You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Virtual Environment Training for Trauma Management
SBC: HT Medical Systems, Inc. Topic: N/AN/A
SBIR Phase I 1995 Department of DefenseNavy -
Automatic Feature Combined Track-Detect-Localize Technique
SBC: DIGITAL SYSTEM RESOURCES, INC. Topic: N/AA progressive system development is proposed which uses Bayesian methodology for combined detect, track, localize, and classify. The core paradigm focuses on detection followed by various estimation schemes to extract information on contact type, track, and location from the detector. A rapid prototype development using the Generic Multipurpose Processor (GMP) will provide optimal detection ...
SBIR Phase I 1997 Department of DefenseNavy -
A Rapid Test for Interferon alpha To Screen Viral from Bacterial Infections
SBC: CYTIMMUNE SCIENCES, INC. Topic: N/AEstablishing interferon-a as a surrogate marker of viral infection will enable the differential diagnosis of viral vs bacterial infections. Such information will be critical to subsequent treatments. The current proposal is designed to evaluate CytImmune Science's patent pending technology for cytokine measurement in biological fluids. The technology overcomes the presence of cytokine binding p ...
SBIR Phase I 1995 Department of DefenseNavy -
Simulation Based Concurrent Planning And Development System
SBC: DIGITAL SYSTEM RESOURCES, INC. Topic: N/AN/A
SBIR Phase I 1997 Department of DefenseNavy -
Improved Hull Form Patrol Combatant
SBC: MARITIME APPLIED PHYSICS CORPORATION Topic: N/AA concept design will be performed to allow the conversion of a 160-foot Athena Class Gunboat (PG) to a HYSWAS hull form. This work will be performed by the same team of personnel who designed and built the 27-foot HYSWAS demostration vessel QUEST under an earlier Phase II SBIR. The proposed design will provide high endurance, speeds above 40 knots in sea state 5, a large payload fraction a ...
SBIR Phase I 1997 Department of DefenseNavy -
Nanolaminate-based Infrared Coating
SBC: SIGMA TECHNOLOGIES INTERNATIONAL GROUP, INC. Topic: N/AN/A
SBIR Phase I 1994 Department of DefenseNavy -
Antenna for GPS CCM Improvement (SPC Proposal 5179)
SBC: System Planning Corp. Topic: N/AAntijam protection for GPS receivers can be provided in a cost-effective way by restricting the antenna reception to the upper hemisphere only, thereby eliminating the majority of intentional and unintentional jamming sources in either a war- fighting context or terrorist attack scenario. Competing schemes using null- steering antennas or receiver/processor improvements are not cost effective and ...
SBIR Phase I 1995 Department of DefenseNavy -
Submarine Combat System C4I and IM and M Technology
SBC: DARLINGTON, INC. Topic: N/AN/A
SBIR Phase I 1995 Department of DefenseNavy -
MULTI-WARFARE ASSESSMENT PLANNING AND DEVELOPMENT
SBC: SYSTEMS PLANNING & ANALYSIS, INC. Topic: N/AN/A
SBIR Phase I 1988 Department of DefenseNavy -
Electro-Optics Window for Shipboard Application
SBC: Infrared Fiber Systems, Inc. Topic: N/AA new infrared transmitting glass will be developed based on fluorophosphate for fabricating large diameter IR and multi-spectral laser windows. Unlike other infrared glasses based on the fluorides, the fluorophosphate glass has excellent chemical durability and glass forming ability. During Phase I, high stability glass will be developed having a minimum of optical path distortion and good ...
SBIR Phase I 1997 Department of DefenseNavy