You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
ENHANCED SIMULATOR TRAINING PROGRAM FOR OPERATORS AT MULTI-UNIT PLANTS.
SBC: Corpe Corp. Topic: N/AAT MULTI-UNIT NUCLEAR GENRATING STATIONS, CONTROL ROOM OPERATORS ARE GENERALLY LICENSED TO OPERATE ALL SIMILAR UNITS. SIMULATOR TRAINING CONDUCTED AT THE LICENSEE TRAINING FACILITY OCCURS ON ONE SIMULATOR WHICH MAY NOT EXACTLY MIMIC ANY UNIT. INADEQUATE TRAINING ON UNIT-TO-UNIT AND UNIT-TO-SIMULATOR DIFFERENCES, IN CONJUNCTION WITH LIMITED PER-PERSON SIMULATOR TRAINING HOURS, CAN RESULT IN INCREAS ...
SBIR Phase I 1994 Nuclear Regulatory Commission -
HIGH SENSITIVITY URANIUM BIOASSAY
SBC: Eastern Analytical Inc. Topic: N/ADETERMINATION OF URANIUM IN THE URINE OF WORKERS IS REQUIRED BY THE NRC AT NUCLEAR FACILITIES. EXTREMELY LOW CONCENTRATIONS OF URANIUM, ESPECIALLY IN SMALL SAMPLES, ARE DIFFICULT TO MEASURE USING EXISTING TECHNOLOGY. FUTURE NRC PLANS TO CHARACTERIZE BIOAVAILABLE URANIUM FRACTIONS COMPRISING THE URANIUM BODY BURDEN WILL REQUIRE EVEN HIGHER SENSITIVITIES. HIGH SENSITIVITY TECHNOLOGY DEVELOPED FOR UR ...
SBIR Phase I 1992 Nuclear Regulatory Commission -
ROBUST, ACCURATE, NON-CONTACTING VIBRATION MEASUREMENT SYSTEM
SBC: EPOCH ENGINEERING, INC. Topic: N/AWHEN ROTATING MACHINERY DETERIORATES, VIBRTION PATTERSN CHANGE. WHEN BEARING FREQUENCIES APPEAR, THEN INCREASE IN AMPLITUDE, BEARING FAILURE LOOMS. THE SAME WITH VALVES; WHEN THEY LEAK, THEY VIBRATE. AS LEAKAGE INCREASES, THE VIBRATION PATTERN CHANGES. THERE ARE MANY OTHERS. THE KEY IS KNOWING WHERE AND HOW DEEPLY TO LOOK. THE KEY IN OLDER REACTOR PLANTS IS TO UNOBTRUSIVELY, ECONOMICALLY BACKFIT S ...
SBIR Phase I 1994 Nuclear Regulatory Commission -
DEVELOPMENT OF IMPROVED TECHNIQUES FOR DYNAMIC PRA
SBC: Frh, Inc. Topic: N/ACHANGES IN PLANT STATUS, EITHER BEFORE OR DURING AN ACCIDENT SEQUENC CAN CONSIDERABLY AFFECT ITS OUTCOME; BOTH THE ACTURAL OUTCOME AND THAT PREDICTED BY PROBABILISTIC RISK ASSESSMENT. IN ORDER TO ACCURATELY REPRESENT THE POSSIBLE ACCIDENTS AND THEIR PROBABILITIES, THE PRA MODEL MUST CONSIDER THE DYNAMIC CHARACTER OF THE PLANT, IT'S SYSTEMS AND OPERATORS. A LIVING, DYNAMIC PRA IS ONE IN WHICH ALL T ...
SBIR Phase I 1994 Nuclear Regulatory Commission -
A PORTABLE IMAGING SYSTEM FOR NONDESTRUCTIVE EXAMINATION OF NUCLEAR POWER PLANT COMPONENTS
SBC: TPL, INC Topic: N/AN/A
SBIR Phase I 1992 Nuclear Regulatory Commission -
CONTROL VALVE CAVITATION GUIDE
SBC: Tullis Engineering Consultants Topic: N/AONE OF THE IMPORTANT UNRESOLVED OPERATIONAL PROBLEMS AT NUCLEAR POWER PLANTS IS CAVITATION IN CONTROL VALVES. EACH YEAR COSTLY SHUTDOWNS ARE NECESSARY TO REPAIR VALVES DAMAGED BY CAVITATION. THE PROBLEM IS MORE THAN JUST AN ECONOMICAL BURDEN ON THE UTILITY, IT CAN CREATE SAFETY-RELATED PROBLEMS BECAUSE A VALVE DAMAGED BY CAVITATION MAY NOT BE ABLE TO PERFORM ITS INTENDED FUNCTION. THE PRIMARY REAS ...
SBIR Phase I 1992 Nuclear Regulatory Commission -
AN YTTRIUM ALUMINUM PEROVSKITE BASED GAMMA-RAY DOSIMETER
SBC: W Peter Trower Inc. Topic: N/AN/A
SBIR Phase I 1994 Nuclear Regulatory Commission