You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY20 is not expected to be complete until September, 2021.

  1. Economical and Reliable Adaptive Disturbance Cancellation for Lightly Damped Systems

    SBC: PLANNING SYSTEMS, INC.            Topic: N/A

    Efforts to apply active noise and vibration control commercially, while intensifying, continue to be hampered by the cost of the computers required to implement the active algorithms. Currently, the cost of wide-band control is prohibitive for lightly damped systems such as precision structures or highly reverberant acoustic spaces, even if the system has just one canceling actuator and one error ...

    SBIR Phase I 1997 Department of DefenseAir Force
  2. Processing of Selectively-Discontinuous-Fiber (SDF) Composite Materials

    SBC: Advanced Composite Operations            Topic: N/A

    This proposal is directed at creating discontinuous unidirectional composite from continuous unidirectional prepreg. The process, Selectively-Discontinuous-Fiber (SDF), introduces micro-cuts in preimpregnated unidirectional materials at specified locations. This process will allow unidirectional composite prepreg to be used for the fabrication of complex-compound components that have be ...

    SBIR Phase I 1996 Department of DefenseAir Force
  3. Flight Control Technology

    SBC: DIGITAL SYSTEM RESOURCES, INC.            Topic: N/A

    The Air Force has identified the need to develop affordable flight control technology to support Air Force Global Engagement objectives. Of particular interest to the Air Force is the development of real-time optimization algorithms for cooperative engagement solutions among Uninhabited Air Vehicles (UAV) in a multiple target environment. DSR proposes developing a real-time, rule based, Cooperat ...

    SBIR Phase I 1997 Department of DefenseAir Force
  4. Novel Pulsed Nitrogen Source Diagnostic for GaN Thin Film Stoichiometry Control

    SBC: Ionwerks, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of DefenseAir Force
  5. A Comprehensive System for the Prevention and Remediation of Biofilms in Dental Equipment

    SBC: Lynntech Inc.            Topic: N/A

    There is a substantial body of evidence demonstrating that biofilms growing inside the water lines of dental units pose a significant risk as a source of infection. The problem has been recognized by practitioners, regulators, manufacturers, and the ADA, with the ADA proposing a set of guidelines for water quality that include a limit of 200 colony forming units per milliliter for the year 2000. ...

    SBIR Phase I 1997 Department of DefenseAir Force
  6. A Fiber Optic Electrochemiluminescence Sensor for the Detection of Organic Pollutants and Trace Metals i

    SBC: Lynntech Inc.            Topic: N/A

    Chemiluminescence is a powerful analytical technique that exhibits high sensitivity and selectivity. This technique when coupled with electrolysis is greatly advantageious over the conventional methods as the reagents are produced in situ at the electrode. The presence of trace amounts of solvents such as TCE, PCE, methylene chloride and carbon tetrachloride can be monitored using the method of ...

    SBIR Phase I 1997 Department of DefenseAir Force
  7. Automated Long Taper Hone

    SBC: REINHART & ASSOC., INC.            Topic: N/A

    The prototype of an automated computer controlled precision hone will be built and evaluated in Phase I. The prototype hone will evaluate in situ bore measurement as a means to reduce the overall time required for maintenance honing of long tapered bores currently in use at a government facility. The measurement system would be used as a feedback signal to control the honing head's forward progr ...

    SBIR Phase I 1997 Department of DefenseAir Force
  8. A Job Performance Measurement System

    SBC: Research Development Corporation            Topic: N/A

    As organizations move toward increased performance measurement and accountability, there is an increasing need to measure job performance at the individual worker level. Traditional assessment tools have been criticized as measuring test taking skills more than job performance skills. A number of approaches have been developed to address this weakness by measuring performance in practical proble ...

    SBIR Phase I 1997 Department of DefenseAir Force
  9. Programmable Universal Multi-Input Encoder/Decoder

    SBC: Systems & Processes Engineering Corporation            Topic: N/A

    Systems & Processes Engineering Corporation (SPEC) proposes to develop a Multi-Input Encoded/Decoder Application Specific Integrated Circuit (ASIC) chipset to be a programmable, universal interface between test equipment and digital recorders. The ASIC chepset will be fabricated using advanced GaAs MESFET technology. The Multi-Input Encoder/Decoder will be designed to interface both existing har ...

    SBIR Phase I 1996 Department of DefenseAir Force
  10. Multi-Analyte Immunomagnetic Electrochemiluminescence (ECL) System for Environmental Applications

    SBC: Systems & Processes Engineering Corporation            Topic: N/A

    Environmental monitoring is difficult because of the large number of potential pollutants and broad range of their chemical classes. A multi-analyte environmental screening and monitoring instrument which is fast, portable, species specific, fieldable, cost-effective and flexible is clearly needed to plan and carry out the remediation of contaminated waste sites and to monitor and char ...

    SBIR Phase I 1996 Department of DefenseAir Force
US Flag An Official Website of the United States Government