You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
FIBER OPTIC SENSOR FOR IMPROVED IMMUNOASSAY FOR PATHOGENS IN SEAFOOD
SBC: American Research Corporation of Virginia Topic: N/ATHE IMPACT OF INDUSTRIALIZATION IN COASTAL REGIONS AND THE DEGRADATION OF ENVIRONMENTAL CONDITIONS IN THE VICINITY OF SEAFOOD PRODUCING REGIONS HAS BECOME EVIDENT FROM THE QUALITY OF FOODS PRODUCED IN THESE REGIONS. AFFINITY PURIFIED POLYCLONAL ANTIBODIES ARE BEING DEVELOPED TO PROVIDE A RAPID METHOD FOR THE EVALUATION OF LISTERIA MONO- CYTOGENES AND TOXINS FROM VIBRIO CHOLERAE IMPLICATED IN FOODP ...
SBIR Phase I 1988 Department of Commerce -
VALIDATION & TESTING OF THE VAM2D COMPUTER CODE
SBC: Hydrogeologic Inc. Topic: N/AN/A
SBIR Phase I 1988 Nuclear Regulatory Commission -
MICRO COMPUTER BASED PARALLEL PROCESSING SYSTEM FOR CODE COMPUTATIONS
SBC: Risk Management Systems Topic: N/AN/A
SBIR Phase I 1988 Nuclear Regulatory Commission -
NEURAL NETWORK APPLICATIONS FOR CLOUD-TRACK WIND DETERMINATION
SBC: ATMOSPHERIC & ENVIRONMENTAL RESEARCH, INC. Topic: N/AWE PROPOSE TO APPLY ARTIFICIAL NEURAL NETWORKS TO THE DERIVATION OF CLOUD MOTION VECTORS FROM SATELLITE IMAGERY. IN PHASE I, WE WILL CONCENTRATE ON USING A NEURAL NETWORK IN THE FIRST STEP IN THE DERIVATIO OF CLOUD MOTION VECTORS, THE HEIGHT ASSIGNMENT AND TARGET SELECTION. THE NEURAL NETWORK COMBINES, AT EACH IMAGE PIXEL, BRIGHTNESS IN DIFFERENT CHANNELS TO DETERMINE CLOUD TYPE AND LEVEL (I.E., L ...
SBIR Phase I 1994 Department of Commerce -
ADVANCED SYSTEM FOR MINEHUNTING AND OCEANOGRAPHIC REMOTE SENSING
SBC: Atlantic Applied Research Corp Topic: N/AN/A
SBIR Phase I 1994 Department of Commerce -
PARALLEL METHODS FOR THE SCHROEDINGER EQUATION
SBC: Aware, Inc. Topic: N/AWE WILL DEVELOP WAVELET-BASED DOMAIN DECOMPOSITION PROCEDURES FOR THE SOLUTION OF THE INITIAL VALUE PROBLEM FOR THE SCHROEDINGER EQUATION ON MULTIDIMENSIONAL SPATIAL DOMAINS. ACCURATE AND PRACTICAL NUMERICAL CALCULATIONS WOULD BE OF GREAT USE IN THE IMPLEMENTATION AND EXTENSION OF THE BORN-OPPENHEIMER PROCEDURE. BEING BOTH COMPACTLY SUPPORTED AND ORTHOGONAL, WAVELETS COMBINE THE ADVANTAGES OF FINI ...
SBIR Phase I 1994 Department of Commerce -
ASSESSING AND INCREASING THE TESTABILITY OF OBJECT-ORIENTED SOFTWARE
SBC: Cigital, Inc. Topic: N/AN/A
SBIR Phase I 1994 Department of Commerce -
RESISITVE HEAT CURED RESIN TRANSFER MOLDING OF ADVANCED COMPOSITES
SBC: Conductive Composites Tech,inc Topic: N/AN/A
SBIR Phase I 1994 Department of Commerce -
NO MOVING PARTS RAIN GAUGE
SBC: THE CORE GROUP, INC. Topic: N/ATHE U.S. WEATHER SERVICE PRESENTLY USES A "TIPPING BUCKET" RAIN GAUGE FOR MEASURING RAIN ACCUMULATION. THIS DEVICE IS SENSITIVE TO WIND AND MOTION (AS ON BUOYS), CANNOT MEASURE RAIN RATE, AND REQUIRES FREQUENT MAINTENANCE, BECAUSE OF MOVING PARTS. AN ALTERNATIVE DEVICE IS BEING PROPOSED, WHICH INCORPORATES A RIGID, RESONANT TUBE, CLOSED AT THE TOP BY AN ELECTRO-ACOUSTIC TRANSDUCER, AND AT THE BOTT ...
SBIR Phase I 1994 Department of Commerce -
THE DEVELOPMENT OF A LOW COST MANUFACTURING PROCESS FOR PRODUCTION OF HIGH QUALITY TITANIUM SURGICAL IMPLANT COMPONENTS
SBC: DYNAMET TECHNOLOGY, INC. Topic: N/AADVANCES IN TITANIUM ALLOY POWDER METALLURGY (P/M), UTILIZING HIGH PURITY STARTING POWDERS, HAVE RESULTED IN STATIC AND DYNAMIC MECHANICAL PROPERTIES COMPARABLE TO WROUGHT TITANIUM ALLOYS. THE DEVELOPMENTS OVERCOME EARLIER LIMITATIONS IN FATIGUE RESISTANCE WHICH RESTRICTED P/M TITANIUM USAGE FROM THE DEMANDING REQUIREMENTS OF SURGICAL IMPLANTS. DUE TO THE INHERENT ECONOMIES OF P/M PROCESSES, P/M T ...
SBIR Phase I 1994 Department of Commerce