS ON SUBSTRATES COMPATIBLE WITH SEMICONDUCTOR INTEGRATED TECHNOLOGY. PROBLEMS OF LARGE AREA STOICHIOMETRY AND COMPATIBILITY WITH THERMALLY SENSITIVE SEMI ...

    SBIR Phase II 1995 National Science Foundation
  10. PREATTENTIVE VISION BASED AUTOMATIC RECOGNITION OF SMOKE AND OBSCURANT CLOUDS

    SBC: American Research Corporation of Virginia            Topic: N/A

    FIELD TRACKING OF SMOKE AND OBSCURANT CLOUDS FROM FOREST FIRES OR VOLCANOES REQUIRES DETERMINATION OF THE TWO-DIMENSIONAL CLOUD EXTENT SHOWN IN VISIBLE IMAGES SCANNED FROM VARIOUS ANGLES ABOUT THE CLOUDS. AT THE PRESENT TIME, TWO-DIMENSIONAL CLOUD EXTENT IS DETERMINED BY AN OPERATOR WHO MANUALLY LOCATES POINTS ON THE CLOUD PERIMETER-A PROCEDURE WHICH HAS BEEN FOUND TO BE EXPENSIVE, TIME CONSUMING ...

    SBIR Phase I 1994 National Science Foundation
US Flag An Official Website of the United States Government