You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. NEW SENSOR FOR MEASUREMENT OF AIR MOVEMENT

    SBC: ANALYSIS AND MEASUREMENT SERVICE CORPORATION            Topic: N/A

    THIS PROPOSAL IS PREPARED IN DIRECT RESPONSE TO THE NRC'S SOLICITATION FOR AN IMPROVED DEVICE TO MEASURE AIR MOVEMENT FOR PERSONNEL RADIATION PROTECTION AND HEALTH PHYSICS APPLICATIONS IN NUCLEAR FACILITIES. THE PURPOSE OF THE NEW DEVICE IS TO PROPERLY LOCATE AIR SAMPLERS SO THAT THE AIR SAMPLED IS REPRESENTATIVE OF THE AIR INHALED BY WORKERS. ALTHOUGH AIR FLOW RATE SENSORS SUCH AS ANEMOMETERS ARE ...

    SBIR Phase I 1994 Nuclear Regulatory Commission
  2. EFFECT OF AGING ON RESPONSE TIME OF NUCLEAR PLANT PRESSURE SENSORS

    SBC: ANALYSIS AND MEASUREMENT SERVICE CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1988 Nuclear Regulatory Commission
  3. EXPERIMENTAL EVALUATION OF FIBER OPTIC PRESSURE SENSORS FOR NUCLEAR POWER PLANTS

    SBC: ANALYSIS AND MEASUREMENT SERVICE CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1994 Nuclear Regulatory Commission
  4. IMPROVED STEADY-STATE INITIALIZATION ALGORITHMS FOR COMPUTER CODES

    SBC: Compu Simulation & Anal I            Topic: N/A

    N/A

    SBIR Phase I 1992 Nuclear Regulatory Commission
  5. ENHANCED REMOVAL OF RADIOACTIVE PARTICLES BY FLUOROCARBON SURFACTANT SOLUTIONS

    SBC: Entropic Systems, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1992 Nuclear Regulatory Commission
  6. ENHANCEMENT TO STEAM GENERATOR TUBING EDDY CURRENT INSPECTION BY APPLICATION OF THERMALLY INDUCED STRESSES

    SBC: FOSTER-MILLER, INC.            Topic: N/A

    STEAM GENERATOR TUBES REPRESENT A UNIQUE PART OF THE REACTOR COOLANT SYSTEM (RCS). LEAKAGE FROM ANY OTHER PART OF THE RCS IS CAPTURED BY THE CONTAINMENT BUILDING, BUT STEAM GENERATOR TUBE LEAKAGE IS TRANSPORTED OUT OF THE CONTAINMENT BUILDING ALONG WITH THE STEAM, WHICH IS NORMALLY UNCONTAMINATED. STEAM GENERATOR TUBES, CONSEQUENTLY, DESERVE, AND RECEIVE SPECIAL CONSIDERATION. THE ASSURANCE OF STE ...

    SBIR Phase I 1992 Nuclear Regulatory Commission
  7. NONDESTRUCTIVE EXAMINATION TO DIRECTLY MEASURE STEAM GENERATOR TUBE U-BEND VIBRATORY RESPONSE

    SBC: FOSTER-MILLER, INC.            Topic: N/A

    ON FEBRUARY 9, 1991, AT THE MIHAMA UNIT 2 NUCLEAR POWER STATION, OPEARTED BY KANSAI ELECTRIC CORPORATION, A STEAM GENERATOR TUBE RUPTURED AND RELEASED APPROXIMATELY 9,000 GALLONS OF REACTOR COOLANT INTO THE SECONDARY SYSTEM. THE LEAKAGE CAUSED A RAPID DEPRESSURIZATION OF THE REACTOR COOLANT SYSTEM, WHICH RESULTED IN AN AUTOMATIC REACTOR TRIP AND ACTUATION OF THE HIGH PRESSURE SAFETY INJECTION SYST ...

    SBIR Phase I 1992 Nuclear Regulatory Commission
  8. VALIDATION & TESTING OF THE VAM2D COMPUTER CODE

    SBC: Hydrogeologic Inc.            Topic: N/A

    N/A

    SBIR Phase I 1988 Nuclear Regulatory Commission
  9. Development of a Performance Assessment Process Controller

    SBC: Innovative Tech. Solutions            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  10. DEV OF A LARGE CROSS SECTIONAL AREA SELF-POWERED DETECTOR

    SBC: K E M P CORP            Topic: N/A

    N/A

    SBIR Phase I 1988 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government