You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Abductive Power System Control and Diagnostics

    SBC: ABTECH CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1994 National Aeronautics and Space Administration
  2. A COATED TIB2 WHISKER TOUGHENED SIC MATRIX COMPOSITE FOR AEROSPACE PROPULSION

    SBC: ATS-MER, LLC            Topic: N/A

    SILICON CARBIDE IS A VERY DESIRABLE STRUCTURAL CERAMIC BUT STATE-OF-THE-ART MONOLITHS ARE LACKING IN TOUGHNESS AND RELIABILITY. WHISKER TOUGHENING HAS NOT BEEN EFFECTIVE DUE TO THE DISAPPEARANCE OF THE SICW IN THE VERY HIGH TEMPERATURE CONSOLIDATION PROCESS. TIB2 PARTICLES HAVE BEENDEMONSTRATED STABLE IN THE SIC CONSOLIDATION PROCESS, BUT DO NOT HAVE A MAJOR IMPACT ON INCREASING TOUGHNESS AND LACK ...

    SBIR Phase I 1990 National Aeronautics and Space Administration
  3. A Configurable Object-Oriented Expert System to Embody Cultural (Awareness) Models for Simulation and Semi-Autonomous Forces

    SBC: AURORA SIMULATION, INC.            Topic: N/A

    One of the biggest problems faced by both military and non-military personnel in planning and conducting Operations Other Than War (OOTW) and Law Enforcement (LE) is a lack of cultural awareness. A lack of cultural awareness in OOTW causes misplanning and misinterpretation in the areas of economics, politics, religion, and historical events. The objective of the proposed work is to produce a des ...

    SBIR Phase I 1996 Department of DefenseDefense Advanced Research Projects Agency
  4. Active Rain-Radar Calibrator for Tropical Rainfall Measuring Mission

    SBC: CENTER FOR REMOTE SENSING, INC.            Topic: N/A

    We propose to design a state-of-the-art active radar calibrator which will be used for absolute calibration of the TRMM Rain Radar. During Phase I, we investigate several architectures and perform design evaluations with the ultimate objective of designing an improved radar calibrator with unprecedented accuracy and stability, yet optimized for cost and complexity. The active calibrator will be op ...

    SBIR Phase I 1994 National Aeronautics and Space Administration
  5. ACTIVE STABILITY CONTROL OF TURBINE ENGINE COMBUSTER AND COMPRESSOR

    SBC: Scientific Monitoring, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1996 National Aeronautics and Space Administration
  6. Active Suppression of Resonance Interactions between Shear-Layers and Cavities

    SBC: High Technology Corporation            Topic: N/A

    N/A

    SBIR Phase I 1994 National Aeronautics and Space Administration
  7. ACTIVE VIBRATION STABILIZATION BY SMART LEAD-FREE PIEZO CERAMIC/POLYMER HYBRID MATERIALS

    SBC: ATS-MER, LLC            Topic: N/A

    N/A

    SBIR Phase I 1996 National Aeronautics and Space Administration
  8. ADAPTIVE CONTROL AND HIERARCHICAL SYSTEMS FOR A COMPLES MANUFACTURING ENVIRONMENT

    SBC: Semimac Inc            Topic: N/A

    THIS PROPOSAL ADDRESSES THE TECHNICAL CHALLENGE TO U.S. INDUSTRY FOR DEVELOPMENT OF CONTROL SYSTEMS THAT ARE ADAPTABLE TO CHANGES IN THE COMPLEX MULTIPLE, CONCURRENT PROCESSES OF A SEMICONDUCTOR MANUFACTURING ENVIRONMENT. THE PROPOSED WORK IS EXPLORATORY RESEARCH WHICH WILL RESULT IN THE DEVELOPMENT OF AN ABSTRACT SETTING FOR THE CONTROL SYSTEMS, INVOLVING A THREE TIER HIERARCHICAL APPROACH, WITH ...

    SBIR Phase I 1990 Department of DefenseDefense Advanced Research Projects Agency
  9. Adaptive Network Security Management

    SBC: INTEGRATED MANAGEMENT SERVICES, INC.            Topic: N/A

    This project is dedicated to the development of an adaptive network security management tool that is analogous to implementing and incident/response paring mechanism on top of a universal remote control facility for a variety of network and security tools, network types and operating systems. Our proposed approach to accomplishing this is to integrate and agent architecture with a Case-Based Reas ...

    SBIR Phase I 1997 Department of DefenseDefense Advanced Research Projects Agency
  10. Adaptive Network Security Management

    SBC: MOUNTAIN WAVE, INC.            Topic: N/A

    Mountain Wave, Inc. proposes to investigate the development of an automated network security management product that would allow personnel within an Information Technology (IT) organization to combine information from heterogeneous sources into an integrated application that captures business processes and automates tasks to "prevent" potential security violations. This product will: be "extensib ...

    SBIR Phase I 1997 Department of DefenseDefense Advanced Research Projects Agency
US Flag An Official Website of the United States Government