You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A Vacuum Arc Ion Thruster for Space Propulsion

    SBC: ALAMEDA APPLIED SCIENCES CORPORATION            Topic: N/A

    Alameda Applied Sciences Corporation (AASC) and its co-operative partner, the Plasma Applications Group at Lawrence Berkeley National Laboratory (PAG/LBNL) propose to develop and commercialize a sub-kW vacuum arc ion thruster for electric propulsion and other government and commercial applications. The proposed thruster will use a solid propellant, which offers several advantages over Xenon or ...

    SBIR Phase I 1997 Department of DefenseAir Force
  2. Data Mining and Integration Technologies for Information Exploitation

    SBC: DEUMBRA, INC.            Topic: N/A

    We shall deliver an information exploitation demonstration prototype simulatirsg actual rlata exploitation. Within this prototype we shall deliver five different types of capabilities. The first three capabilities are data mining tools. These tools shall demonstrate the capability of identifying electronic patterns or f ingerprints in data, relationships between data, and visualizations of such ...

    SBIR Phase I 1997 Department of DefenseAir Force
  3. Voice Controlled Office Assistant Using Abductive Networks ($19,968 Phase I option proposed)

    SBC: ABTECH CORPORATION            Topic: N/A

    AbTech will survey the hardware and software available to determine what capabilities should be included in an automated office assistant software suite. A language parsing and encoding system in ANN (a leading semantic understanding software package) will be used to parse and encode ASCII output resulting from a voice recognition system such as DragonDictate. The ASCII output from the voice recog ...

    SBIR Phase I 1994 Department of DefenseAir Force
  4. Abductive Electronics Prognostic Tool (ADEPT)

    SBC: ABTECH CORPORATION            Topic: N/A

    AbTech Corporation proposes to apply its unique Statistical Network ModelingTM technology to develop a non contact prognostic assessment tool that 1) acquires, processes, and analyzes electronic radiated signal data, 2) learns the expected characteristics and patterns of specific radiated signals measured from microelectronic semiconductor devices using AbTech's statistical network modeling techno ...

    SBIR Phase I 1997 Department of DefenseAir Force
  5. Hybrid Statistical Network/Expert System Approach for Advanced Data Fusion

    SBC: ABTECH CORPORATION            Topic: N/A

    The human brain processes information from several sensors of the body and extracts meaningful information about the environment. Likewise, the ability to fuse multilevel, multifaceted processes dealing with the association, correlation, and combination of data from single or multiple sources is desired to attain state and identity estimates in a timely manner. However, current data fusion techniq ...

    SBIR Phase I 1997 Department of DefenseAir Force
  6. ModelQuest Satellite Telemetry Anomaly Resolution (MQ STAR)

    SBC: ABTECH CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of DefenseAir Force
  7. SAR-Based Automatic Target Recognition Avionics System

    SBC: ABTECH CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of DefenseAir Force
  8. Integrated Avionics Information Processing Development

    SBC: ABTECH CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of DefenseAir Force
  9. DEVELOPMENT OF A DYNAMIC OPERATIONAL RISK MODEL TO SUPPORT RISK MANAGEMENT OF NUCLEAR POWER PLANTS

    SBC: Accident Prevention Group            Topic: N/A

    CURRENT ACTIVITY WITHIN THE NRC AND THE NUCLEAR INDUSTRY SEEKS TO EXPLOIT THE BENEFITS OF PRA IN RISK-BASED APPROACHES TO RELIEVE REGULATORY BURDEN ON THE ECONOMICALLY THREATENED NUCLEAR POWER PLANTS. THE ACCIDENT PREVENTION GROUP HAS BEEN DEVELOPING THE CONCEPT OF AN INTEGRATED RISK MANAGEMENT PROGRAM (IRMP) TOWARD SUCH GOALS. A KEY ELEMENT OF AN IRMP IS AN "OPERATIONAL RISK MODEL" OF THE NPP THA ...

    SBIR Phase I 1994 Nuclear Regulatory Commission
  10. Integrated Risk Management and Quality Assurance

    SBC: Accident Prevention Group            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government