You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Plasma Limiter: RF Mitigation Device for Operation in Stressing Environments

    SBC: ACCURATE AUTOMATION CORPORATION            Topic: N/A

    The widespread use of communication devices and radar systems has made our society increasingly vulnerable to disruptive, high-power, short pulse electromagnetic interference (EMI) and high power microwaves (HPM). Significant advances in devices thatproduce these high-power, short pulses have been made in the US and abroad in the past few decades. As a result, the need for devices that can prote ...

    SBIR Phase I 2003 Department of DefenseMissile Defense Agency
  2. DIRECTED ENERGY SYSTEM POINTING THROUGH GEOSYNCRONOUS POSITIONING SATELLITE INTERFEROMETRY

    SBC: Adroit Systems, Inc.            Topic: N/A

    CURRENT STUDIES CONCENTRATE ON GLOBAL POSITIONING SYSTEM (GPS) AS A SPACECRAFT ATTITUDE DETERMINATION TOOL. TWO GPS ANTENNAS RECEIVING THE SAME SIGNAL CAN COMPARE THEIR RELATIVE PHASES TO DETERMINE THE ANGLE BETWEEN THE TWO ANTENNAS AND THE GPS SATELLITE. BY COMPUTING THE ANGLE TO THREE OR MORE SATELLITES, THE COMPLETE INERTIAL ORIENTATION MAY BE DETERMINED. APPLYING ADVANCES IN GPS INTERFEROMETRY ...

    SBIR Phase II 1988 Department of DefenseMissile Defense Agency
  3. PULSE DETONATION SYNTHESIS FOR HIGH TEMPERATURE CERAMIC COMPOSITES AND COATINGS

    SBC: Adroit Systems, Inc.            Topic: N/A

    Adroit Systems, Inc. will develop a Pulse Detonation Synthesis (PDS) process to manufacture ceramic powders from gas-powder reactant mixtures more efficiently and inexpensively than current methods. A high combustion rate and simple design make the PDS system capable of mass producing these powders, which are used as raw materials for high-temperature, high-performance ceramics and ceramic composi ...

    SBIR Phase I 1994 Department of DefenseMissile Defense Agency
  4. Ion-Implanted 2-D MESFET Technology for Wireless Communications

    SBC: Advanced Device Technologies,            Topic: N/A

    This Phase I project has two primary objectives. The first objective is to evaluate the feasibility of a fully ion implanted fabrication process based on the heterodimensional 2-D MESFET. The new device, the 2-D JFET, will have p+ ion implanted sidegates which laterally modulate a thin, highly doped n-type conducting channel. The 2-D JFET should have excellent high speed, low power characteristics ...

    SBIR Phase I 1997 Department of DefenseMissile Defense Agency
  5. Mission Flexible, Low Cost, Suborbital Launch Vehicle

    SBC: AEROASTRO, INC.            Topic: N/A

    LACK OF RELIABLE, FLEXIBLE, LOW COST TRANSPORTATION FOR SMALL PAYLOADS IS A BOTTLENECK IN THE DEVELOPMENT AND DEPLOYMENT OF SPACE BASED SYSTEMS. PACASTRO'S FAMILY OF ROCKET VEHICLES, EMPLOYING A CORE PRESSURE-FED, LIQUID PROPULSION UNIT AND ELECTRONICS AND SOFTWARE TECHNOLOGY DEVELOPED IN SMALL LOW COST SPACECRAFT PROGRAMS, WILL CUT IN HALF THE PRICE OF LAUNCHING SMALL SUBORBITAL AND ORBITAL PAYLO ...

    SBIR Phase II 1994 Department of DefenseMissile Defense Agency
  6. Demonstration of On-Orbit Logistics System

    SBC: AEROASTRO, INC.            Topic: N/A

    On-orbit servicing and logistics support spacecraft could greatly enhance the flexibility and functionality of many future MDA space assets by providing, refueling, diagnostic, or component replacement services. AeroAstro proposes to take the first stepstowards achieving an affordable on-orbit servicing and logistics capability by developing a scaleable, modular spacecraft architecture and applyi ...

    SBIR Phase II 2003 Department of DefenseMissile Defense Agency
  7. Image Processing Algorithms for Target Discrimination

    SBC: AKOS ZARANDY EUTECUS, INC.            Topic: N/A

    A cellular neural network (CNN) technology based adaptive multi-target track-ing and discrimination system with compact cellular visual microprocessor is pro-posed.Methodology: The primary motivation of the present proposal is to offer a to-pographic microprocessor architecture for multi-target discrimination with embedded sensors capable of operating in a process real-time manner. The performance ...

    SBIR Phase I 2003 Department of DefenseMissile Defense Agency
  8. Material Growth and Bandgap Engineering of DMS Crystals and Q-Switching and Isolation of Near/Mid IR Lasers

    SBC: American Research Corporation of Virginia            Topic: N/A

    Development of reliable (Q-) switching and isolation materials is being sought for near-to-mid infrared lasers for safety, extended life and fiber optic communication. The voltage or E-field controlled (Q-) switching materials such as Pockels cells and liquid Kerr cells are not reliable for long term operation in tactica applications due to crystal surface (e.g., KDP, ADP) degradation by moisture ...

    SBIR Phase I 1992 Department of DefenseMissile Defense Agency
  9. LASER ALLOYING OF PLASMA-DEPOSITED COATINGS FOR PROTECTION AGAINST ATOMIC OXYGEN

    SBC: American Research Corporation of Virginia            Topic: N/A

    N/A

    SBIR Phase I 1988 Department of DefenseMissile Defense Agency
  10. ASSESSMENT OF SMART SENSOR TECHNOLOGIES FOR CONVENTIONAL ANDADVANCED LWRS

    SBC: ANALYSIS AND MEASUREMENT SERVICE CORPORATION            Topic: N/A

    A RESEARCH PROJECT IS PROPOSED TO EVALUATE THE SUITABILITY OF NEWLY DEVELOPED SMART SENSOR TECHNOLOGIES FOR BOTH OF THEFOLLOWING NUCLEAR POWER PLANT APPLICATIONS: MANAGEMENT OF AGING DEGRADATION OF SAFETY SYSTEM TEMPERATUREAND PRESSURE SENSORS IN CONVENTIONAL LWRS SMART TEMPERATURE AND PRESSURE SENSORS FOR ADVANCED LWRS. THE PROJECT WILL ADDRESS BOTH THE CALIBRATION DRIFT AND RESPONSE TIME DEGRADA ...

    SBIR Phase II 1992 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government