You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
US FLAG COASTAL RO/RO SHIPS; APPLICATION OF CASSETTE TECHNOLOGY
SBC: Advanced Marine Enterprises, Topic: N/ATHIS STUDY WILL EVALUATE THE RANGE OF SHIP SIZES AND POWER LEVELS (SPEEDS) TO DETERMINE THE OPTIMUM SHIP CHARACTERISTICS FOR OPERATING U.S. FLAG RO/RO SHIPS IN U.S. COASTAL SERVICE. RO/RO CARGO HANDLING TECHNIQUES PREVALENT IN EUROPE AND SCANDINAVIA WILL BE INCORPORATED AS A FUNDAMENTAL ELEMENT OF THE SERIES OF SHIPS INVESTIGATED. THESE TECHNIQUES INVOLVE THE USE OF CASSETTES TO HANDLE CONTAINERS ...
SBIR Phase I 1994 Department of Transportation -
WEIGHING TRUCK COMBINATIONS IN MOTION, SOLELY ON THE TRACTOR
SBC: Airsport Corp. Topic: N/AN/A
SBIR Phase I 1994 Department of Transportation -
"Rolling Deflectometer"
SBC: Applied Research Associates, Inc. Topic: N/AN/A
SBIR Phase I 1995 Department of Transportation -
DEVELOPMENT OF ANGULAR ACCELEROMETER
SBC: A-TECH CORPORATION Topic: N/AN/A
SBIR Phase I 1986 Department of Transportation -
COMMERCIAL SPACE LAUNCH FREQUENCY REQUIRMENTS
SBC: Berner, Lanphier & Assoc Inc. Topic: N/AN/A
SBIR Phase I 1994 Department of Transportation -
Highway Capacity Software in Portable Graphical User Interface (GUI) Format
SBC: Catalina Engineering, Inc. Topic: N/AThe Highway Capacity Software (HCS) has, for the past 10 years, been the principal tool for applying the analysis methods of the Highway Capacity Manual (HCM). The HCS has been DOS-based with a very limited user interface. With a number of new research materials being produced, and an approved plan in place which leads to publication of an HCM 2000 and accompanying software, there is a strong op ...
SBIR Phase I 1996 Department of Transportation -
"Transportation Planning Using GIS"
SBC: Century Technologies Topic: N/AN/A
SBIR Phase I 1995 Department of Transportation -
Self-Monitoring Surveillance System for Prestressing Tendons
SBC: Construction Technology Topic: N/AN/A
SBIR Phase I 1995 Nuclear Regulatory Commission -
ENHANCED SIMULATOR TRAINING PROGRAM FOR OPERATORS AT MULTI-UNIT PLANTS.
SBC: Corpe Corp. Topic: N/AAT MULTI-UNIT NUCLEAR GENRATING STATIONS, CONTROL ROOM OPERATORS ARE GENERALLY LICENSED TO OPERATE ALL SIMILAR UNITS. SIMULATOR TRAINING CONDUCTED AT THE LICENSEE TRAINING FACILITY OCCURS ON ONE SIMULATOR WHICH MAY NOT EXACTLY MIMIC ANY UNIT. INADEQUATE TRAINING ON UNIT-TO-UNIT AND UNIT-TO-SIMULATOR DIFFERENCES, IN CONJUNCTION WITH LIMITED PER-PERSON SIMULATOR TRAINING HOURS, CAN RESULT IN INCREAS ...
SBIR Phase I 1994 Nuclear Regulatory Commission -
TRANSIT SYSTEM COMPUTER SIMULATION MODELS
SBC: Decision Dynamics, Inc. Topic: N/ATHIS PROPOSAL DESCRIBES A MICRO-LEVEL STRATEGIC TRANSIT SIMULATION MODEL THAT QUANTIFIES THE DIFFICULT TRADEOFFS BETWEEN COST, PERFORMANCE AND TIME. THE MODEL UTILIZES SYSTEM DYNAMICS TO CAPTURE THE COMPLEX, NON-LINEAR FEEDBACK STRUCTURE THAT GOVERNS SYSTEM BEHAVIOR, INCORPORATING SUCH TRANSIT OPERATIONS AS VEHICLE MANAGEMENT, SERVICE LEVELS, FARES, RIDERSHIP, MARKETING, REVENUES, CONGESTION, POLL ...
SBIR Phase I 1994 Department of Transportation