You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. AN ADAPTING FINITE ELEMENT MODEL FOR UNSATURATED POROUS MEDIA

    SBC: Advanced Projects Research, Incorporated            Topic: N/A

    N/A

    SBIR Phase I 1992 Nuclear Regulatory Commission
  2. AN YTTRIUM ALUMINUM PEROVSKITE BASED GAMMA-RAY DOSIMETER

    SBC: W Peter Trower Inc.            Topic: N/A

    WE PROPOSE TO EXPLOIT THE PROPERTIES OF OUR NEW, FAST, BRIGHT SCINTILLATOR, YAIO3:CE(+3) (YAP), TO CONSTRUCT A DETECTOR FOR PHOTONS WITH ENERGIES FROM 20 KEV TO 3 MEV. AN ARRAY OF THESE INDIVIDUAL DETECTORS WILL SERVE AS THE BASIS FOR A BROAD-BAND Y-RAY DOSIMETER CAPABLE OF MEASURING EXPOSURES FROM 5 MR/H TO 1 R/H AND EQUIVALENT DOSES FROM 5 X 10(-2) TO 10 (+4) MSV/H. THEA ADVANTAGES OF YAP SCINTI ...

    SBIR Phase II 1995 Nuclear Regulatory Commission
  3. AN YTTRIUM ALUMINUM PEROVSKITE BASED GAMMA-RAY DOSIMETER

    SBC: W Peter Trower Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Nuclear Regulatory Commission
  4. A PORTABLE IMAGING SYSTEM FOR NONDESTRUCTIVE EXAMINATION OF NUCLEAR POWER PLANT COMPONENTS

    SBC: TPL, INC            Topic: N/A

    THE DIFFICULTY IN PREDICTING STRUCTURAL DEGRADATION RATES FOR NUCLEAR POWER PLANT COMPONENTS DUE TO CORROSION AND OTHER FACTORS HAS LED TO THE NEED FOR COSTLY, TIME CONSUMING INSPECTIONS AND INCREASED COST FROM INTENTIONALLY OVERDESIGNED COMPONENTS. THE SITUATION INDICATES A SERIOUS, UNMET NEED FOR A SIMPLE BUT ACCURATE SYSTEM FOR REAL- TIME, IN SITU, NONDESTRUCTIVE ANALYSIS OF NUCLEAR POWER PLANT ...

    SBIR Phase II 1994 Nuclear Regulatory Commission
  5. A PORTABLE IMAGING SYSTEM FOR NONDESTRUCTIVE EXAMINATION OF NUCLEAR POWER PLANT COMPONENTS

    SBC: TPL, INC            Topic: N/A

    N/A

    SBIR Phase I 1992 Nuclear Regulatory Commission
  6. COMPUTERIZED EMERGENCY OPERATION PROCEDURES RESEARCH

    SBC: Accident Prevention Group            Topic: N/A

    N/A

    SBIR Phase I 1992 Nuclear Regulatory Commission
  7. CONTROL ROOM INLEAKAGE TEST

    SBC: Lagus Applied Technology Inc.            Topic: N/A

    A SIMPLIFIED RECONNAISSANCE-TYPE TEST IS PROPOSED THAT UTILIZES THE TECHNIQUES OF TRACER GAS VENTILATION TESTING TO QUANTIFY THE UNFILTERED AIR INLEAKAGE INTO AN OPERATING NUCLEAR POWER PLANT CONTROL ROOM. THE TEST WILL BE DEVELOPED TO ENCOMPASS THE FIVE BASIC TYPES OF CONTROL ROOM EMERGENCY VENTILATION SYSTEMS. A THOROUGH ERROR ANALYSIS WILL ALSO BE UNDERTAKEN. A DETAILED TESTING PROTOCOL SUITABL ...

    SBIR Phase I 1994 Nuclear Regulatory Commission
  8. DEVELOPMENT OF A DYNAMIC OPERATIONAL RISK MODEL TO SUPPORT RISK MANAGEMENT OF NUCLEAR POWER PLANTS

    SBC: Accident Prevention Group            Topic: N/A

    CURRENT ACTIVITY WITHIN THE NRC AND THE NUCLEAR INDUSTRY SEEKS TO EXPLOIT THE BENEFITS OF PRA IN RISK-BASED APPROACHES TO RELIEVE REGULATORY BURDEN ON THE ECONOMICALLY THREATENED NUCLEAR POWER PLANTS. THE ACCIDENT PREVENTION GROUP HAS BEEN DEVELOPING THE CONCEPT OF AN INTEGRATED RISK MANAGEMENT PROGRAM (IRMP) TOWARD SUCH GOALS. A KEY ELEMENT OF AN IRMP IS AN "OPERATIONAL RISK MODEL" OF THE NPP THA ...

    SBIR Phase I 1994 Nuclear Regulatory Commission
  9. DEVELOPMENT OF A METHODOLOGY FOR ANALYZING PRECURSORS TO EARTHQUAKE-INITIATED AND FIRE-INITIATED ACCIDENT SEQUENCES

    SBC: Future Resources Associate Inc            Topic: N/A

    ALTHOUGH THE ASP (ACCIDENT SEQUENCE PRECURSOR) METHODOLOGY FOR ANALYZING OPERATIONAL DATA AND EVENTS FOR PRECURSORS TO SEVERE ACCIDENTS HAS BEEN IN EXISTENCE FOR ABOUT A DECADE, IT DOES NOT NOW INCORPORATE THE ANALYSIS OF PRECURSORS TO EARTHQUAKE-INITIATED AND INTERNAL-FIRE-INITIATED ACCIDENT SEQUENCES. THIS PROJECT'S OBJECTIVE IS TO FILL THIS GAP BY DEVELOPING SUCH A METHODOLOGY. THE OBJECTIVE OF ...

    SBIR Phase II 1995 Nuclear Regulatory Commission
  10. DEVELOPMENT OF A METHODOLOGY FOR ANALYZING PRECURSORS TO EARTHQUAKE-INITIATED AND FIRE-INITIATED ACCIDENT SEQUENCES

    SBC: Future Resources Associate Inc            Topic: N/A

    N/A

    SBIR Phase I 1994 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government