You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A Diode Laser Multigas Analyzer for Advanced Detection of Fires

    SBC: SOUTHWEST SCIENCES INC            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Commerce
  2. Algorithms for Health Care Quality Management and Outcomes Assessment

    SBC: BARRON ASSOCIATES, INC.            Topic: N/A

    American health care is in the midst of momentous change. Quality improvement principles are being used increasingly to enhance productivity and efficiency of health care delivery and to help contain costs. In producing patient outcomes and resource utilization measures, it is vital to control appropriately for case mix (i.e., differences in patients due, e.g., to illness severity) in the predicti ...

    SBIR Phase I 1997 Department of Commerce
  3. Analysis Software for Near-Field Optical Microscopes

    SBC: Field Precision            Topic: N/A

    The near-field scanning optical microscope can supply information on the shape and electrical properties of surfaces with nanometer resolution. The quantitative interpretation of images is difficult because of the difficulty of electromagnetic field solutions in the near-field limit. We propose to supply software to aid in this analysis. The finite-element programs generate two and three-dimension ...

    SBIR Phase I 1997 Department of Commerce
  4. AN ASSESSMENT AND TEACHING TOOL FOR NATIONAL EDUCATION GOALS

    SBC: Research Development Corporation            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of Commerce
  5. AN YTTRIUM ALUMINUM PEROVSKITE BASED GAMMA-RAY DOSIMETER

    SBC: W Peter Trower Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Nuclear Regulatory Commission
  6. A Ruggedized System for Measuring Extreme Winds

    SBC: Caregiver Technologies, Inc.            Topic: N/A

    We will develop technology, termed a Ruggedized Wind Measurement System (RWMS), to measure directly extreme winds with high space and time resolution, focusing on the winds that occur beneath hurricanes at land fall. This development effort will include design, fabrication of two prototype RWMS units, and a series of proof-of-concept demonstrations in strong mountain-induced downslope and severe t ...

    SBIR Phase I 1997 Department of Commerce
  7. ASSESSING AND INCREASING THE TESTABILITY OF OBJECT-ORIENTED SOFTWARE

    SBC: Cigital, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of Commerce
  8. Characterization of Consolidation of Non-Spherical Powders

    SBC: MATSYS INCORPORATED            Topic: N/A

    We propose to characterize the early stage of consolidation of non-spherical powders to further the development of process models to enable simulation of powder metallurgy manufacturing for the consumer market, especially the automotive industry. Typically, spherical powders with a narrow size distribution are used for aerospace applications, while low-cost powders with irregular shapes and a wide ...

    SBIR Phase I 1997 Department of Commerce
  9. COMMON CAUSE FAILURE ANALYSIS (CCFA) IS AN IMPORTANT ELEMENTOF A COMPLETE PROBABILISTIC RISK ASSESSMENT (PRA) SINCE COMMON CAUSE FAILURE IS OFTEN A DOMINANT FACTOR IN THE RISK POSED TO PUBLIC HEALTH AND SAFETY FROM NUCLEAR POWER PLANT ACCIDENTS.

    SBC: Jfb Associates Inc.            Topic: N/A

    COMMON CAUSE FAILURE ANALYSIS (CCFA) IS AN IMPORTANT ELEMENTOF A COMPLETE PROBABILISTIC RISK ASSESSMENT (PRA) SINCE COMMON CAUSE FAILURE IS OFTEN A DOMINANT FACTOR IN THE RISK POSED TO PUBLIC HEALTH AND SAFETY FROM NUCLEAR POWER PLANT ACCIDENTS. A MAJOR PROBLEM ASSOCIATED WITH PERFORMING A CFFA IS THE ABSENCE OF SUPPORTING QUALITATIVE OR QUANTITATIVE COMPONENT FAILURE DATA. EXTENSIVE AMOUNTS OF CO ...

    SBIR Phase I 1983 Nuclear Regulatory Commission
  10. Controlled Spawning and Larviculture of Florida Pompano

    SBC: HarvestFresh Seafoods, Inc.            Topic: N/A

    Development of technology for the predictable, natural spawning of captive Florida pompano (Trachinotus carolinus) utilizing photoperiod and temperature manipulation is propose, along with the subsequent larval rearing and fingerling production through a joint effort between HarvestFresh Seafoods, Inc., and the Department of Wildlife and Fisheries Sciences at Texas A&M University. The pompano is a ...

    SBIR Phase I 1997 Department of Commerce
US Flag An Official Website of the United States Government