You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Soalr Power array/satellite communications antenna

    SBC: ASTRON WIRELESS TECHNOLIGIES, INC.            Topic: N/A

    Satellite Communication (SATCOM) is a necessity for teams (military or commercial) that are deployed away from their parent organizations. Unfortunately they may not have sufficient power supply/battery capability. By combining a SATCOM Antenna and Solar Cell Array protable, lightweight, and self-sufficient SATCOM Radio will increase the teams efficiency. Astron's experience in the design of UHF S ...

    SBIR Phase I 1994 Department of DefenseArmy
  2. Transfer RNA- Mediated Synthesis of Novel Materials

    SBC: Cruachem, Inc.            Topic: N/A

    Misacylated transfer RNA's bearing unusual amino acids will be prepared on a preparative scale and employed in in vitro protein biosynthesizing systems to produce polypeptides containing one or more modified amino acids at predetermined positions. The specific goals of the project include (i) determination of the feasibility of preparing misacylated tRNA's on a preparative scale, (ii) assessment o ...

    SBIR Phase I 1994 Department of DefenseArmy
  3. Methods for Pre-Flight Risk Assessment in Army Aviation

    SBC: Decision Science Associates            Topic: N/A

    Decision Science Associates, Inc. (DSA) proposes to design and prototype an automated decision aid for the assessment of pre-flight risk by Army rotorcraft pilots. This aid will support the rapid assessment of risk based on readily available information. Phase I consists of 4 tasks. In Task 1 we will identify sources of information and determine the critical predictive factors and the types of dat ...

    SBIR Phase I 1994 Department of DefenseArmy
  4. Cartographic animation system

    SBC: Fgm, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of DefenseArmy
  5. Fire Support Suppression Effects in Battlefield Simulation

    SBC: Jhf, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of DefenseArmy
  6. C-C Pistons for high temperature engines

    SBC: MATERIALS MODIFICATIONS INC            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of DefenseArmy
  7. Consolidation Methods for Nanoparticulate Materials

    SBC: MATERIALS MODIFICATIONS INC            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of DefenseArmy
  8. GPS-Driven Battlefield Simulation

    SBC: Mrj Inc.            Topic: N/A

    The Global Positioning System (GPS) satellites and visualization technology are two maturing fields that together can provide battlefield commanders with the ability to see troop and unit operations occur in near real-time. With lightweight, low power, GPS receivers, military units in the field can pinpoint their global position with great accuracy. In addition to position data, the GPS constellat ...

    SBIR Phase I 1994 Department of DefenseArmy
  9. Thin Disks of Conducting Polymers for Screening in the Microwave Region of the Electromagnetic Spectrum

    SBC: Schladitz Technology, Inc.            Topic: N/A

    The leading staff of our company has gained experience, over decades in producing and processing extremely fine metal fibers of high tensile strength and considerable L/D. One of these processes is the fabrication of sturdy networks, containing interconnected high strength metalfibers. According to a patented technique; we infiltrate into the metallic network plastic material, gaining homogenous d ...

    SBIR Phase I 1994 Department of DefenseArmy
  10. Passive Aero-Acoustic Sensor Self Interference Cancellation

    SBC: Signal Separation Tech            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of DefenseArmy
US Flag An Official Website of the United States Government