You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Abductive Power System Control and Diagnostics
SBC: ABTECH CORPORATION Topic: N/AN/A
SBIR Phase I 1994 National Aeronautics and Space Administration -
Active Rain-Radar Calibrator for Tropical Rainfall Measuring Mission
SBC: CENTER FOR REMOTE SENSING, INC. Topic: N/AWe propose to design a state-of-the-art active radar calibrator which will be used for absolute calibration of the TRMM Rain Radar. During Phase I, we investigate several architectures and perform design evaluations with the ultimate objective of designing an improved radar calibrator with unprecedented accuracy and stability, yet optimized for cost and complexity. The active calibrator will be op ...
SBIR Phase I 1994 National Aeronautics and Space Administration -
ACTIVE STABILITY CONTROL OF TURBINE ENGINE COMBUSTER AND COMPRESSOR
SBC: Scientific Monitoring, Inc. Topic: N/AN/A
SBIR Phase I 1996 National Aeronautics and Space Administration -
Active Suppression of Resonance Interactions between Shear-Layers and Cavities
SBC: High Technology Corporation Topic: N/AN/A
SBIR Phase I 1994 National Aeronautics and Space Administration -
ACTIVE VIBRATION STABILIZATION BY SMART LEAD-FREE PIEZO CERAMIC/POLYMER HYBRID MATERIALS
SBC: ATS-MER, LLC Topic: N/AN/A
SBIR Phase I 1996 National Aeronautics and Space Administration -
Advanced High-Lift Systems To Enhance Performance And Utility Of Existing And New Ga Aircraft
SBC: Innovative Aerodynamic Topic: N/AN/A
SBIR Phase I 1997 National Aeronautics and Space Administration -
ADVANCED MOLYBDATE CONVERSION COATINGS FOR ALUMINUM AND ITS ALLOYS
SBC: LYNNTECH INC. Topic: N/AN/A
SBIR Phase I 1996 National Aeronautics and Space Administration -
A Flight Rated Time Of Flight Mass Spectrometer With 10(-15) Torr Sensitivity For Insitu Thin Film Process Control
SBC: IONWERKS INC Topic: N/AN/A
SBIR Phase I 1997 National Aeronautics and Space Administration -
A High Efficiency Reactor For Biological Waste Water Processing
SBC: LYNNTECH INC. Topic: N/AN/A
SBIR Phase I 1997 National Aeronautics and Space Administration -
A HIGH RESOLUTION CDTE ARRAY MONITORING SYSTEM FOR MONITORING CONTAMINATION IN SOILS
SBC: Radiation Safety Engineering, Inc. Topic: N/AN/A
SBIR Phase I 1994 Nuclear Regulatory Commission