You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Data Fusion for Timely Screening of Treaty Verification Data

    SBC: ABTECH CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of Energy
  2. Ultrafast Polysilylene Scintillators

    SBC: Adherent Technologies, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Energy
  3. Directed Reflectivity, Long Life AMTEC Condenser

    SBC: ADVANCED MODULAR POWER SYSTEMS            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Energy
  4. A LOW EMISSION ALKALI METAL THERMAL TO ELECTRIC CONVERTER AUTOMOTIVE POWER SYSTEM

    SBC: ADVANCED MODULAR POWER SYSTEMS            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of Energy
  5. Template-Medicated Synthesis of Periodic Membranes for Improved Liquid-Phase Separations

    SBC: American Research Corporation of Virginia            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Energy
  6. A Fuzzy Expert Systems-Based Standard Generalized Markup Language Interface for Access and Collaborative Authoring of Multi-Domain Technical Documents on a Wide Area Network

    SBC: American Research Corporation of Virginia            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of Energy
  7. A HIGH POWER THICK TARGET DESIGN FOR IRRADIATION BY HIGH INTENSITY CHARGED PARTICLE BEAMS

    SBC: Amparo Corp.on            Topic: N/A

    PHASE I ADDRESSES A NEW APPROACH FOR THE DESIGN OF HIGH POWER NUCLEAR TARGETS USED FOR PRODUCTION OF RADIOISOTOPES BY HIGH ENERGY CHARGED PARTICLE BEAMS, NOTABLY HIGH ENERGY PROTONS. SUCH TARGETS WILL YIELD LARGER QUANTITIES OF RADIOACTIVE SPECIES THAN PRESENTLY AVAILABLE, EITHER FOR BASIC RESEARCH (E.G., STUDIES USING RADIOACTIVE BEAMS) OR FOR APPLIED PURPOSES (E.G., PRODUCTION OF MEDICAL RADIOI ...

    SBIR Phase I 1994 Department of Energy
  8. High Power Target Design for a Next Generation Radioactive Beam ISOL-Type Facility

    SBC: Amparo Corp.on            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Energy
  9. A HIGH POWER SOLID-STATE AMPLIFIER

    SBC: Amparo Corp.on            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of Energy
  10. DEVELOPMENT OF PENETRATION ENHANCEMENT FOR THE CONE PENETROMETER USING SONIC DRILLING TECHNOLOGY

    SBC: Applied Research Associates, Inc.            Topic: N/A

    IN THIS PROJECT, THE FEASIBILITY OF COMBINING SONIC DRILLING AND CONE PENETRATION TECHNOLOGIES WILL BE EVALUATED AND A SET OF PRELIMINARY DESIGN DRAWINGS DEVELOPED. SONIC DRILLING TECHNOLOGY HAS RECENTLY BEEN DEMONSTRATED AT THE HANFORD SITE, WA. THE RESULTS OF THE DEMONSTRATION PROVED THAT SMALL DIAMETER MONITORING WELLS COULD BE INSTALLED TO THE DESIRED DEPTH IN A RAPID MANNER USING THIS TECHN ...

    SBIR Phase I 1994 Department of Energy
US Flag An Official Website of the United States Government