You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY21 is not expected to be complete until September, 2022.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

  1. Reuse Support Tools for Automated Constructino of Software Systems

    SBC: Advanced Systems Technology, Inc.            Topic: N/A

    Reuse in software engineering is an exciting concept that has yet to be reliably implemented. The number of program subroutines that are truly generic (and therefore applicable across all applications) is limited. However, there are specific applications that are required by many organizations, albeit with a set of constraints specific to each organization. This project proposes to design a too ...

    SBIR Phase I 1995 Department of Commerce
  2. Electromagnetic Resonance Sensors for Determination of Moisture Content in Concrete

    SBC: American Research Corporation of Virginia            Topic: N/A

    The overall quality and the comprehensive strength, in particular, of concrete are critically dependent on the water content in the concrete mixture. It is also essential to know if the concrete has reached a stage of moisture equilibrium before surface finishes such as paint or carpet can be applied. At present, no reliable method or easy-to-use instrument exists for determining the moisture co ...

    SBIR Phase I 1995 Department of Commerce
  3. Process-Based Assurance Product Suite

    SBC: Arca Systems, Inc.            Topic: N/A

    Arca proposes research leading to development of a suite of methodology support products to help meet the need for innovative assurance techniques appropriate for emerging information technologies. The product will consist of a licensable methodology and supporting materials for specifying, building, and evaluating assurance arguments for products and systems based on the capability of security en ...

    SBIR Phase I 1997 Department of Commerce
  4. Airborne Imaging LIDAR for Biomass Estimation

    SBC: Arete Associates            Topic: N/A

    There is a need for accurate and cost effective airborne techniques to estimate fish biomass in the open ocean. Arete proposes to develop in Phase I optimal detection algorithms using existing imaging LIDAR data collected with the Fisheye(R) sensor. These algorithms will be developed to allow real-time detection of fish and fish schools, discrimination between fish and ambient clutter, and discr ...

    SBIR Phase I 1995 Department of Commerce
  5. A 3-D Machine Tool Error Modeling System

    SBC: Automated Precision Inc.            Topic: N/A

    In response to the increasing demand for better understanding of the manufacturing processes and the machining systems, a new testing standard--ASME B5.54 and a family of new testing instruments have been developed for evaluating the performances of a variety of CNC machining centers. Because of the advancement and versatility of the new instruments, test data are being collected at a much higher ...

    SBIR Phase I 1997 Department of Commerce
  6. CAD of Non-linear Optical Properties of Thin-film Structures

    SBC: Autometric Inc.            Topic: N/A

    This proposal addresses development of CAD software for simulating non-linear optical materials. The software will provide a virtual lab in which experimental setups are simulated. The proposed software is based on the use of a Maxwell differential equation solver, the Finite Difference Time Domain (FDTD) method. This numerical method has been developed by numerous researchers since 1968 and no ...

    SBIR Phase I 1995 Department of Commerce
  7. Algorithms for Health Care Quality Management and Outcomes Assessment

    SBC: BARRON ASSOCIATES, INC.            Topic: N/A

    American health care is in the midst of momentous change. Quality improvement principles are being used increasingly to enhance productivity and efficiency of health care delivery and to help contain costs. In producing patient outcomes and resource utilization measures, it is vital to control appropriately for case mix (i.e., differences in patients due, e.g., to illness severity) in the predicti ...

    SBIR Phase I 1997 Department of Commerce
  8. A Ruggedized System for Measuring Extreme Winds

    SBC: Caregiver Technologies, Inc.            Topic: N/A

    We will develop technology, termed a Ruggedized Wind Measurement System (RWMS), to measure directly extreme winds with high space and time resolution, focusing on the winds that occur beneath hurricanes at land fall. This development effort will include design, fabrication of two prototype RWMS units, and a series of proof-of-concept demonstrations in strong mountain-induced downslope and severe t ...

    SBIR Phase I 1997 Department of Commerce
  9. ASSESSING AND INCREASING THE TESTABILITY OF OBJECT-ORIENTED SOFTWARE

    SBC: Cigital, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of Commerce
  10. RESISITVE HEAT CURED RESIN TRANSFER MOLDING OF ADVANCED COMPOSITES

    SBC: Conductive Composites Tech,inc            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of Commerce
US Flag An Official Website of the United States Government