You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Acoustic Pressure Gradient Imager For Divers

    SBC: EMPIRICAL TECHNOLOGIES CORPORATION            Topic: N/A

    The contractor has patented technology for a unique process that directly converts a two-dimensional acoustic disturbance, such as a wave front, into an intensity-mapped visible image in real-time without electronic circuitry; that is, it is a direct pressure gradient imager. The imager relies on the piezo-dichroic properties of a continuous layer of a dichroic material thin film that serves as bo ...

    SBIR Phase I 1994 Department of DefenseSpecial Operations Command
  2. AN YTTRIUM ALUMINUM PEROVSKITE BASED GAMMA-RAY DOSIMETER

    SBC: W Peter Trower Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Nuclear Regulatory Commission
  3. A PORTABLE IMAGING SYSTEM FOR NONDESTRUCTIVE EXAMINATION OF NUCLEAR POWER PLANT COMPONENTS

    SBC: TPL, INC            Topic: N/A

    THE DIFFICULTY IN PREDICTING STRUCTURAL DEGRADATION RATES FOR NUCLEAR POWER PLANT COMPONENTS DUE TO CORROSION AND OTHER FACTORS HAS LED TO THE NEED FOR COSTLY, TIME CONSUMING INSPECTIONS AND INCREASED COST FROM INTENTIONALLY OVERDESIGNED COMPONENTS. THE SITUATION INDICATES A SERIOUS, UNMET NEED FOR A SIMPLE BUT ACCURATE SYSTEM FOR REAL- TIME, IN SITU, NONDESTRUCTIVE ANALYSIS OF NUCLEAR POWER PLANT ...

    SBIR Phase II 1994 Nuclear Regulatory Commission
  4. ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    MRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  5. Electromagnetic Pulse Mine Countermeasure Device

    SBC: Vail Research & Technology            Topic: N/A

    Naval Special Warfare is developing and testing equipment and tactics for neutralization of anti-invasion mines in the very shallow water maritime environment. The device proposed herein, an electromagnetic pulse mine countermeasure device, will enhance the capability of Naval Special Warfare to neutralize mines. The proposed device is expected to be effective against most, if not all, mine types, ...

    SBIR Phase I 1994 Department of DefenseSpecial Operations Command
  6. Rapid Acquisition Demonstrator

    SBC: GBTI Solutions, Inc.            Topic: SOCOM181004

    By the conclusion of Phase 1, important discoveries were made concerning the technological, market, and business feasibility of the Rapid Acquisition Platform. We have concluded that the RAP is feasible and may proceed to product development. In Phase II, GBTI will develop an end-to-end RAP utilizing the scientific and technological discoveries made in Phase 1. Phase 2 will be implemented over the ...

    SBIR Phase II 2019 Department of DefenseSpecial Operations Command
US Flag An Official Website of the United States Government