You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Process-Based Assurance Product Suite

    SBC: Arca Systems, Inc.            Topic: N/A

    Arca proposes research leading to development of a suite of methodology support products to help meet the need for innovative assurance techniques appropriate for emerging information technologies. The product will consist of a licensable methodology and supporting materials for specifying, building, and evaluating assurance arguments for products and systems based on the capability of security en ...

    SBIR Phase I 1997 Department of Commerce
  2. A 3-D Machine Tool Error Modeling System

    SBC: AUTOMATED PRECISION, INC.            Topic: N/A

    In response to the increasing demand for better understanding of the manufacturing processes and the machining systems, a new testing standard--ASME B5.54 and a family of new testing instruments have been developed for evaluating the performances of a variety of CNC machining centers. Because of the advancement and versatility of the new instruments, test data are being collected at a much higher ...

    SBIR Phase I 1997 Department of Commerce
  3. Algorithms for Health Care Quality Management and Outcomes Assessment

    SBC: BARRON ASSOCIATES, INC.            Topic: N/A

    American health care is in the midst of momentous change. Quality improvement principles are being used increasingly to enhance productivity and efficiency of health care delivery and to help contain costs. In producing patient outcomes and resource utilization measures, it is vital to control appropriately for case mix (i.e., differences in patients due, e.g., to illness severity) in the predicti ...

    SBIR Phase I 1997 Department of Commerce
  4. Crosswind and Range Measurement Lidar for Sniper's Sights

    SBC: BRIMROSE CORPORATION OF AMERICA            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of DefenseSpecial Operations Command
  5. A Ruggedized System for Measuring Extreme Winds

    SBC: Caregiver Technologies, Inc.            Topic: N/A

    We will develop technology, termed a Ruggedized Wind Measurement System (RWMS), to measure directly extreme winds with high space and time resolution, focusing on the winds that occur beneath hurricanes at land fall. This development effort will include design, fabrication of two prototype RWMS units, and a series of proof-of-concept demonstrations in strong mountain-induced downslope and severe t ...

    SBIR Phase I 1997 Department of Commerce
  6. ASSESSING AND INCREASING THE TESTABILITY OF OBJECT-ORIENTED SOFTWARE

    SBC: Cigital, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of Commerce
  7. ENHANCED SIMULATOR TRAINING PROGRAM FOR OPERATORS AT MULTI-UNIT PLANTS.

    SBC: Corpe Corp.            Topic: N/A

    AT MULTI-UNIT NUCLEAR GENRATING STATIONS, CONTROL ROOM OPERATORS ARE GENERALLY LICENSED TO OPERATE ALL SIMILAR UNITS. SIMULATOR TRAINING CONDUCTED AT THE LICENSEE TRAINING FACILITY OCCURS ON ONE SIMULATOR WHICH MAY NOT EXACTLY MIMIC ANY UNIT. INADEQUATE TRAINING ON UNIT-TO-UNIT AND UNIT-TO-SIMULATOR DIFFERENCES, IN CONJUNCTION WITH LIMITED PER-PERSON SIMULATOR TRAINING HOURS, CAN RESULT IN INCREAS ...

    SBIR Phase I 1994 Nuclear Regulatory Commission
  8. NO MOVING PARTS RAIN GAUGE

    SBC: THE CORE GROUP, INC.            Topic: N/A

    THE U.S. WEATHER SERVICE PRESENTLY USES A "TIPPING BUCKET" RAIN GAUGE FOR MEASURING RAIN ACCUMULATION. THIS DEVICE IS SENSITIVE TO WIND AND MOTION (AS ON BUOYS), CANNOT MEASURE RAIN RATE, AND REQUIRES FREQUENT MAINTENANCE, BECAUSE OF MOVING PARTS. AN ALTERNATIVE DEVICE IS BEING PROPOSED, WHICH INCORPORATES A RIGID, RESONANT TUBE, CLOSED AT THE TOP BY AN ELECTRO-ACOUSTIC TRANSDUCER, AND AT THE BOTT ...

    SBIR Phase I 1994 Department of Commerce
  9. EB Curing of VARTM Fabricated Maritime Composite Structures

    SBC: DAMILIC Corporation            Topic: N/A

    DAMILIC and others have already demonstrated that EB cured composite structures have mechanical properties comparable to those of a standard thermally cured part. The objective of this Phase I program has is to demonstrate that standard, commercially available, resin transfer molding techniques can be combined with the high speed electron beam process to produce maritime structures and higher spe ...

    SBIR Phase I 1996 Department of DefenseSpecial Operations Command
  10. Acoustic Pressure Gradient Imager For Divers

    SBC: EMPIRICAL TECHNOLOGIES CORPORATION            Topic: N/A

    The contractor has patented technology for a unique process that directly converts a two-dimensional acoustic disturbance, such as a wave front, into an intensity-mapped visible image in real-time without electronic circuitry; that is, it is a direct pressure gradient imager. The imager relies on the piezo-dichroic properties of a continuous layer of a dichroic material thin film that serves as bo ...

    SBIR Phase I 1994 Department of DefenseSpecial Operations Command
US Flag An Official Website of the United States Government