You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Low Friction hybridSil Coatings for Preventing Vehicle Rollover on Concrete Barriers

    SBC: NANOSONIC INC.            Topic: 121FH1

    The objective of this DoT SBIR program is to establish a technical foundation enabling the rapid commercial integration of low friction HybridSil™ coatings on concrete barriers for drastic reductions in vehicle rollover potential. Phase I coatings would have immediate utility within a broad spectrum of concrete barriers designs with readily spray or paint depositions capabilities in traffic env ...

    SBIR Phase I 2012 Department of Transportation
  2. US FLAG COASTAL RO/RO SHIPS; APPLICATION OF CASSETTE TECHNOLOGY

    SBC: Advanced Marine Enterprises,            Topic: N/A

    THIS STUDY WILL EVALUATE THE RANGE OF SHIP SIZES AND POWER LEVELS (SPEEDS) TO DETERMINE THE OPTIMUM SHIP CHARACTERISTICS FOR OPERATING U.S. FLAG RO/RO SHIPS IN U.S. COASTAL SERVICE. RO/RO CARGO HANDLING TECHNIQUES PREVALENT IN EUROPE AND SCANDINAVIA WILL BE INCORPORATED AS A FUNDAMENTAL ELEMENT OF THE SERIES OF SHIPS INVESTIGATED. THESE TECHNIQUES INVOLVE THE USE OF CASSETTES TO HANDLE CONTAINERS ...

    SBIR Phase I 1994 Department of Transportation
  3. WEIGHING TRUCK COMBINATIONS IN MOTION, SOLELY ON THE TRACTOR

    SBC: Airsport Corp.            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of Transportation
  4. "Rolling Deflectometer"

    SBC: Applied Research Associates, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of Transportation
  5. RESTRICTED VISIBILITY WARNING SYSTEM

    SBC: Ecotek International            Topic: N/A

    ECOTEK INTERNATIONAL PROPOSES AN ALL SOLID-STATE VISIBILITY MONITORING SYSETM THAT WILL BE USED TO MONITOR VISIBILITY CONDITIONS ALONG ROADWAYS AND WARN TRAVELERS OF LOW VISIBILITY CONDITIONS. THE PURPOSE OF THE SYSTEM IS TO REDUCE THE NUMBER OF MULTIPLE-VEHICLE COLLISIONS AND CONSEQUENT FATALITIES, INJURIES, AND PROPERTY DAMAGES. THE SYSTEM IS BASED ON AN INNOVATIVE APPROACH TO A WELL-ESTABLISHED ...

    SBIR Phase I 1994 Department of Transportation
  6. "Sensor Systems for Hazardous Conditions in High Speed Rail"

    SBC: ENSCO Inc            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of Transportation
  7. Ionic Self-Assembled Organic/ Inorganic Nonparticle Coatings and Composites

    SBC: LUNA INNOVATIONS INCORPORATED            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of Transportation
  8. Water Quality Monitoring Device

    SBC: Gky And Associates, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Transportation
  9. Development of a Performance Assessment Process Controller

    SBC: Innovative Tech. Solutions            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  10. Unobtrusive Eyelid Closure & Visual Point of Regard Measurement Device

    SBC: EYEGAZE INC            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of Transportation
US Flag An Official Website of the United States Government