You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Ultrafast Polysilylene Scintillators
SBC: Adherent Technologies, Inc. Topic: N/AN/A
SBIR Phase I 1996 Department of Energy -
APPLE PACKING LINE VISION ROBOTIC SYSTEM FOR DEFECT REMOVAL
SBC: AGRI-TECH, Inc. Topic: N/AN/A
SBIR Phase I 1994 Department of Agriculture -
Surface Enhanced Raman Scattering For Field
SBC: American Research Corporation of Virginia Topic: N/AThe use of sub-therapeutic concentrations of anti-microbial agents in animal feed has contributed to theproductivity of the U.S. meat and dairy industries by preventing infectious diseases, by decreasing theamount of feed required and by increasing the rate of animal weight gain. However, failure to observerecommended practices of drug withdrawal can result in concentrations of antibiotic residue ...
SBIR Phase I 1997 Department of Agriculture -
Template-Medicated Synthesis of Periodic Membranes for Improved Liquid-Phase Separations
SBC: American Research Corporation of Virginia Topic: N/AN/A
SBIR Phase I 1996 Department of Energy -
A HIGH POWER THICK TARGET DESIGN FOR IRRADIATION BY HIGH INTENSITY CHARGED PARTICLE BEAMS
SBC: Amparo Corp.on Topic: N/APHASE I ADDRESSES A NEW APPROACH FOR THE DESIGN OF HIGH POWER NUCLEAR TARGETS USED FOR PRODUCTION OF RADIOISOTOPES BY HIGH ENERGY CHARGED PARTICLE BEAMS, NOTABLY HIGH ENERGY PROTONS. SUCH TARGETS WILL YIELD LARGER QUANTITIES OF RADIOACTIVE SPECIES THAN PRESENTLY AVAILABLE, EITHER FOR BASIC RESEARCH (E.G., STUDIES USING RADIOACTIVE BEAMS) OR FOR APPLIED PURPOSES (E.G., PRODUCTION OF MEDICAL RADIOI ...
SBIR Phase I 1994 Department of Energy -
High Power Target Design for a Next Generation Radioactive Beam ISOL-Type Facility
SBC: Amparo Corp.on Topic: N/AN/A
SBIR Phase I 1996 Department of Energy -
A HIGH POWER SOLID-STATE AMPLIFIER
SBC: Amparo Corp.on Topic: N/AN/A
SBIR Phase I 1994 Department of Energy -
THE PERIPHERAL COMPONENT INTERCONNECTION/SCALABLE COHERENT INTERFACE BRIDGE FOR DATA ACQUISITION AND COMPUTATION APPLICATIONS
SBC: BI RA SYSTEMS, INC Topic: N/ACOALESCING THE FRAGMENTED INFORMATION ASSOCIATED WITH EACH EVENT OF A HIGH-ENERGY PHYSICS DETECTOR AND THEN PROCESSING IT AT THE RATES DEMANDED BY ACCELERATOR SYSTEMS ARE AMONG THE LARGEST CHALLENGES IN THE PHYSICS COMMUNITY. NEW DETECTOR SYSTEMS CONTINUE TO INCREASE THE NUMBER OF MEASURED PARAMETERS AND SIMULTANEOUSLY INCREASE THE RESOLUTION OF DETECTOR COMPONENTS SO THAT THE VOLUME OF GENRATED ...
SBIR Phase I 1994 Department of Energy -
Development Of A Ready-to-assemble
SBC: Blue Ridge Timberwrights Topic: N/AThe ready-to-assemble (RTA) construction system is a new method for assembling wood structuresbuilt from the following engineered wood products: parallel strand lumber (PSL), laminated strandlumber (LSL), and laminated veneer lumber (LVL). The RTA system is designed for rapid assemblyby small crews of unskilled labor using common hand tools. The design of the RTA systemincorporates engineered w ...
SBIR Phase I 1997 Department of Agriculture -
THE DEVELOPMENT OF A MULTIPLE INPUT SPECTROMETER FOR PROCESSMONITORING APPLICATIONS
SBC: Chromex Inc. Topic: N/AN/A
SBIR Phase I 1990 Department of Energy