You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY20 is not expected to be complete until September, 2021.

  1. "Composable Information Flow to Support Plug-and-Play Integration of Operational Simulations with Functional and Behavioral Simulations

    SBC: AURORA SIMULATION, INC.            Topic: N/A

    As simulation becomes a tool at all levels of acquisition and development, there is a great need to be able to integrate multiple forms of simulation together for more comprehensive and thorough simulations. The two predominate forms of military simulation are operational simulation and functional behavioral simulation. Although they are used for different purposes, there is a need to integrate ...

    SBIR Phase I 1996 Department of DefenseNavy
  2. A Hybrid Analysis of Task and Team Performance in the CIC

    SBC: COGNITIVE TECHNOLOGIES, INC.            Topic: N/A

    CTI and its subcontractors, BDM's Defense Enterprise Integration Team and Sonalysts, Inc., propose to apply a hybrid task analysis methodology to model critical functions in the CIC and derive measures of performance by individuals and teams. The approach is a hybrid in that it joins cognitive analysis techniques with methods typically used to in business re-engineering studies. In addition, it in ...

    SBIR Phase I 1997 Department of DefenseNavy
  3. A knowledge Assessment Tool for Complex Cognitive Skills

    SBC: Research Development Corporation            Topic: N/A

    Today's workforce requires higher skill levels than ever before. This necessitates effective training technologies. A key component of the training process is assessing trainee performance and critical learning needs. Traditional assessment tools have been criticized as measuring test taking skills more than problem solving skills. A number of approaches have been developed to address this wea ...

    SBIR Phase I 1997 Department of DefenseNavy
  4. A Mission Planning Trainer Module for IUSS Deployable Systems

    SBC: PLANNING SYSTEMS, INC.            Topic: N/A

    The problem is defined as finding a method to leverage application software into computer-based training (CBT) about mission planning, especially when using Deployable IUSS systems. The Phase I research is based on the use of IconAuthor authoring software for IUSS CBT; and the use of X-Windows as the GUI for major IUSS applications. The objective is to verify that an application can be crea ...

    SBIR Phase I 1997 Department of DefenseNavy
  5. A Polar Nephelometer Beta-C Meter to support underwater optical

    SBC: Global Assoc., Ltd.            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of DefenseNavy
  6. Acoustic Towed Array Position Measurement System for Nuclear Submarines

    SBC: DDL Omni Engineering, LLC            Topic: N/A

    DDL OMNI Engineering proposes to design a secure system for the continuous, real time acoustic measurement of towed array position relative to the host submarine. By using focused transmit and receive assemblies, pseudo- random spread broadband signals, and relatively high carrier frequency, the transmission level will be minimized so as to be virtually undetectable by a non-dedicated system ...

    SBIR Phase I 1997 Department of DefenseNavy
  7. Acousto-Ultrasonic Method for the Detection of Adhesive Bond Integrity

    SBC: Materials Modifications Inc.            Topic: N/A

    Composite materials find increasing importance as structural materials for modern lightweight and low cost aircraft. Structures using composite materials essentially rely on the integrity of adhesive bonds for their structural stability. A major limitation in employing composites in critical structures is that the existing methods of testing the integrity of structures are not adequate to a ...

    SBIR Phase I 1996 Department of DefenseNavy
  8. ACTIVE NOISE CONTROL

    SBC: SVS R&D SYSTEMS, INC.            Topic: N/A

    THE PROBLEMS OF ATTENUATING DUCTED NOISE AND DISTRIBUTED NOISE ARE ADDRESSED USING ACTIVE NOISE CANCELLATION TECHNIQUES. FOR DUCTED NOISE, A COMBINATION OF COMMERCIAL ANC EQUIPMENT WITH LOW PRESSURE DROP MUFFLERS IN AN SVS PROPRIETARY CONFIGURATION WILL BE EXAMINED. COST AND PERFORMANCE TRADES BETWEEN THE ACTIVE CONFIGURATION AND PASSIVE MUFFLERS WILL BE MADE AND AN EXPERIMENT WILL BE DESIGNED FOR ...

    SBIR Phase I 1994 Department of DefenseNavy
  9. ACTIVE SURVEILLANCE SYSTEM SIGNAL PROCESSING FOR DENSE MULTIPATH NEAR LAND WARFARE

    SBC: DIGITAL SYSTEM RESOURCES, INC.            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of DefenseNavy
  10. Adaptive Beamforming for Littoral Waters

    SBC: DIGITAL SYSTEM RESOURCES, INC.            Topic: N/A

    This project proposes preliminary investigations to prove the feasibility of four techniques for improving Adaptive Beamforming performance in littoral environments. Emphasis is placed on tradeoffs between algorithm efficiency and performance. The littoral acoustic environment is characterized by near and far field targets and dense dynamic near and far field directional interference at man ...

    SBIR Phase I 1996 Department of DefenseNavy
US Flag An Official Website of the United States Government