You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
"Rolling Deflectometer"
SBC: Applied Research Associates, Inc. Topic: N/AN/A
SBIR Phase II 1996 Department of Transportation -
Water Quality Monitoring Device
SBC: Gky And Associates, Inc. Topic: N/AThe research is to develop a sheet flow sampler to collect highway washoff and to operate in a highway roadside environment. The proposed sampler is expendable, simple, and cost effective. It will collect a predetermined depth of runoff (most commonly the first 1/2 inch of "first flush"), store it, and be removed and replaced by maintenance workers following rain events. The sampler will be its ...
SBIR Phase II 1997 Department of Transportation -
Feasibility Study of an Internet-Based GUI for Highway Capacity Software
SBC: Viggen Corp.on Topic: N/AIn this proposal, the Viggen Project Team presents an elegant approach to developing a truly portable Graphical User Interface (GUI) for the Highway Capacity Software (HCS). Our approach is based on the emerging Internet-driven computing technology and will be totally platform-independent. The prototype will be developed using a programming language called Java and users will be able to execute ...
SBIR Phase II 1997 Department of Transportation -
"Sensor Systems for Hazardous Conditions in High Speed Rail"
SBC: ENSCO Inc Topic: N/AN/A
SBIR Phase II 1996 Department of Transportation -
A PORTABLE IMAGING SYSTEM FOR NONDESTRUCTIVE EXAMINATION OF NUCLEAR POWER PLANT COMPONENTS
SBC: TPL, INC Topic: N/ATHE DIFFICULTY IN PREDICTING STRUCTURAL DEGRADATION RATES FOR NUCLEAR POWER PLANT COMPONENTS DUE TO CORROSION AND OTHER FACTORS HAS LED TO THE NEED FOR COSTLY, TIME CONSUMING INSPECTIONS AND INCREASED COST FROM INTENTIONALLY OVERDESIGNED COMPONENTS. THE SITUATION INDICATES A SERIOUS, UNMET NEED FOR A SIMPLE BUT ACCURATE SYSTEM FOR REAL- TIME, IN SITU, NONDESTRUCTIVE ANALYSIS OF NUCLEAR POWER PLANT ...
SBIR Phase II 1994 Nuclear Regulatory Commission