You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. PEN-SIZE PAPER CURRENCY READER

    SBC: APPLIED SCIENCES LABORATORY, INC.            Topic: N/A

    DIFFERENTIATING AMONG THE DENOMINATIONS OF U.S. CURRENCY IS A PROBLEM FOR THE VISUALLY HANDICAPPED. CURRENTLY AVAILABLE DEVICES THAT ASSIST THE BLIND IN DETERMINING CURRENCY DENOMINATIONS ARE RELATIVELY LARGE AND EXPENSIVE. THE PROPOSED RESEARCH AND DEVELOPMENT IS A SYSTEMATIC APPLICATION OF PATTERN RECOGNITION AND MICRO-ELECTRONICS TECHNOLOGY TO DEVELOP A PEN-SIZE PAPER CURRENCY READER. RECENT AD ...

    SBIR Phase II 1994 Department of Education
  2. Interactive Multimedia to Teach Reading to Adult Learners

    SBC: American Research Corporation of Virginia            Topic: N/A

    N/A

    SBIR Phase II 1996 Department of Education
  3. A Beginning Sign Language VideoCourse for Hearing Adult Learners

    SBC: The Masters Group            Topic: N/A

    This Phase I project will consist of a fesibility study in preparation for Phase II project in which a complete 20-hour sign language videocourse will be produced reflecting the entry level skills, learning styles, learning preferences, and sign-processing strategies of hearing adult beginning learners. The primary hearing populations for this instruction are (a) current and prospective teachers ...

    SBIR Phase II 1997 Department of Education
  4. New Braille Technology (NBT)

    SBC: Automated Functions, Inc.            Topic: N/A

    N/A

    SBIR Phase II 1996 Department of Education
  5. Intelligent Graphic Access Manager

    SBC: Automated Functions, Inc.            Topic: N/A

    N/A

    SBIR Phase II 1996 Department of Education
  6. SCREEN ACCESS MANAGER FOR THE IBM PC (SAM)

    SBC: Automated Functions, Inc.            Topic: N/A

    THE PURPOSE OF THIS RESEARCH PROJECT WILL BE TO TEST THE FEASIBILITY OF DEVELOPING A SCREEN ACCESS MANGER (SAM) UTILITY TO ASSIST VISUALLY IMPAIRED INDIVIDUALS IN ACCESSINGDIFFICULT TO USE OFF-THE-SHELF SOFTWARE FOR THE IBM PC, IBM AT, AND COMPATIBLES. THE PROJECT WILL FOCUS ON DETERMINING A METHODOLOGY (LOGIC) FOR AUTOMATICALLY LOCATING THE DIFFERENT NEARLY RANDOM VISUAL SCREEN FORMATS PRESENTED ...

    SBIR Phase II 1988 Department of Education
  7. A PORTABLE IMAGING SYSTEM FOR NONDESTRUCTIVE EXAMINATION OF NUCLEAR POWER PLANT COMPONENTS

    SBC: TPL, INC            Topic: N/A

    THE DIFFICULTY IN PREDICTING STRUCTURAL DEGRADATION RATES FOR NUCLEAR POWER PLANT COMPONENTS DUE TO CORROSION AND OTHER FACTORS HAS LED TO THE NEED FOR COSTLY, TIME CONSUMING INSPECTIONS AND INCREASED COST FROM INTENTIONALLY OVERDESIGNED COMPONENTS. THE SITUATION INDICATES A SERIOUS, UNMET NEED FOR A SIMPLE BUT ACCURATE SYSTEM FOR REAL- TIME, IN SITU, NONDESTRUCTIVE ANALYSIS OF NUCLEAR POWER PLANT ...

    SBIR Phase II 1994 Nuclear Regulatory Commission
  8. SPECIAL MONITOR DETECTOR DEVELOPMENT FOR RESPIRATOR CONTAMINATION

    SBC: Shonka Research Associates            Topic: N/A

    IMPLEMENTATION OF AN INTEGRATED DETECTION SYSTEM FOR CONTAMINATION MONITORING OF RESPIRATORS HAS BEEN PROBLEMATIC. BECAUSE OF THE COMPLEX SURFACES, HAND MONITORING USING PORTABLE SURVEY INSTRUMENTATION HAS BEEN THE PREFERRED METHOD. HAND MONITORING IS COSTLY IN TIME AND OFTEN FAILS TO RELIABLY ACHIEVE A GIVEN DETECTION LIMIT BECAUSE OF VARIABLES SUCH AS SURVEY SPEED ANDDISTANCE FROM THE PROBE. THE ...

    SBIR Phase II 1994 Nuclear Regulatory Commission
  9. A Detection System for Determining the Concentration, Size, and Depth of Buried Radioactive Material

    SBC: Shonka Research Associates            Topic: N/A

    N/A

    SBIR Phase II 1996 Nuclear Regulatory Commission
  10. DEVELOPMLENT OF A LAUNDRY MONITOR FOR DETECTION OF HOT PARTICLE CONTAMINATION

    SBC: Shonka Research Associates            Topic: N/A

    TWO APPROACHES WILL BE EXAMINED TO SIGNIFICANTLY IMPROVE THESENSITIVITY OF LAUNDRY MONITORS TO DETECT AND SPECIFY LOCATION OF HOT PARTICLES ON LAUNDERED GARMENTS. THESE PROPOSED TECNIQUES HAVE HIGH POTENTIAL FOR DETECTING BOTH LOW ENERGY BETA AND ALPHA PARTICLE RADIATION AS WELL AS IMPROVING SENSITIVITY BY REDUCING BACKGROUND COUNT RATE.

    SBIR Phase II 1990 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government