You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
DEVELOPMENT OF A SELF-RESTORING CHANNELIZING DEVICE
SBC: Adian Engineering Corp. Topic: N/AN/A
SBIR Phase I 1987 Department of Transportation -
US FLAG COASTAL RO/RO SHIPS; APPLICATION OF CASSETTE TECHNOLOGY
SBC: Advanced Marine Enterprises, Topic: N/ATHIS STUDY WILL EVALUATE THE RANGE OF SHIP SIZES AND POWER LEVELS (SPEEDS) TO DETERMINE THE OPTIMUM SHIP CHARACTERISTICS FOR OPERATING U.S. FLAG RO/RO SHIPS IN U.S. COASTAL SERVICE. RO/RO CARGO HANDLING TECHNIQUES PREVALENT IN EUROPE AND SCANDINAVIA WILL BE INCORPORATED AS A FUNDAMENTAL ELEMENT OF THE SERIES OF SHIPS INVESTIGATED. THESE TECHNIQUES INVOLVE THE USE OF CASSETTES TO HANDLE CONTAINERS ...
SBIR Phase I 1994 Department of Transportation -
WEIGHING TRUCK COMBINATIONS IN MOTION, SOLELY ON THE TRACTOR
SBC: Airsport Corp. Topic: N/AN/A
SBIR Phase I 1994 Department of Transportation -
ON-BOARD BAR CODE DATA COLLECTION AND ANALYSIS SYSTEM
SBC: B R Blackmarr & Assoc Topic: N/ATHE PROPOSED PROJECT WILL DETERMINE THE FEASIBILITY OF DEVELOPING A LOW-COST, INTEGRATED, BAR CODE TECHNOLOGY BASED INFORMATION SYSTEM WHICH CAN BE INSTALLED ON TRANSIT VEHICLES. THE PROJECT WILL RESULT IN A SURVEY BASED APPLICATION FEATURE REQUIREMENTS DEFINITION, A PHYSICALLY INTEGRATED HARDWARE AND OPERATING SYSTEM PLATFORM SPECIFICATION TO SUPPORT THE APPLICATIONS, A DETAILED APPLICATIONS SOFT ...
SBIR Phase I 1994 Department of Transportation -
COMMERCIAL SPACE LAUNCH FREQUENCY REQUIRMENTS
SBC: Berner, Lanphier & Assoc Inc. Topic: N/AN/A
SBIR Phase I 1994 Department of Transportation -
ENHANCED SIMULATOR TRAINING PROGRAM FOR OPERATORS AT MULTI-UNIT PLANTS.
SBC: Corpe Corp. Topic: N/AAT MULTI-UNIT NUCLEAR GENRATING STATIONS, CONTROL ROOM OPERATORS ARE GENERALLY LICENSED TO OPERATE ALL SIMILAR UNITS. SIMULATOR TRAINING CONDUCTED AT THE LICENSEE TRAINING FACILITY OCCURS ON ONE SIMULATOR WHICH MAY NOT EXACTLY MIMIC ANY UNIT. INADEQUATE TRAINING ON UNIT-TO-UNIT AND UNIT-TO-SIMULATOR DIFFERENCES, IN CONJUNCTION WITH LIMITED PER-PERSON SIMULATOR TRAINING HOURS, CAN RESULT IN INCREAS ...
SBIR Phase I 1994 Nuclear Regulatory Commission -
Improved Source Location Using Sensor-Arrays
SBC: Cyltek, Inc. Topic: N/AN/A
SBIR Phase I 1997 Department of Transportation -
TRANSIT SYSTEM COMPUTER SIMULATION MODELS
SBC: Decision Dynamics, Inc. Topic: N/ATHIS PROPOSAL DESCRIBES A MICRO-LEVEL STRATEGIC TRANSIT SIMULATION MODEL THAT QUANTIFIES THE DIFFICULT TRADEOFFS BETWEEN COST, PERFORMANCE AND TIME. THE MODEL UTILIZES SYSTEM DYNAMICS TO CAPTURE THE COMPLEX, NON-LINEAR FEEDBACK STRUCTURE THAT GOVERNS SYSTEM BEHAVIOR, INCORPORATING SUCH TRANSIT OPERATIONS AS VEHICLE MANAGEMENT, SERVICE LEVELS, FARES, RIDERSHIP, MARKETING, REVENUES, CONGESTION, POLL ...
SBIR Phase I 1994 Department of Transportation -
Digital Waveform-based System for AE Measurement for NDT
SBC: Dvp, Inc. Topic: N/AN/A
SBIR Phase I 1996 Department of Transportation -
RESTRICTED VISIBILITY WARNING SYSTEM
SBC: Ecotek International Topic: N/AECOTEK INTERNATIONAL PROPOSES AN ALL SOLID-STATE VISIBILITY MONITORING SYSETM THAT WILL BE USED TO MONITOR VISIBILITY CONDITIONS ALONG ROADWAYS AND WARN TRAVELERS OF LOW VISIBILITY CONDITIONS. THE PURPOSE OF THE SYSTEM IS TO REDUCE THE NUMBER OF MULTIPLE-VEHICLE COLLISIONS AND CONSEQUENT FATALITIES, INJURIES, AND PROPERTY DAMAGES. THE SYSTEM IS BASED ON AN INNOVATIVE APPROACH TO A WELL-ESTABLISHED ...
SBIR Phase I 1994 Department of Transportation