You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
OPTIMAL ENERGY MANAGEMENT FOR KINETIC ENERGY WEAPONS
SBC: BARRON ASSOCIATES, INC. Topic: N/AN/A
SBIR Phase I 1990 Department of DefenseMissile Defense Agency -
HYBRIDIZED METAL MATRIX COMPOSITES FOR PASSIVE DAMPING
SBC: CORDEC CORP. Topic: N/AN/A
SBIR Phase I 1990 Department of DefenseMissile Defense Agency -
HIGH SPECIFIC POWER/ENERGY RECHARGEABLE BATTERY CONCEPT
SBC: Innovations Solutions From Adv Topic: N/AN/A
SBIR Phase I 1990 Department of DefenseMissile Defense Agency -
MONITORING/MODIFYING THIN FILM GROWTH
SBC: IONWERKS INC Topic: N/AN/A
SBIR Phase I 1990 Department of DefenseMissile Defense Agency -
OXIDATION AND WEAR-RESISTANT CARBON-CARBON COMPOSITES
SBC: LYNNTECH INC. Topic: N/AN/A
SBIR Phase I 1990 Department of DefenseMissile Defense Agency -
ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT
SBC: MISSION RESEARCH CORP. Topic: N/AMRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...
SBIR Phase I 1990 Nuclear Regulatory Commission -
CROSSED-FIELD WIGGLER
SBC: MISSION RESEARCH CORP. Topic: N/AN/A
SBIR Phase I 1990 Department of DefenseMissile Defense Agency -
DIAMOND ATOMIC LAYER EPITAXY
SBC: Schmidt Instruments Inc. Topic: N/AN/A
SBIR Phase I 1990 Department of DefenseMissile Defense Agency -
N-TYPE SEMICONDUCTING DIAMOND FOR DEVICE APPLICATIONS
SBC: Schmidt Instruments Inc. Topic: N/AN/A
SBIR Phase I 1990 Department of DefenseMissile Defense Agency -
IMPROVEMENTS IN MOTOR OPERATED GATE VALVE DESIGN AND PREDICTIVE MODELS FOR RELIABILITY IMPROVEMENTS IN NUCLEAR POWER PLANT SAFETY SYSTEMS
SBC: KALSI ENGINEERING, INC Topic: N/AMOTOR OPERATED GATE VALVE OPERABILITY PROBLEMS AND FAILURES AT NUCLEAR POWER PLANTS ARE A MAJOR SAFETY CONCERN AS STATEDIN NRC IE BULLETIN 85-03 AND GENERIC LETTER 89-10. THIS PROPOSAL IS AIMED AT IMPROVING GATE VALVE PERFORMANCE BY (1) DEVELOPING COMPREHENSIVE PERFORMANCE PREDICTION MODELS FOR USE OVER A RANGE OF OPERATING CONDITIONS, (2) DEFINING LIMITS, BASED ON SPECIFIC DESIGNS, BEYOND WHICH E ...
SBIR Phase I 1990 Nuclear Regulatory Commission