You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A Computational Model of Human Perception- Application to Target Detection

    SBC: M-VISION INC            Topic: N/A

    M-Vision Inc., along with the University of Michigan and Michigan State University, proposes to develop a new and novel solution to the problem of target detection and discrimination in a complex scene. This solution is obtained by innovatively combining Gabor wavelets and scale space inference. The result is a computational model of human perception that resembles the human visual system in its ...

    SBIR Phase I 1997 Department of DefenseArmy
  2. Acoustic Sensor Simulation and Environment Technology

    SBC: TECHNICAL SOLUTIONS, INC.            Topic: N/A

    A quality simulation which allows a user to simulate the acoustic emissions in a multi-source environment and then study the effects these conditions have on a set of acoustic sensors would be of great value. As acoustic sensors technology continues to advance with robust algorithms for detection, tracking and identification as well as high performance hardware providing real-time operation, thes ...

    SBIR Phase I 1996 Department of DefenseArmy
  3. Advanced Armor Vehicle Design

    SBC: Physics Mathematics &            Topic: N/A

    This project applies a combination of Artificial Neural Networks (ANN), Genetic Algorithms (GA), and CAD software to the problem of optimum armor design. Previous work for TACOM has established the efficacy of ANN/GA as applied to the problem of 1-D armor design. This new work will extend the concept to full 3-D vehicle geometries (CAD models). The CAD part of the code will handle the 3D data d ...

    SBIR Phase I 1997 Department of DefenseArmy
  4. Advancement in Distributed Interactive Simulation (DIS) Technology--Information Simulation for C(3)I Systems

    SBC: OPTIMETRICS, INC.            Topic: N/A

    Here OptiMetrics Inc. proposes to develop an Information Architecture for the simulation of intelligence information, processes and sensors that are the components of C3I systems. That Information Architecture (IA) builds on the concepts of High Level Architecture (HLA) for DIS. It would provide the logical structure for the integration of existing and future intelligence simulations and for eva ...

    SBIR Phase I 1997 Department of DefenseArmy
  5. A MEMS Tactile Man-Machine Interface Device for Telemedicine

    SBC: CYBERNET SYSTEMS CORPORATION            Topic: N/A

    We propose the application of HEMS technology to the development of a tactile finger tip display device for operation in conjunction with finger force reflective devices. By co~ining high bandwidth finger tip acutation with lower bandwidth, large motion finger force reflection, we hope to gain full range-of-motion dexterity with the impression of sensitive surface touch. For medical diagnostic ...

    SBIR Phase I 1997 Department of DefenseArmy
  6. An Advanced Integrated Electric Wheel Motor and Hydraulic Suspension System for High-Mobility Scout Ground Vehicle

    SBC: NEW GENERATION MOTORS CORP.            Topic: N/A

    Military scout vehicles and commercial sports utility vehicles share the common need for advanced suspension/drive systems that offer robustness over widely varying terrain. The ultimate system for handling, ride isolation, and stability control would incorporate high efficiency electric motors independently driving the four wheels, with one on-board high-level computer for controlling the active ...

    SBIR Phase I 1997 Department of DefenseArmy
  7. A Novel Non-Lethal Effects Device

    SBC: Adroit Systems, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of DefenseArmy
  8. AN YTTRIUM ALUMINUM PEROVSKITE BASED GAMMA-RAY DOSIMETER

    SBC: W Peter Trower Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Nuclear Regulatory Commission
  9. Appurtance Attachments for Composite Systems

    SBC: Witten Company, Inc.            Topic: N/A

    This exploratory development program is a study of existing means of attaching hardware to composite materials in general. Special attention for mounting racks, brackets, modular armor and other types of equipment and hardware on combat and tactical vehicle will be provided. These vehicles use all types and shapes of composite structure including: solid laminates, thin wall composites, pultrusion, ...

    SBIR Phase I 1994 Department of DefenseArmy
  10. A RSTA Algorithmic Framework with Uncertainty Management

    SBC: Cyber Solutions, Inc.            Topic: N/A

    One of the most challenging information management problems related to the Reconnaissance, Surveillance and Target Acquisition (RSTA) missions is the real-time spatio-temporal fusion of target-specific cues from a netwotk of multiple sensor platforms. A robust algorithmic framework is necessary to involve the multiple agents together and achieve the optimal trade-off between low false alarm rate ...

    SBIR Phase I 1997 Department of DefenseArmy
US Flag An Official Website of the United States Government