You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Automatic Feature Combined Track-Detect-Localize Technique
SBC: DIGITAL SYSTEM RESOURCES, INC. Topic: N/AA progressive system development is proposed which uses Bayesian methodology for combined detect, track, localize, and classify. The core paradigm focuses on detection followed by various estimation schemes to extract information on contact type, track, and location from the detector. A rapid prototype development using the Generic Multipurpose Processor (GMP) will provide optimal detection ...
SBIR Phase I 1997 Department of DefenseNavy -
Simulation Based Concurrent Planning And Development System
SBC: DIGITAL SYSTEM RESOURCES, INC. Topic: N/AN/A
SBIR Phase I 1997 Department of DefenseNavy -
Neutron Radiography with Inorganic Scintillation Detectors
SBC: World Physics Technologies, Inc. Topic: N/AWe propose here to evaluate a variety of inorganic scintillators, including sodium iodide and bismuth germanate, for use in energy-sensitive neutron detectors. We will couple these crystals to photomultiplier tubes and measure the prompt response to inelastic neutron reactions with the scintillator atoms. To unfold the incident neutron energy distribution from the resulting signal pulse heights, ...
SBIR Phase I 1996 Department of Transportation -
Water Quality Monitoring Device
SBC: Gky And Associates, Inc. Topic: N/AN/A
SBIR Phase I 1996 Department of Transportation -
MULTI-WARFARE ASSESSMENT PLANNING AND DEVELOPMENT
SBC: SYSTEMS PLANNING & ANALYSIS, INC. Topic: N/AN/A
SBIR Phase I 1988 Department of DefenseNavy -
Simulation Based Design for Submarine C4I Applications
SBC: TRIDENT SYSTEMS LLC Topic: N/AN/A
SBIR Phase I 1994 Department of DefenseNavy -
Ionic Self-Assembled Organic/ Inorganic Nonparticle Coatings and Composites
SBC: LUNA INNOVATIONS INCORPORATED Topic: N/AN/A
SBIR Phase I 1997 Department of Transportation -
A Proposal to Develop the UTD Breakaway Link for Use in Utility Pole Guy Wires
SBC: UTD, INC. Topic: N/AN/A
SBIR Phase I 1997 Department of Transportation -
A Polar Nephelometer Beta-C Meter to support underwater optical
SBC: Global Assoc., Ltd. Topic: N/AN/A
SBIR Phase I 1994 Department of DefenseNavy -
Feasibility Study of an Internet-Based GUI for Highway Capacity Software
SBC: Viggen Corp.on Topic: N/AN/A
SBIR Phase I 1996 Department of Transportation