You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Acoustic Pressure Gradient Imager For Divers
SBC: EMPIRICAL TECHNOLOGIES CORPORATION Topic: N/AThe contractor has patented technology for a unique process that directly converts a two-dimensional acoustic disturbance, such as a wave front, into an intensity-mapped visible image in real-time without electronic circuitry; that is, it is a direct pressure gradient imager. The imager relies on the piezo-dichroic properties of a continuous layer of a dichroic material thin film that serves as bo ...
SBIR Phase I 1994 Department of DefenseSpecial Operations Command -
AN YTTRIUM ALUMINUM PEROVSKITE BASED GAMMA-RAY DOSIMETER
SBC: W Peter Trower Inc. Topic: N/AN/A
SBIR Phase I 1994 Nuclear Regulatory Commission -
A PORTABLE IMAGING SYSTEM FOR NONDESTRUCTIVE EXAMINATION OF NUCLEAR POWER PLANT COMPONENTS
SBC: TPL, INC Topic: N/AN/A
SBIR Phase I 1992 Nuclear Regulatory Commission -
Development of a Performance Assessment Process Controller
SBC: Innovative Tech. Solutions Topic: N/AN/A
SBIR Phase I 1995 Nuclear Regulatory Commission -
ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT
SBC: MISSION RESEARCH CORP. Topic: N/AMRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...
SBIR Phase I 1990 Nuclear Regulatory Commission -
Electromagnetic Pulse Mine Countermeasure Device
SBC: Vail Research & Technology Topic: N/ANaval Special Warfare is developing and testing equipment and tactics for neutralization of anti-invasion mines in the very shallow water maritime environment. The device proposed herein, an electromagnetic pulse mine countermeasure device, will enhance the capability of Naval Special Warfare to neutralize mines. The proposed device is expected to be effective against most, if not all, mine types, ...
SBIR Phase I 1994 Department of DefenseSpecial Operations Command