The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
AN YTTRIUM ALUMINUM PEROVSKITE BASED GAMMA-RAY DOSIMETER
SBC: W Peter Trower Inc. Topic: N/AN/A
SBIR Phase I 1994 Nuclear Regulatory Commission -
COMMON CAUSE FAILURE ANALYSIS (CCFA) IS AN IMPORTANT ELEMENTOF A COMPLETE PROBABILISTIC RISK ASSESSMENT (PRA) SINCE COMMON CAUSE FAILURE IS OFTEN A DOMINANT FACTOR IN THE RISK POSED TO PUBLIC HEALTH AND SAFETY FROM NUCLEAR POWER PLANT ACCIDENTS.
SBC: Jfb Associates Inc. Topic: N/ACOMMON CAUSE FAILURE ANALYSIS (CCFA) IS AN IMPORTANT ELEMENTOF A COMPLETE PROBABILISTIC RISK ASSESSMENT (PRA) SINCE COMMON CAUSE FAILURE IS OFTEN A DOMINANT FACTOR IN THE RISK POSED TO PUBLIC HEALTH AND SAFETY FROM NUCLEAR POWER PLANT ACCIDENTS. A MAJOR PROBLEM ASSOCIATED WITH PERFORMING A CFFA IS THE ABSENCE OF SUPPORTING QUALITATIVE OR QUANTITATIVE COMPONENT FAILURE DATA. EXTENSIVE AMOUNTS OF CO ...
SBIR Phase I 1983 Nuclear Regulatory Commission -
DEVELOPMENT OF IMPROVED TECHNIQUES FOR DYNAMIC PRA
SBC: Frh, Inc. Topic: N/ACHANGES IN PLANT STATUS, EITHER BEFORE OR DURING AN ACCIDENT SEQUENC CAN CONSIDERABLY AFFECT ITS OUTCOME; BOTH THE ACTURAL OUTCOME AND THAT PREDICTED BY PROBABILISTIC RISK ASSESSMENT. IN ORDER TO ACCURATELY REPRESENT THE POSSIBLE ACCIDENTS AND THEIR PROBABILITIES, THE PRA MODEL MUST CONSIDER THE DYNAMIC CHARACTER OF THE PLANT, IT'S SYSTEMS AND OPERATORS. A LIVING, DYNAMIC PRA IS ONE IN WHICH ALL T ...
SBIR Phase I 1994 Nuclear Regulatory Commission -
ENHANCED SIMULATOR TRAINING PROGRAM FOR OPERATORS AT MULTI-UNIT PLANTS.
SBC: Corpe Corp. Topic: N/AAT MULTI-UNIT NUCLEAR GENRATING STATIONS, CONTROL ROOM OPERATORS ARE GENERALLY LICENSED TO OPERATE ALL SIMILAR UNITS. SIMULATOR TRAINING CONDUCTED AT THE LICENSEE TRAINING FACILITY OCCURS ON ONE SIMULATOR WHICH MAY NOT EXACTLY MIMIC ANY UNIT. INADEQUATE TRAINING ON UNIT-TO-UNIT AND UNIT-TO-SIMULATOR DIFFERENCES, IN CONJUNCTION WITH LIMITED PER-PERSON SIMULATOR TRAINING HOURS, CAN RESULT IN INCREAS ...
SBIR Phase I 1994 Nuclear Regulatory Commission -
EXPERIMENTAL EVALUATION OF FIBER OPTIC PRESSURE SENSORS FOR NUCLEAR POWER PLANTS
SBC: ANALYSIS AND MEASUREMENT SERVICE CORPORATION Topic: N/AN/A
SBIR Phase I 1994 Nuclear Regulatory Commission -
FOLLOWING A POST-IRRADIATION THERMAL ANNEAL CYCLE
SBC: Materials Engineering & Topic: N/ATHIS RESEARCH WILL DETERMINE THE CHARACTERISTICS OF FATIGUE INITIATION LIFE, FATIGUE CRACK GROWTH RATES, AND SLOW-STABLECRACK EXTENSIONS FOLLOWING A POST-IRRADIATION ANNEAL. FATIGUE INTITIATION LIFE WILL BE DETERMINED WITH SMOOTH SPECIMENS OF 308 STAINLESS STEEL WHICH HAVE BEEN ANNEALED AND THEN CYCLED IN PRESSURIZED, HIGH-TEMPERATURE WATER. SUBMERGED ARC WELD STEEL (LINDE 80 FLUX) WILL BE PARTIAL ...
SBIR Phase I 1983 Nuclear Regulatory Commission -
NEW SENSOR FOR MEASUREMENT OF AIR MOVEMENT
SBC: ANALYSIS AND MEASUREMENT SERVICE CORPORATION Topic: N/ATHIS PROPOSAL IS PREPARED IN DIRECT RESPONSE TO THE NRC'S SOLICITATION FOR AN IMPROVED DEVICE TO MEASURE AIR MOVEMENT FOR PERSONNEL RADIATION PROTECTION AND HEALTH PHYSICS APPLICATIONS IN NUCLEAR FACILITIES. THE PURPOSE OF THE NEW DEVICE IS TO PROPERLY LOCATE AIR SAMPLERS SO THAT THE AIR SAMPLED IS REPRESENTATIVE OF THE AIR INHALED BY WORKERS. ALTHOUGH AIR FLOW RATE SENSORS SUCH AS ANEMOMETERS ARE ...
SBIR Phase I 1994 Nuclear Regulatory Commission -
ROBOTICS APPLICATION FOR EXPOSURE REDUCTION
SBC: Remotec Inc. Topic: N/AN/A
SBIR Phase I 1983 Nuclear Regulatory Commission -
ROBUST, ACCURATE, NON-CONTACTING VIBRATION MEASUREMENT SYSTEM
SBC: EPOCH ENGINEERING, INC. Topic: N/AWHEN ROTATING MACHINERY DETERIORATES, VIBRTION PATTERSN CHANGE. WHEN BEARING FREQUENCIES APPEAR, THEN INCREASE IN AMPLITUDE, BEARING FAILURE LOOMS. THE SAME WITH VALVES; WHEN THEY LEAK, THEY VIBRATE. AS LEAKAGE INCREASES, THE VIBRATION PATTERN CHANGES. THERE ARE MANY OTHERS. THE KEY IS KNOWING WHERE AND HOW DEEPLY TO LOOK. THE KEY IN OLDER REACTOR PLANTS IS TO UNOBTRUSIVELY, ECONOMICALLY BACKFIT S ...
SBIR Phase I 1994 Nuclear Regulatory Commission